Search accesories

Search tires

PERFORMANCE & MOTORSPORT PARA EUROPA
Mejora la potencia, aerodinámica y manejo del coche y consigue un rendimiento superior.
Más información

PRO 2000 QRT MARTINI RACING GRAY SEAT

Ref:S008016RMRGR
Marca: Sparco
EAN-13:8033280378493
€711.90
€791.00
Envío 10 a 15 días
Productos en stock:0

Producto en fábrica:15

Categoría: Racing
compartir:

The Sparco Pro 2000 QRT offers a more precise driving position, greater lateral support, and a clearly sporty aesthetic. It is a modern classic within the Sparco catalog: well-tested in competition, comfortable, with non-slip fabric and a lightweight QRT shell.<\/p>

It fits both well-maintained street projects and competition, track day, or sim racing preparations.<\/p>

  • Version / Finish:<\/strong> Martini Racing Edition<\/li>
  • Weight:<\/strong> Shell 6.8 kg / Seat 8.0 kg<\/li>
  • Dimensions:<\/strong> Height 86.7 cm | Shoulders 58 cm | Base ext. 48 cm | Length 63 cm<\/li>
  • Homologation:<\/strong> FIA 8855-1999<\/li>
  • Mounting:<\/strong> Lateral 290 mm; depending on the version, it allows for lower/base mounting<\/li><\/ul>
Read moreShow less

PRODUCTOS EN LA MISMA CATEGORÍA

RECARO CROSS SPORTSTER CS HEATED SEATS, BLACK ARTIFICIAL LEATHER/DINAMICA PILOT BLACK
Envío 30 a 60 días
Ref:RC414101575
€1,903.50
€2,115.00
10%
rebajado
RECARO (TUV) POLE POSITION SEAT - BLACK ARTIFICIAL LEATHER/DINAMICA BLACK DRIVER & PASSENGER
Envío 10 a 15 días
Ref:RC070770885
€1,102.95
€1,225.50
10%
rebajado
Gloves Sparco Meca 3 size 11 (L) black | OCC Sport
Entrega 24/48 h
Ref:S002093NR3L
€32.40
€36.00
10%
rebajado
Flat bottom steering wheel suede black arms | OCC Sport
Entrega 24/48 h
Ref:OCCVOL010
€82.35
€91.50
10%
rebajado
MOMO INDY HERITAGE 350 WOODEN STEERING WHEEL
Entrega 24/48 h
Ref:MOMVINDYHERMW35
€375.30
€417.00
10%
rebajado
Envío 30 a 60 días
Ref:AEM-21-765C
€333.00
€370.00
10%
rebajado
Envío 30 a 60 días
Ref:AEM-21-773C
€388.80
€432.00
10%
rebajado

Search accesories

Search tires

mi carrito
Underwear
Undershirts
Pajamas
Collections
Load Time 616.512 ms
Querying Time 277 ms
Queries 391
Memory Peak Usage 32.6 Mb
Included Files 1268 files - 16.17 Mb
PrestaShop Cache - Mb
Global vars 0.57 Mb
PrestaShop Version 9.0.3
PHP Version 8.4.17
MySQL Version 10.11.16-MariaDB-deb12-log
Memory Limit 1G
Max Execution Time 600s
Smarty Cache enabled
Smarty Compilation auto
  Time Cumulated Time Memory Usage Memory Peak Usage
config 54.591 ms 54.591 ms 3.49 Mb 3.6 Mb
__construct 0.021 ms 54.612 ms - Mb 3.6 Mb
init 42.363 ms 96.975 ms 1.81 Mb 5.5 Mb
checkAccess 0.003 ms 96.978 ms - Mb 5.5 Mb
setMedia 3.805 ms 100.783 ms 0.04 Mb 5.5 Mb
postProcess 0.009 ms 100.792 ms - Mb 5.5 Mb
initHeader 0.002 ms 100.794 ms - Mb 5.5 Mb
initContent 312.675 ms 413.469 ms 14.62 Mb 20.4 Mb
initFooter 0.003 ms 413.472 ms - Mb 20.4 Mb
display 203.040 ms 616.512 ms 11.33 Mb 32.6 Mb
Hook Time Memory Usage
DisplayHeader 253.804 ms 12.70 Mb
DisplayWrapperBottom 120.546 ms 4.94 Mb
OverrideLayoutTemplate 53.212 ms 3.16 Mb
DisplayBeforeBodyClosingTag 18.158 ms 0.67 Mb
ActionFrontControllerInitAfter 13.165 ms 0.54 Mb
FilterProductContent 13.144 ms 0.20 Mb
DisplayCategoryCustomFilters 12.263 ms 0.32 Mb
displayLeftColumnProduct 12.005 ms 0.57 Mb
DisplayProductShippingTag 6.561 ms 0.44 Mb
renderWidget 4.028 ms 0.15 Mb
DisplayFooter 1.268 ms 0.05 Mb
DisplayProductAdditionalInfo 1.250 ms 0.06 Mb
ActionFrontControllerSetMedia 0.809 ms 0.01 Mb
Header 0.790 ms 0.02 Mb
DisplayAfterProductThumbs 0.683 ms 0.02 Mb
ActionPresentCart 0.392 ms 0.02 Mb
ActionOutputHTMLBefore 0.259 ms - Mb
ModuleRoutes 0.230 ms 0.03 Mb
DisplayProductDocumentation 0.095 ms - Mb
DisplayOverrideTemplate 0.027 ms - Mb
20 hook(s) 512.690 ms 23.89 Mb
Module Time Memory Usage
stsitebuilder 450.272 ms 21.79 Mb
onepagecheckoutps 5.224 ms 0.12 Mb
ybc_blog 6.068 ms 0.39 Mb
p2wavemarket 0.858 ms 0.12 Mb
ps_emailsubscription 1.018 ms 0.06 Mb
ps_emailalerts 0.225 ms 0.01 Mb
llantassearch 7.224 ms 0.07 Mb
searchcustom 6.510 ms 0.21 Mb
rcpgtagmanager 5.349 ms - Mb
desfinder 0.678 ms 0.01 Mb
productcomments 13.528 ms 0.21 Mb
ps_shoppingcart 0.274 ms 0.01 Mb
ps_searchbar 0.804 ms 0.01 Mb
freeshippingamountdisplay 0.512 ms 0.01 Mb
redsys 1.006 ms 0.19 Mb
paypal 1.852 ms 0.08 Mb
sldquickorder 0.335 ms - Mb
dusnicsyncocc 3.839 ms 0.45 Mb
desoccfeatures 0.952 ms 0.03 Mb
descpdftoreference 0.239 ms 0.01 Mb
desoccstockerp 7.204 ms 0.49 Mb
dessoccerp 0.127 ms 0.01 Mb
ps_languageselector 1.003 ms 0.04 Mb
ps_currencyselector 3.303 ms 0.12 Mb
des_categorytree 12.153 ms 0.57 Mb
statsdata 2.425 ms 0.11 Mb
26 module(s) 532.982 ms 24.97 Mb

Stopwatch SQL - 391 queries

# Query Time (ms) Rows Filesort Group By Location
149
SELECT SQL_NO_CACHE c.`name`, cl.`id_lang`, IF(cl.`id_lang` IS NULL, c.`value`, cl.`value`) AS value, c.id_shop_group, c.id_shop
FROM `tmohz_configuration` c
LEFT JOIN `tmohz_configuration_lang` cl ON (c.`id_configuration` = cl.`id_configuration`)
16.105 ms 7221 /classes/Configuration.php:182
146
SELECT SQL_NO_CACHE c.`name`, cl.`id_lang`, IF(cl.`id_lang` IS NULL, c.`value`, cl.`value`) AS value, c.id_shop_group, c.id_shop
FROM `tmohz_configuration` c
LEFT JOIN `tmohz_configuration_lang` cl ON (c.`id_configuration` = cl.`id_configuration`)
10.096 ms 7221 /classes/Configuration.php:182
147
SELECT SQL_NO_CACHE c.`name`, cl.`id_lang`, IF(cl.`id_lang` IS NULL, c.`value`, cl.`value`) AS value, c.id_shop_group, c.id_shop
FROM `tmohz_configuration` c
LEFT JOIN `tmohz_configuration_lang` cl ON (c.`id_configuration` = cl.`id_configuration`)
9.932 ms 7221 /classes/Configuration.php:182
267
SELECT SQL_NO_CACHE COUNT(cp.`id_product`) AS total
FROM `tmohz_product` p
INNER JOIN tmohz_product_shop product_shop
ON (product_shop.id_product = p.id_product AND product_shop.id_shop = 1)
LEFT JOIN `tmohz_category_product` cp ON p.`id_product` = cp.`id_product`
WHERE cp.`id_category` = 2 AND product_shop.`visibility` IN ("both", "catalog") AND product_shop.`active` = 1 LIMIT 1
9.846 ms 1177 /classes/Category.php:1021
151
SELECT SQL_NO_CACHE c.`name`, cl.`id_lang`, IF(cl.`id_lang` IS NULL, c.`value`, cl.`value`) AS value, c.id_shop_group, c.id_shop
FROM `tmohz_configuration` c
LEFT JOIN `tmohz_configuration_lang` cl ON (c.`id_configuration` = cl.`id_configuration`)
9.654 ms 7221 /classes/Configuration.php:182
150
SELECT SQL_NO_CACHE c.`name`, cl.`id_lang`, IF(cl.`id_lang` IS NULL, c.`value`, cl.`value`) AS value, c.id_shop_group, c.id_shop
FROM `tmohz_configuration` c
LEFT JOIN `tmohz_configuration_lang` cl ON (c.`id_configuration` = cl.`id_configuration`)
9.632 ms 7221 /classes/Configuration.php:182
2
SELECT SQL_NO_CACHE c.`name`, cl.`id_lang`, IF(cl.`id_lang` IS NULL, c.`value`, cl.`value`) AS value, c.id_shop_group, c.id_shop
FROM `tmohz_configuration` c
LEFT JOIN `tmohz_configuration_lang` cl ON (c.`id_configuration` = cl.`id_configuration`)
9.629 ms 7221 /classes/Configuration.php:182
152
SELECT SQL_NO_CACHE c.`name`, cl.`id_lang`, IF(cl.`id_lang` IS NULL, c.`value`, cl.`value`) AS value, c.id_shop_group, c.id_shop
FROM `tmohz_configuration` c
LEFT JOIN `tmohz_configuration_lang` cl ON (c.`id_configuration` = cl.`id_configuration`)
9.596 ms 7221 /classes/Configuration.php:182
144
SELECT SQL_NO_CACHE c.`name`, cl.`id_lang`, IF(cl.`id_lang` IS NULL, c.`value`, cl.`value`) AS value, c.id_shop_group, c.id_shop
FROM `tmohz_configuration` c
LEFT JOIN `tmohz_configuration_lang` cl ON (c.`id_configuration` = cl.`id_configuration`)
9.525 ms 7221 /classes/Configuration.php:182
148
SELECT SQL_NO_CACHE c.`name`, cl.`id_lang`, IF(cl.`id_lang` IS NULL, c.`value`, cl.`value`) AS value, c.id_shop_group, c.id_shop
FROM `tmohz_configuration` c
LEFT JOIN `tmohz_configuration_lang` cl ON (c.`id_configuration` = cl.`id_configuration`)
9.525 ms 7221 /classes/Configuration.php:182
145
SELECT SQL_NO_CACHE c.`name`, cl.`id_lang`, IF(cl.`id_lang` IS NULL, c.`value`, cl.`value`) AS value, c.id_shop_group, c.id_shop
FROM `tmohz_configuration` c
LEFT JOIN `tmohz_configuration_lang` cl ON (c.`id_configuration` = cl.`id_configuration`)
8.415 ms 7221 /classes/Configuration.php:182
255
SELECT SQL_NO_CACHE c.*, cl.*
FROM `tmohz_category` c
INNER JOIN tmohz_category_shop category_shop
ON (category_shop.id_category = c.id_category AND category_shop.id_shop = 1)
LEFT JOIN `tmohz_category_lang` cl ON c.`id_category` = cl.`id_category` AND cl.id_shop = 1 
LEFT JOIN `tmohz_category_group` cg ON c.`id_category` = cg.`id_category`
RIGHT JOIN `tmohz_category` c2 ON c2.`id_category` = 2 AND c.`nleft` &gt;= c2.`nleft` AND c.`nright` &lt;= c2.`nright`
WHERE 1 AND c.`level_depth` &lt;= 5 AND `id_lang` = 2
AND c.`active` = 1
AND cg.`id_group` IN (1)
GROUP BY c.`id_category`
ORDER BY c.`level_depth` ASC, category_shop.`position` ASC
4.635 ms 176 Yes Yes /classes/Category.php:815
70
SELECT SQL_NO_CACHE `id_hook`, `name`
FROM `tmohz_hook`
UNION
SELECT `id_hook`, ha.`alias` as name
FROM `tmohz_hook_alias` ha
INNER JOIN `tmohz_hook` h ON ha.name = h.name
3.789 ms 0 /classes/Hook.php:1577
16
SELECT SQL_NO_CACHE h.`name` as hook, m.`id_module`, h.`id_hook`, m.`name` as module
FROM `tmohz_module` m
INNER JOIN tmohz_module_shop module_shop
ON (module_shop.id_module = m.id_module AND module_shop.id_shop = 1)
INNER JOIN `tmohz_hook_module` `hm` ON hm.`id_module` = m.`id_module`
INNER JOIN `tmohz_hook` `h` ON hm.`id_hook` = h.`id_hook`
LEFT JOIN `tmohz_module_group` `mg` ON mg.`id_module` = m.`id_module`
WHERE (h.`name` != "paymentOptions") AND (hm.`id_shop` = 1) AND (mg.id_shop = 1 AND  mg.`id_group` IN (1))
GROUP BY hm.id_hook, hm.id_module
ORDER BY hm.`position`
3.663 ms 158 Yes Yes /classes/Hook.php:1509
385
SELECT SQL_NO_CACHE * FROM tmohz_llantassearch_category c WHERE id_parent=0 ORDER BY name
3.394 ms 3268 Yes /modules/llantassearch/llantassearch.php:614
71
SELECT SQL_NO_CACHE h.id_hook, h.name as h_name, title, description, h.position, hm.position as hm_position, m.id_module, m.name, m.active
FROM `tmohz_hook_module` hm
STRAIGHT_JOIN `tmohz_hook` h ON (h.id_hook = hm.id_hook AND hm.id_shop = 1)
STRAIGHT_JOIN `tmohz_module` as m ON (m.id_module = hm.id_module)
ORDER BY hm.position
3.052 ms 484 /classes/Hook.php:495
116
SELECT SQL_NO_CACHE p.*, product_shop.*, stock.out_of_stock, IFNULL(stock.quantity, 0) as quantity, pl.`description`, pl.`description_short`, pl.`link_rewrite`,
pl.`meta_description`, pl.`meta_title`, pl.`name`, pl.`available_now`, pl.`available_later`,
image_shop.`id_image` id_image, il.`legend`, m.`name` as manufacturer_name, cl.`name` AS category_default, IFNULL(product_attribute_shop.id_product_attribute, 0) id_product_attribute,
DATEDIFF(
p.`date_add`,
DATE_SUB(
"2026-04-21 00:00:00",
INTERVAL 20 DAY
)
) &gt; 0 AS new
FROM `tmohz_accessory`
LEFT JOIN `tmohz_product` p ON p.`id_product` = `id_product_2`
INNER JOIN tmohz_product_shop product_shop
ON (product_shop.id_product = p.id_product AND product_shop.id_shop = 1)
LEFT JOIN `tmohz_product_attribute_shop` product_attribute_shop
ON (p.`id_product` = product_attribute_shop.`id_product` AND product_attribute_shop.`default_on` = 1 AND product_attribute_shop.id_shop=1)
LEFT JOIN `tmohz_product_lang` pl ON (
p.`id_product` = pl.`id_product`
AND pl.`id_lang` = 2 AND pl.id_shop = 1 
)
LEFT JOIN `tmohz_category_lang` cl ON (
product_shop.`id_category_default` = cl.`id_category`
AND cl.`id_lang` = 2 AND cl.id_shop = 1 
)
LEFT JOIN `tmohz_image_shop` image_shop
ON (image_shop.`id_product` = p.`id_product` AND image_shop.cover=1 AND image_shop.id_shop=1)
LEFT JOIN `tmohz_image_lang` il ON (image_shop.`id_image` = il.`id_image` AND il.`id_lang` = 2)
LEFT JOIN `tmohz_manufacturer` m ON (p.`id_manufacturer`= m.`id_manufacturer`)
LEFT JOIN tmohz_stock_available stock
ON (stock.id_product = `p`.id_product AND stock.id_product_attribute = 0 AND stock.id_shop = 1  AND stock.id_shop_group = 0  )
WHERE `id_product_1` = 46320 AND product_shop.`active` = 1 AND product_shop.`visibility` != 'none'
GROUP BY product_shop.id_product
ORDER BY pl.`name`
2.557 ms 1 Yes Yes /classes/Product.php:4505
266
SELECT SQL_NO_CACHE p.*, product_shop.*, stock.out_of_stock, IFNULL(stock.quantity, 0) AS quantity, IFNULL(product_attribute_shop.id_product_attribute, 0) AS id_product_attribute,
product_attribute_shop.minimal_quantity AS product_attribute_minimal_quantity, pl.`description`, pl.`description_short`, pl.`available_now`,
pl.`available_later`, pl.`link_rewrite`, pl.`meta_description`, pl.`meta_title`, pl.`name`, image_shop.`id_image` id_image,
il.`legend` as legend, m.`name` AS manufacturer_name, cl.`name` AS category_default,
DATEDIFF(product_shop.`date_add`, DATE_SUB("2026-04-21 00:00:00",
INTERVAL 20 DAY)) &gt; 0 AS new, product_shop.price AS orderprice, psales.`quantity` as sales
FROM `tmohz_category_product` cp
LEFT JOIN `tmohz_product` p
ON p.`id_product` = cp.`id_product`
INNER JOIN tmohz_product_shop product_shop
ON (product_shop.id_product = p.id_product AND product_shop.id_shop = 1) LEFT JOIN `tmohz_product_attribute_shop` product_attribute_shop
ON (p.`id_product` = product_attribute_shop.`id_product` AND product_attribute_shop.`default_on` = 1 AND product_attribute_shop.id_shop=1)
LEFT JOIN tmohz_stock_available stock
ON (stock.id_product = `p`.id_product AND stock.id_product_attribute = 0 AND stock.id_shop = 1  AND stock.id_shop_group = 0  )
LEFT JOIN `tmohz_category_lang` cl
ON (product_shop.`id_category_default` = cl.`id_category`
AND cl.`id_lang` = 2 AND cl.id_shop = 1 )
LEFT JOIN `tmohz_product_lang` pl
ON (p.`id_product` = pl.`id_product`
AND pl.`id_lang` = 2 AND pl.id_shop = 1 )
LEFT JOIN `tmohz_image_shop` image_shop
ON (image_shop.`id_product` = p.`id_product` AND image_shop.cover=1 AND image_shop.id_shop=1)
LEFT JOIN `tmohz_image_lang` il
ON (image_shop.`id_image` = il.`id_image`
AND il.`id_lang` = 2)
LEFT JOIN `tmohz_manufacturer` m
ON m.`id_manufacturer` = p.`id_manufacturer`
LEFT JOIN `tmohz_product_sale` psales
ON psales.`id_product` = p.`id_product`
WHERE product_shop.`id_shop` = 1
AND cp.`id_category` = 2 AND product_shop.`active` = 1 AND product_shop.`visibility` IN ("both", "catalog") ORDER BY cp.`position` ASC
LIMIT 0,8
2.350 ms 1177 /classes/Category.php:1094
252
SELECT SQL_NO_CACHE * FROM tmohz_llantassearch_category c WHERE id_parent=0 ORDER BY name
2.023 ms 3268 Yes /modules/llantassearch/llantassearch.php:614
384
SELECT SQL_NO_CACHE * FROM tmohz_filter_category fc, tmohz_filter_category_lang fcl WHERE fc.id_category=fcl.id_category and fcl.id_lang=2 and id_parent=0 ORDER by fcl.name
1.806 ms 59 Yes /modules/searchcustom/searchcustom.php:762
118
SELECT SQL_NO_CACHE ag.`id_attribute_group`, ag.`is_color_group`, agl.`name` AS group_name, agl.`public_name` AS public_group_name, a.`id_attribute`, al.`name` AS attribute_name, a.`color` AS attribute_color, product_attribute_shop.`id_product_attribute`, IFNULL(stock.quantity, 0) as quantity, product_attribute_shop.`price`, product_attribute_shop.`ecotax`, product_attribute_shop.`weight`, product_attribute_shop.`default_on`, pa.`reference`, pa.`ean13`, pa.`mpn`, pa.`upc`, pa.`isbn`, product_attribute_shop.`unit_price_impact`, product_attribute_shop.`minimal_quantity`, product_attribute_shop.`available_date`, ag.`group_type`, pal.`available_now`, pal.`available_later`
FROM `tmohz_product_attribute` pa
INNER JOIN tmohz_product_attribute_shop product_attribute_shop
ON (product_attribute_shop.id_product_attribute = pa.id_product_attribute AND product_attribute_shop.id_shop = 1)
LEFT JOIN tmohz_stock_available stock
ON (stock.id_product = `pa`.id_product AND stock.id_product_attribute = IFNULL(`pa`.id_product_attribute, 0) AND stock.id_shop = 1  AND stock.id_shop_group = 0  )
LEFT JOIN `tmohz_product_attribute_lang` `pal` ON pa.id_product_attribute = pal.id_product_attribute AND pal.id_lang = 2
LEFT JOIN `tmohz_product_attribute_combination` `pac` ON pac.id_product_attribute = pa.id_product_attribute
LEFT JOIN `tmohz_attribute` `a` ON a.id_attribute = pac.id_attribute
LEFT JOIN `tmohz_attribute_group` `ag` ON ag.id_attribute_group = a.id_attribute_group
LEFT JOIN `tmohz_attribute_lang` `al` ON a.id_attribute = al.id_attribute
LEFT JOIN `tmohz_attribute_group_lang` `agl` ON ag.id_attribute_group = agl.id_attribute_group
INNER JOIN tmohz_attribute_shop attribute_shop
ON (attribute_shop.id_attribute = a.id_attribute AND attribute_shop.id_shop = 1)
WHERE (pa.id_product = 46320) AND (al.id_lang = 2) AND (agl.id_lang = 2)
GROUP BY id_attribute_group, id_product_attribute
ORDER BY ag.position ASC, a.position ASC, agl.name ASC
1.715 ms 1 Yes Yes /classes/Product.php:4391
15
SELECT SQL_NO_CACHE lower(name) as name
FROM `tmohz_hook` h
WHERE (h.active = 1)
1.443 ms 1237 /classes/Hook.php:1617
188
SELECT SQL_NO_CACHE *
FROM `tmohz_category` c
INNER JOIN tmohz_category_shop category_shop
ON (category_shop.id_category = c.id_category AND category_shop.id_shop = 1)
LEFT JOIN `tmohz_category_lang` cl ON c.`id_category` = cl.`id_category` AND cl.id_shop = 1 
WHERE 1  and c.id_category IN (57,58,59,60,61,62,63,63,65,66,67,68,69,70)  AND `id_lang` = 2
AND `active` = 1
ORDER BY c.`level_depth` ASC, category_shop.`position` ASC
1.431 ms 13 Yes /classes/Category.php:657
100
SELECT SQL_NO_CACHE c.*, cl.`id_lang`, cl.`name`, cl.`description`, cl.`additional_description`, cl.`link_rewrite`, cl.`meta_title`, cl.`meta_description`
FROM `tmohz_category` c
INNER JOIN tmohz_category_shop category_shop
ON (category_shop.id_category = c.id_category AND category_shop.id_shop = 1)
LEFT JOIN `tmohz_category_lang` cl ON (c.`id_category` = cl.`id_category` AND `id_lang` = 2  AND cl.id_shop = 1 )
LEFT JOIN `tmohz_category_group` cg ON (cg.`id_category` = c.`id_category`)
WHERE `id_parent` = 98
AND `active` = 1
AND cg.`id_group` =1
GROUP BY c.`id_category`
ORDER BY `level_depth` ASC, category_shop.`position` ASC
1.354 ms 8 Yes Yes /classes/Category.php:946
333
SELECT SQL_NO_CACHE p.*,
ps.*,
pl.*,
sa.out_of_stock,
IFNULL(sa.quantity, 0) as quantity,
(DATEDIFF(
p.`date_add`,
DATE_SUB(
'2026-04-21 00:00:00',
INTERVAL 20 DAY
)
) &gt; 0) as new
FROM tmohz_product p
LEFT JOIN tmohz_product_lang pl
ON pl.id_product = p.id_product
AND pl.id_shop = 1
AND pl.id_lang = 2
LEFT JOIN tmohz_stock_available sa   ON sa.id_product = p.id_product
AND sa.id_product_attribute = 0
AND sa.id_shop = 1 LEFT JOIN tmohz_product_shop ps
ON ps.id_product = p.id_product
AND ps.id_shop = 1
WHERE p.id_product IN (11716)
1.307 ms 1 /classes/ProductAssembler.php:70
250
SELECT SQL_NO_CACHE * FROM tmohz_filter_category fc, tmohz_filter_category_lang fcl WHERE fc.id_category=fcl.id_category and fcl.id_lang=2 and id_parent=0 ORDER by fcl.name
1.288 ms 59 Yes /modules/searchcustom/searchcustom.php:762
382
INSERT INTO `tmohz_connections_source` (`id_connections`, `http_referer`, `request_uri`, `keywords`, `date_add`) VALUES ('87148', '', 'new.ckcautosport.com/en/racing/46320-asiento-pro-2000-qrt-martini-raci.html', '', '2026-04-21 13:25:46')
1.256 ms 1 /classes/ObjectModel.php:535
191
SELECT SQL_NO_CACHE *
FROM `tmohz_category` c
INNER JOIN tmohz_category_shop category_shop
ON (category_shop.id_category = c.id_category AND category_shop.id_shop = 1)
LEFT JOIN `tmohz_category_lang` cl ON c.`id_category` = cl.`id_category` AND cl.id_shop = 1 
WHERE 1  and c.id_category IN (34,35)  AND `id_lang` = 2
AND `active` = 1
ORDER BY c.`level_depth` ASC, category_shop.`position` ASC
1.193 ms 2 Yes /classes/Category.php:657
216
SELECT SQL_NO_CACHE *
FROM `tmohz_category` c
INNER JOIN tmohz_category_shop category_shop
ON (category_shop.id_category = c.id_category AND category_shop.id_shop = 1)
LEFT JOIN `tmohz_category_lang` cl ON c.`id_category` = cl.`id_category` AND cl.id_shop = 1 
WHERE 1  and c.id_category IN (143,144,145,146,147,148,149,150,151)  AND `id_lang` = 2
AND `active` = 1
ORDER BY c.`level_depth` ASC, category_shop.`position` ASC
1.191 ms 9 Yes /classes/Category.php:657
232
SELECT SQL_NO_CACHE *
FROM `tmohz_category` c
INNER JOIN tmohz_category_shop category_shop
ON (category_shop.id_category = c.id_category AND category_shop.id_shop = 1)
LEFT JOIN `tmohz_category_lang` cl ON c.`id_category` = cl.`id_category` AND cl.id_shop = 1 
WHERE 1  and c.id_category IN (170,171,172,173,174,175,176)  AND `id_lang` = 2
AND `active` = 1
ORDER BY c.`level_depth` ASC, category_shop.`position` ASC
1.104 ms 7 Yes /classes/Category.php:657
29
SELECT SQL_NO_CACHE m.page, ml.url_rewrite, ml.id_lang
FROM `tmohz_meta` m
LEFT JOIN `tmohz_meta_lang` ml ON (m.id_meta = ml.id_meta AND ml.id_shop = 1 )
ORDER BY LENGTH(ml.url_rewrite) DESC
1.098 ms 159 Yes /classes/Dispatcher.php:643
383
SELECT SQL_NO_CACHE eb.*
FROM `tmohz_st_site_builder` eb
INNER JOIN `tmohz_st_site_builder_yuyan` `yy` ON yy.id_st_site_builder = eb.id_st_site_builder
INNER JOIN tmohz_st_site_builder_shop st_site_builder_shop
ON (st_site_builder_shop.id_st_site_builder = eb.id_st_site_builder AND st_site_builder_shop.id_shop = 1)
WHERE (eb.`post_parent` = 0 AND eb.`post_type`='' AND eb.post_status = "publish" AND eb.`type` in (120) And eb.`active` = 1 AND (yy.`id_lang`=0 OR yy.`id_lang`=2))
ORDER BY  eb.`position` asc, eb.`id_st_site_builder` desc
1.088 ms 4 Yes /modules/stsitebuilder/stsitebuilder.php:970
197
SELECT SQL_NO_CACHE *
FROM `tmohz_category` c
INNER JOIN tmohz_category_shop category_shop
ON (category_shop.id_category = c.id_category AND category_shop.id_shop = 1)
LEFT JOIN `tmohz_category_lang` cl ON c.`id_category` = cl.`id_category` AND cl.id_shop = 1 
WHERE 1  and c.id_category IN (121,122,123,124,125)  AND `id_lang` = 2
AND `active` = 1
ORDER BY c.`level_depth` ASC, category_shop.`position` ASC
1.075 ms 5 Yes /classes/Category.php:657
206
SELECT SQL_NO_CACHE *
FROM `tmohz_category` c
INNER JOIN tmohz_category_shop category_shop
ON (category_shop.id_category = c.id_category AND category_shop.id_shop = 1)
LEFT JOIN `tmohz_category_lang` cl ON c.`id_category` = cl.`id_category` AND cl.id_shop = 1 
WHERE 1  and c.id_category IN (153,154,155)  AND `id_lang` = 2
AND `active` = 1
ORDER BY c.`level_depth` ASC, category_shop.`position` ASC
1.043 ms 3 Yes /classes/Category.php:657
220
SELECT SQL_NO_CACHE *
FROM `tmohz_category` c
INNER JOIN tmohz_category_shop category_shop
ON (category_shop.id_category = c.id_category AND category_shop.id_shop = 1)
LEFT JOIN `tmohz_category_lang` cl ON c.`id_category` = cl.`id_category` AND cl.id_shop = 1 
WHERE 1  and c.id_category IN (157,158,159)  AND `id_lang` = 2
AND `active` = 1
ORDER BY c.`level_depth` ASC, category_shop.`position` ASC
1.034 ms 3 Yes /classes/Category.php:657
198
SELECT SQL_NO_CACHE *
FROM `tmohz_category` c
INNER JOIN tmohz_category_shop category_shop
ON (category_shop.id_category = c.id_category AND category_shop.id_shop = 1)
LEFT JOIN `tmohz_category_lang` cl ON c.`id_category` = cl.`id_category` AND cl.id_shop = 1 
WHERE 1  and c.id_category IN (34,35)  AND `id_lang` = 2
AND `active` = 1
ORDER BY c.`level_depth` ASC, category_shop.`position` ASC
1.025 ms 2 Yes /classes/Category.php:657
321
SELECT SQL_NO_CACHE p.*,
ps.*,
pl.*,
sa.out_of_stock,
IFNULL(sa.quantity, 0) as quantity,
(DATEDIFF(
p.`date_add`,
DATE_SUB(
'2026-04-21 00:00:00',
INTERVAL 20 DAY
)
) &gt; 0) as new
FROM tmohz_product p
LEFT JOIN tmohz_product_lang pl
ON pl.id_product = p.id_product
AND pl.id_shop = 1
AND pl.id_lang = 2
LEFT JOIN tmohz_stock_available sa   ON sa.id_product = p.id_product
AND sa.id_product_attribute = 0
AND sa.id_shop = 1 LEFT JOIN tmohz_product_shop ps
ON ps.id_product = p.id_product
AND ps.id_shop = 1
WHERE p.id_product IN (11413)
1.017 ms 1 /classes/ProductAssembler.php:70
158
DESCRIBE tmohz_ybc_blog_post
1.008 ms 1 /modules/ybc_blog/ybc_blog_defines.php:3235
344
SELECT SQL_NO_CACHE p.*,
ps.*,
pl.*,
sa.out_of_stock,
IFNULL(sa.quantity, 0) as quantity,
(DATEDIFF(
p.`date_add`,
DATE_SUB(
'2026-04-21 00:00:00',
INTERVAL 20 DAY
)
) &gt; 0) as new
FROM tmohz_product p
LEFT JOIN tmohz_product_lang pl
ON pl.id_product = p.id_product
AND pl.id_shop = 1
AND pl.id_lang = 2
LEFT JOIN tmohz_stock_available sa   ON sa.id_product = p.id_product
AND sa.id_product_attribute = 0
AND sa.id_shop = 1 LEFT JOIN tmohz_product_shop ps
ON ps.id_product = p.id_product
AND ps.id_shop = 1
WHERE p.id_product IN (13027)
0.978 ms 1 /classes/ProductAssembler.php:70
202
SELECT SQL_NO_CACHE *
FROM `tmohz_category` c
INNER JOIN tmohz_category_shop category_shop
ON (category_shop.id_category = c.id_category AND category_shop.id_shop = 1)
LEFT JOIN `tmohz_category_lang` cl ON c.`id_category` = cl.`id_category` AND cl.id_shop = 1 
WHERE 1  and c.id_category IN (136,137,138)  AND `id_lang` = 2
AND `active` = 1
ORDER BY c.`level_depth` ASC, category_shop.`position` ASC
0.969 ms 3 Yes /classes/Category.php:657
162
SELECT SQL_NO_CACHE eb.*,yy.id_lang
FROM `tmohz_st_site_builder` eb
INNER JOIN `tmohz_st_site_builder_yuyan` `yy` ON yy.id_st_site_builder = eb.id_st_site_builder
INNER JOIN tmohz_st_site_builder_shop st_site_builder_shop
ON (st_site_builder_shop.id_st_site_builder = eb.id_st_site_builder AND st_site_builder_shop.id_shop = 1)
WHERE (eb.`contr` in ('product','product_desc') AND ( yy.`id_lang` = 0 or yy.`id_lang` = 2) AND eb.`post_parent` = 0 AND eb.`post_type`='' AND  eb.`id_product` = 46320 and eb.`type`=0)
0.959 ms 53 /modules/stsitebuilder/stsitebuilder.php:1144
18
SELECT SQL_NO_CACHE `id_hook`, `name` FROM `tmohz_hook`
0.941 ms 1237 /classes/Hook.php:1577
1
SELECT SQL_NO_CACHE gs.*, s.*, gs.name AS group_name, s.name AS shop_name, s.active, su.domain, su.domain_ssl, su.physical_uri, su.virtual_uri
FROM tmohz_shop_group gs
LEFT JOIN tmohz_shop s
ON s.id_shop_group = gs.id_shop_group
LEFT JOIN tmohz_shop_url su
ON s.id_shop = su.id_shop AND su.main = 1
WHERE s.deleted = 0
AND gs.deleted = 0
ORDER BY gs.name, s.name
0.911 ms 1 Yes /classes/shop/Shop.php:716
21
SELECT SQL_NO_CACHE m.`id_module`, m.`name`, ms.`id_module`as `mshop`
FROM `tmohz_module` m
LEFT JOIN `tmohz_module_shop` ms
ON m.`id_module` = ms.`id_module`
AND ms.`id_shop` = 1
0.908 ms 85 /classes/module/Module.php:343
119
SELECT SQL_NO_CACHE *
FROM `tmohz_product` a
LEFT JOIN `tmohz_product_lang` `b` ON a.`id_product` = b.`id_product` AND b.`id_lang` = 1
LEFT JOIN `tmohz_product_shop` `c` ON a.`id_product` = c.`id_product` AND c.`id_shop` = 1
WHERE (a.`id_product` = 46320) AND (b.`id_shop` = 1) LIMIT 1
0.907 ms 1 /src/Adapter/EntityMapper.php:74
337
SELECT SQL_NO_CACHE COALESCE(SUM(first_level_quantity) + SUM(pack_quantity), 0) as deep_quantity,
COALESCE(SUM(first_level_quantity), 0) as quantity
FROM (SELECT SUM(cp.`quantity`) as first_level_quantity, 0 as pack_quantity
FROM `tmohz_cart_product` cp
WHERE cp.`id_product_attribute` = 0
AND cp.`id_cart` = 0 AND cp.`id_product` = 11716 UNION SELECT 0 as first_level_quantity, SUM(cp.`quantity` * p.`quantity`) as pack_quantity
FROM `tmohz_cart_product` cp JOIN `tmohz_pack` p ON cp.`id_product` = p.`id_product_pack` JOIN `tmohz_product` pr ON p.`id_product_pack` = pr.`id_product`
WHERE cp.`id_product_attribute` = 0
AND cp.`id_cart` = 0 AND p.`id_product_item` = 11716 AND (pr.`pack_stock_type` IN (1,2) OR (
pr.`pack_stock_type` = 3
AND 0 = 1
))) as q LIMIT 1
0.880 ms 0 /classes/Cart.php:1450
73
SELECT SQL_NO_CACHE tr.*
FROM `tmohz_tax_rule` tr
JOIN `tmohz_tax_rules_group` trg ON (tr.`id_tax_rules_group` = trg.`id_tax_rules_group`)
WHERE trg.`active` = 1
AND tr.`id_country` = 6
AND tr.`id_tax_rules_group` = 1
AND tr.`id_state` IN (0, 398)
AND ('46136' BETWEEN tr.`zipcode_from` AND tr.`zipcode_to`
OR (tr.`zipcode_to` = 0 AND tr.`zipcode_from` IN(0, '46136')))
ORDER BY tr.`zipcode_from` DESC, tr.`zipcode_to` DESC, tr.`id_state` DESC, tr.`id_country` DESC
0.877 ms 2 /classes/tax/TaxRulesTaxManager.php:97
0
SELECT SQL_NO_CACHE s.id_shop, CONCAT(su.physical_uri, su.virtual_uri) AS uri, su.domain, su.main
FROM tmohz_shop_url su
LEFT JOIN tmohz_shop s ON (s.id_shop = su.id_shop)
WHERE (su.domain = 'new.ckcautosport.com' OR su.domain_ssl = 'new.ckcautosport.com')
AND s.active = 1
AND s.deleted = 0
ORDER BY LENGTH(CONCAT(su.physical_uri, su.virtual_uri)) DESC
0.867 ms 1 Yes /classes/shop/Shop.php:1392
52
SELECT SQL_NO_CACHE *
FROM `tmohz_product_lang`
WHERE `id_product` = 46320 AND `id_shop` = 1
0.854 ms 6 /src/Adapter/EntityMapper.php:82
325
SELECT SQL_NO_CACHE COALESCE(SUM(first_level_quantity) + SUM(pack_quantity), 0) as deep_quantity,
COALESCE(SUM(first_level_quantity), 0) as quantity
FROM (SELECT SUM(cp.`quantity`) as first_level_quantity, 0 as pack_quantity
FROM `tmohz_cart_product` cp
WHERE cp.`id_product_attribute` = 0
AND cp.`id_cart` = 0 AND cp.`id_product` = 11413 UNION SELECT 0 as first_level_quantity, SUM(cp.`quantity` * p.`quantity`) as pack_quantity
FROM `tmohz_cart_product` cp JOIN `tmohz_pack` p ON cp.`id_product` = p.`id_product_pack` JOIN `tmohz_product` pr ON p.`id_product_pack` = pr.`id_product`
WHERE cp.`id_product_attribute` = 0
AND cp.`id_cart` = 0 AND p.`id_product_item` = 11413 AND (pr.`pack_stock_type` IN (1,2) OR (
pr.`pack_stock_type` = 3
AND 0 = 1
))) as q LIMIT 1
0.853 ms 0 /classes/Cart.php:1450
342
SELECT SQL_NO_CACHE *
FROM `tmohz_product` a
LEFT JOIN `tmohz_product_shop` `c` ON a.`id_product` = c.`id_product` AND c.`id_shop` = 1
WHERE (a.`id_product` = 13027) LIMIT 1
0.830 ms 1 /src/Adapter/EntityMapper.php:74
386
SELECT SQL_NO_CACHE eb.*
FROM `tmohz_st_site_builder` eb
INNER JOIN `tmohz_st_site_builder_yuyan` `yy` ON yy.id_st_site_builder = eb.id_st_site_builder
INNER JOIN tmohz_st_site_builder_shop st_site_builder_shop
ON (st_site_builder_shop.id_st_site_builder = eb.id_st_site_builder AND st_site_builder_shop.id_shop = 1)
WHERE (eb.`post_parent` = 0 AND eb.`post_type`='' AND eb.post_status = "publish" AND eb.`type` in (130) And (eb.`contr` = "all" OR eb.`contr` = "product") AND eb.`active`=1 AND (yy.`id_lang`=0 OR yy.`id_lang`=2))
ORDER BY eb.priority DESC
0.806 ms 1 Yes /modules/stsitebuilder/stsitebuilder.php:1838
51
SELECT SQL_NO_CACHE *
FROM `tmohz_product` a
LEFT JOIN `tmohz_product_shop` `c` ON a.`id_product` = c.`id_product` AND c.`id_shop` = 1
WHERE (a.`id_product` = 46320) LIMIT 1
0.805 ms 1 /src/Adapter/EntityMapper.php:74
318
SELECT SQL_NO_CACHE *
FROM `tmohz_product` a
LEFT JOIN `tmohz_product_shop` `c` ON a.`id_product` = c.`id_product` AND c.`id_shop` = 1
WHERE (a.`id_product` = 11413) LIMIT 1
0.795 ms 1 /src/Adapter/EntityMapper.php:74
110
SELECT SQL_NO_CACHE COALESCE(SUM(first_level_quantity) + SUM(pack_quantity), 0) as deep_quantity,
COALESCE(SUM(first_level_quantity), 0) as quantity
FROM (SELECT SUM(cp.`quantity`) as first_level_quantity, 0 as pack_quantity
FROM `tmohz_cart_product` cp
WHERE cp.`id_product_attribute` = 0
AND cp.`id_customization` = 0
AND cp.`id_cart` = 0 AND cp.`id_product` = 46320 UNION SELECT 0 as first_level_quantity, SUM(cp.`quantity` * p.`quantity`) as pack_quantity
FROM `tmohz_cart_product` cp JOIN `tmohz_pack` p ON cp.`id_product` = p.`id_product_pack` JOIN `tmohz_product` pr ON p.`id_product_pack` = pr.`id_product`
WHERE cp.`id_product_attribute` = 0
AND cp.`id_customization` = 0
AND cp.`id_cart` = 0 AND p.`id_product_item` = 46320 AND (pr.`pack_stock_type` IN (1,2) OR (
pr.`pack_stock_type` = 3
AND 0 = 1
))) as q LIMIT 1
0.785 ms 0 /classes/Cart.php:1450
62
SELECT SQL_NO_CACHE eb.*
FROM `tmohz_st_site_builder` eb
INNER JOIN `tmohz_st_site_builder_yuyan` `yy` ON yy.id_st_site_builder = eb.id_st_site_builder
INNER JOIN tmohz_st_site_builder_shop st_site_builder_shop
ON (st_site_builder_shop.id_st_site_builder = eb.id_st_site_builder AND st_site_builder_shop.id_shop = 1)
WHERE (eb.contr = "product") AND (eb.type =50) AND (yy.id_lang = 0 OR yy.id_lang =2) AND (eb.post_status = "publish") AND (eb.post_parent = 0) AND (eb.post_type = "") AND (eb.active = 1) AND (((eb.id_manufacturer = 0 AND eb.id_category = 0 AND eb.id_product = "") OR (eb.id_manufacturer &gt; 0 AND eb.id_manufacturer=81) OR (eb.id_category &gt; 0 AND eb.id_category IN(98,97,2)) OR ( find_in_set('46320',eb.id_product))))
ORDER BY eb.priority DESC
LIMIT 1
0.781 ms 11 Yes /modules/stsitebuilder/libs/elementor/modules/templates/module.php:111
322
SELECT SQL_NO_CACHE product_shop.`price`, product_shop.`ecotax`,
IFNULL(product_attribute_shop.id_product_attribute,0) id_product_attribute, product_attribute_shop.`price` AS attribute_price, product_attribute_shop.default_on, product_attribute_shop.`ecotax` AS attribute_ecotax
FROM `tmohz_product` p
INNER JOIN `tmohz_product_shop` `product_shop` ON (product_shop.id_product=p.id_product AND product_shop.id_shop = 1)
LEFT JOIN `tmohz_product_attribute_shop` `product_attribute_shop` ON (product_attribute_shop.id_product = p.id_product AND product_attribute_shop.id_shop = 1)
WHERE (p.`id_product` = 11413)
0.773 ms 1 /classes/Product.php:3629
348
SELECT SQL_NO_CACHE COALESCE(SUM(first_level_quantity) + SUM(pack_quantity), 0) as deep_quantity,
COALESCE(SUM(first_level_quantity), 0) as quantity
FROM (SELECT SUM(cp.`quantity`) as first_level_quantity, 0 as pack_quantity
FROM `tmohz_cart_product` cp
WHERE cp.`id_product_attribute` = 0
AND cp.`id_cart` = 0 AND cp.`id_product` = 13027 UNION SELECT 0 as first_level_quantity, SUM(cp.`quantity` * p.`quantity`) as pack_quantity
FROM `tmohz_cart_product` cp JOIN `tmohz_pack` p ON cp.`id_product` = p.`id_product_pack` JOIN `tmohz_product` pr ON p.`id_product_pack` = pr.`id_product`
WHERE cp.`id_product_attribute` = 0
AND cp.`id_cart` = 0 AND p.`id_product_item` = 13027 AND (pr.`pack_stock_type` IN (1,2) OR (
pr.`pack_stock_type` = 3
AND 0 = 1
))) as q LIMIT 1
0.773 ms 0 /classes/Cart.php:1450
334
SELECT SQL_NO_CACHE product_shop.`price`, product_shop.`ecotax`,
IFNULL(product_attribute_shop.id_product_attribute,0) id_product_attribute, product_attribute_shop.`price` AS attribute_price, product_attribute_shop.default_on, product_attribute_shop.`ecotax` AS attribute_ecotax
FROM `tmohz_product` p
INNER JOIN `tmohz_product_shop` `product_shop` ON (product_shop.id_product=p.id_product AND product_shop.id_shop = 1)
LEFT JOIN `tmohz_product_attribute_shop` `product_attribute_shop` ON (product_attribute_shop.id_product = p.id_product AND product_attribute_shop.id_shop = 1)
WHERE (p.`id_product` = 11716)
0.765 ms 1 /classes/Product.php:3629
326
SELECT SQL_NO_CACHE *
FROM `tmohz_product` a
LEFT JOIN `tmohz_product_lang` `b` ON a.`id_product` = b.`id_product` AND b.`id_lang` = 2
LEFT JOIN `tmohz_product_shop` `c` ON a.`id_product` = c.`id_product` AND c.`id_shop` = 1
WHERE (a.`id_product` = 11413) AND (b.`id_shop` = 1) LIMIT 1
0.760 ms 1 /src/Adapter/EntityMapper.php:74
108
SELECT SQL_NO_CACHE DISTINCT a.`id_attribute`, a.`id_attribute_group`, al.`name` as `attribute`, agl.`name` as `group`,pa.`reference`, pa.`ean13`, pa.`isbn`, pa.`upc`, pa.`mpn`
FROM `tmohz_attribute` a
LEFT JOIN `tmohz_attribute_lang` al
ON (a.`id_attribute` = al.`id_attribute` AND al.`id_lang` = 2)
LEFT JOIN `tmohz_attribute_group_lang` agl
ON (a.`id_attribute_group` = agl.`id_attribute_group` AND agl.`id_lang` = 2)
LEFT JOIN `tmohz_product_attribute_combination` pac
ON (a.`id_attribute` = pac.`id_attribute`)
LEFT JOIN `tmohz_product_attribute` pa
ON (pac.`id_product_attribute` = pa.`id_product_attribute`)
INNER JOIN tmohz_product_attribute_shop product_attribute_shop
ON (product_attribute_shop.id_product_attribute = pa.id_product_attribute AND product_attribute_shop.id_shop = 1)
INNER JOIN tmohz_attribute_shop attribute_shop
ON (attribute_shop.id_attribute = pac.id_attribute AND attribute_shop.id_shop = 1)
WHERE pa.`id_product` = 46320
0.734 ms 1 /classes/Product.php:7250
165
SELECT SQL_NO_CACHE c.*, cl.*  FROM `tmohz_category` c
LEFT JOIN `tmohz_category_lang` cl
ON (c.`id_category` = cl.`id_category`
AND `id_lang` = 2 AND cl.id_shop = 1 ) WHERE c.`nleft` &lt;= 192 AND c.`nright` &gt;= 235 AND c.`nleft` &gt;= 2 AND c.`nright` &lt;= 351 ORDER BY `nleft` DESC
0.726 ms 176 Yes /classes/Category.php:1617
308
SELECT SQL_NO_CACHE p.*,
ps.*,
pl.*,
sa.out_of_stock,
IFNULL(sa.quantity, 0) as quantity,
(DATEDIFF(
p.`date_add`,
DATE_SUB(
'2026-04-21 00:00:00',
INTERVAL 20 DAY
)
) &gt; 0) as new
FROM tmohz_product p
LEFT JOIN tmohz_product_lang pl
ON pl.id_product = p.id_product
AND pl.id_shop = 1
AND pl.id_lang = 2
LEFT JOIN tmohz_stock_available sa   ON sa.id_product = p.id_product
AND sa.id_product_attribute = 0
AND sa.id_shop = 1 LEFT JOIN tmohz_product_shop ps
ON ps.id_product = p.id_product
AND ps.id_shop = 1
WHERE p.id_product IN (9480)
0.725 ms 1 /classes/ProductAssembler.php:70
354
SELECT SQL_NO_CACHE p.*,
ps.*,
pl.*,
sa.out_of_stock,
IFNULL(sa.quantity, 0) as quantity,
(DATEDIFF(
p.`date_add`,
DATE_SUB(
'2026-04-21 00:00:00',
INTERVAL 20 DAY
)
) &gt; 0) as new
FROM tmohz_product p
LEFT JOIN tmohz_product_lang pl
ON pl.id_product = p.id_product
AND pl.id_shop = 1
AND pl.id_lang = 2
LEFT JOIN tmohz_stock_available sa   ON sa.id_product = p.id_product
AND sa.id_product_attribute = 0
AND sa.id_shop = 1 LEFT JOIN tmohz_product_shop ps
ON ps.id_product = p.id_product
AND ps.id_shop = 1
WHERE p.id_product IN (13028)
0.725 ms 1 /classes/ProductAssembler.php:70
88
SELECT SQL_NO_CACHE t.`id_lang`, t.`name`
FROM tmohz_tag t
LEFT JOIN tmohz_product_tag pt ON (pt.id_tag = t.id_tag)
WHERE pt.`id_product`=46320
0.723 ms 12 /classes/Tag.php:239
271
SELECT SQL_NO_CACHE p.*,
ps.*,
pl.*,
sa.out_of_stock,
IFNULL(sa.quantity, 0) as quantity,
(DATEDIFF(
p.`date_add`,
DATE_SUB(
'2026-04-21 00:00:00',
INTERVAL 20 DAY
)
) &gt; 0) as new
FROM tmohz_product p
LEFT JOIN tmohz_product_lang pl
ON pl.id_product = p.id_product
AND pl.id_shop = 1
AND pl.id_lang = 2
LEFT JOIN tmohz_stock_available sa   ON sa.id_product = p.id_product
AND sa.id_product_attribute = 0
AND sa.id_shop = 1 LEFT JOIN tmohz_product_shop ps
ON ps.id_product = p.id_product
AND ps.id_shop = 1
WHERE p.id_product IN (21)
0.721 ms 1 /classes/ProductAssembler.php:70
11
SELECT SQL_NO_CACHE COUNT(DISTINCT l.id_lang) FROM `tmohz_lang` l
JOIN tmohz_lang_shop lang_shop ON (lang_shop.id_lang = l.id_lang AND lang_shop.id_shop = 1)
WHERE l.`active` = 1 LIMIT 1
0.713 ms 6 /classes/Language.php:1204
262
SELECT SQL_NO_CACHE * FROM `tmohz_occ_supplier_orders`
WHERE `id_product` = 46320
AND `active` = 1
AND `expected_date` &gt;= CURDATE()
ORDER BY `expected_date` ASC
0.706 ms 1 Yes /modules/desoccfeatures/classes/OccSupplierOrder.php:60
246
SELECT SQL_NO_CACHE eb.*
FROM `tmohz_st_site_builder` eb
INNER JOIN `tmohz_st_site_builder_yuyan` `yy` ON yy.id_st_site_builder = eb.id_st_site_builder
INNER JOIN tmohz_st_site_builder_shop st_site_builder_shop
ON (st_site_builder_shop.id_st_site_builder = eb.id_st_site_builder AND st_site_builder_shop.id_shop = 1)
WHERE (eb.contr = "product") AND (eb.type =90) AND (yy.id_lang = 0 OR yy.id_lang =2) AND (eb.post_status = "publish") AND (eb.post_parent = 0) AND (eb.post_type = "") AND (eb.active = 1) AND (((eb.id_manufacturer = 0 AND eb.id_category = 0 AND eb.id_product = "") OR (eb.id_manufacturer &gt; 0 AND eb.id_manufacturer=81) OR (eb.id_category &gt; 0 AND eb.id_category IN(98,97,2)) OR ( find_in_set('46320',eb.id_product))))
ORDER BY eb.priority DESC
LIMIT 1
0.706 ms 1 Yes /modules/stsitebuilder/stsitebuilder.php:1209
113
SELECT SQL_NO_CACHE image_shop.`cover`, i.`id_image`, il.`legend`, i.`position`
FROM `tmohz_image` i
INNER JOIN tmohz_image_shop image_shop
ON (image_shop.id_image = i.id_image AND image_shop.id_shop = 1)
LEFT JOIN `tmohz_image_lang` il ON (i.`id_image` = il.`id_image` AND il.`id_lang` = 2)
WHERE i.`id_product` = 46320
ORDER BY `position`
0.702 ms 3 Yes /classes/Product.php:3285
166
SELECT SQL_NO_CACHE eb.*
FROM `tmohz_st_site_builder` eb
INNER JOIN `tmohz_st_site_builder_yuyan` `yy` ON yy.id_st_site_builder = eb.id_st_site_builder
INNER JOIN tmohz_st_site_builder_shop st_site_builder_shop
ON (st_site_builder_shop.id_st_site_builder = eb.id_st_site_builder AND st_site_builder_shop.id_shop = 1)
WHERE (eb.`post_parent` = 0 AND eb.`post_type`='' AND eb.post_status = "publish" AND eb.`type` in (10) And ((eb.id_manufacturer = 0 AND eb.id_category = 0 AND eb.id_product = "") OR (eb.id_manufacturer &gt; 0 AND eb.id_manufacturer=81) OR (eb.id_category &gt; 0 AND eb.id_category IN(98,97,2)) OR ( find_in_set('46320',eb.id_product))) AND (yy.`id_lang`=0 OR yy.`id_lang`=2))
ORDER BY  eb.`position` asc, eb.`id_st_site_builder` desc
0.702 ms 1 Yes /modules/stsitebuilder/stsitebuilder.php:1147
256
SELECT SQL_NO_CACHE c.`nleft`, c.`nright`  FROM `tmohz_category` c
LEFT JOIN `tmohz_category_lang` cl
ON (c.`id_category` = cl.`id_category`
AND `id_lang` = 2 AND cl.id_shop = 1 ) WHERE c.`id_category` = 98 LIMIT 1
0.699 ms 1 /classes/Category.php:1607
259
SELECT SQL_NO_CACHE quantity FROM `tmohz_stock_available`
WHERE id_product = 46320 
AND id_product_attribute = 0 LIMIT 1
0.689 ms 1 /modules/desoccstockerp/desoccstockerp.php:539
263
SELECT SQL_NO_CACHE name, value, pf.id_feature, f.position, fvl.id_feature_value
FROM tmohz_feature_product pf
LEFT JOIN tmohz_feature_lang fl ON (fl.id_feature = pf.id_feature AND fl.id_lang = 2)
LEFT JOIN tmohz_feature_value fv ON (fv.id_feature_value = pf.id_feature_value)
LEFT JOIN tmohz_feature_value_lang fvl ON (fvl.id_feature_value = pf.id_feature_value AND fvl.id_lang = 2)
LEFT JOIN tmohz_feature f ON (f.id_feature = pf.id_feature AND fl.id_lang = 2)
INNER JOIN tmohz_feature_shop feature_shop
ON (feature_shop.id_feature = f.id_feature AND feature_shop.id_shop = 1)
WHERE pf.id_product = 46320
ORDER BY f.position ASC, fvl.value ASC
0.681 ms 1 Yes /classes/Product.php:5778
312
SELECT SQL_NO_CACHE COALESCE(SUM(first_level_quantity) + SUM(pack_quantity), 0) as deep_quantity,
COALESCE(SUM(first_level_quantity), 0) as quantity
FROM (SELECT SUM(cp.`quantity`) as first_level_quantity, 0 as pack_quantity
FROM `tmohz_cart_product` cp
WHERE cp.`id_product_attribute` = 0
AND cp.`id_cart` = 0 AND cp.`id_product` = 9480 UNION SELECT 0 as first_level_quantity, SUM(cp.`quantity` * p.`quantity`) as pack_quantity
FROM `tmohz_cart_product` cp JOIN `tmohz_pack` p ON cp.`id_product` = p.`id_product_pack` JOIN `tmohz_product` pr ON p.`id_product_pack` = pr.`id_product`
WHERE cp.`id_product_attribute` = 0
AND cp.`id_cart` = 0 AND p.`id_product_item` = 9480 AND (pr.`pack_stock_type` IN (1,2) OR (
pr.`pack_stock_type` = 3
AND 0 = 1
))) as q LIMIT 1
0.676 ms 0 /classes/Cart.php:1450
358
SELECT SQL_NO_CACHE COALESCE(SUM(first_level_quantity) + SUM(pack_quantity), 0) as deep_quantity,
COALESCE(SUM(first_level_quantity), 0) as quantity
FROM (SELECT SUM(cp.`quantity`) as first_level_quantity, 0 as pack_quantity
FROM `tmohz_cart_product` cp
WHERE cp.`id_product_attribute` = 0
AND cp.`id_cart` = 0 AND cp.`id_product` = 13028 UNION SELECT 0 as first_level_quantity, SUM(cp.`quantity` * p.`quantity`) as pack_quantity
FROM `tmohz_cart_product` cp JOIN `tmohz_pack` p ON cp.`id_product` = p.`id_product_pack` JOIN `tmohz_product` pr ON p.`id_product_pack` = pr.`id_product`
WHERE cp.`id_product_attribute` = 0
AND cp.`id_cart` = 0 AND p.`id_product_item` = 13028 AND (pr.`pack_stock_type` IN (1,2) OR (
pr.`pack_stock_type` = 3
AND 0 = 1
))) as q LIMIT 1
0.665 ms 0 /classes/Cart.php:1450
66
SELECT SQL_NO_CACHE eb.*
FROM `tmohz_st_site_builder` eb
INNER JOIN `tmohz_st_site_builder_yuyan` `yy` ON yy.id_st_site_builder = eb.id_st_site_builder
INNER JOIN tmohz_st_site_builder_shop st_site_builder_shop
ON (st_site_builder_shop.id_st_site_builder = eb.id_st_site_builder AND st_site_builder_shop.id_shop = 1)
WHERE (eb.contr = "product") AND (eb.type =50) AND (yy.id_lang = 0 OR yy.id_lang =2) AND (eb.post_status = "publish") AND (eb.post_parent = 0) AND (eb.post_type = "") AND (eb.active = 1) AND (((eb.id_manufacturer = 0 AND eb.id_category = 0 AND eb.id_product = "") OR (eb.id_manufacturer &gt; 0 AND eb.id_manufacturer=81) OR (eb.id_category &gt; 0 AND eb.id_category IN(98,97,2)) OR ( find_in_set('46320',eb.id_product))))
ORDER BY eb.priority DESC
LIMIT 1
0.650 ms 11 Yes /modules/stsitebuilder/stsitebuilder.php:298
107
SELECT SQL_NO_CACHE *,
( IF (`id_shop` = 1, 2, 0) +  IF (`id_country` = 6, 4, 0) +  IF (`id_currency` = 1, 8, 0) +  IF (`id_group` = 1, 16, 0) +  IF (`id_customer` = 0, 32, 0)) AS `score`
FROM `tmohz_specific_price`
WHERE
`id_shop` IN (0, 1) AND
`id_currency` IN (0, 1) AND
`id_country` IN (0, 6) AND
`id_group` IN (0, 1) AND `id_product` = 0 AND `id_customer` = 0 AND `id_cart` = 0  AND (`from` = '0000-00-00 00:00:00' OR '2026-04-21 00:00:00' &gt;= `from`) AND (`to` = '0000-00-00 00:00:00' OR '2026-04-21 00:00:00' &lt;= `to`)
ORDER BY `from_quantity` ASC, `id_specific_price_rule` ASC, `score` DESC, `to` DESC, `from` DESC
0.649 ms 1 Yes /classes/SpecificPrice.php:622
296
SELECT SQL_NO_CACHE p.*,
ps.*,
pl.*,
sa.out_of_stock,
IFNULL(sa.quantity, 0) as quantity,
(DATEDIFF(
p.`date_add`,
DATE_SUB(
'2026-04-21 00:00:00',
INTERVAL 20 DAY
)
) &gt; 0) as new
FROM tmohz_product p
LEFT JOIN tmohz_product_lang pl
ON pl.id_product = p.id_product
AND pl.id_shop = 1
AND pl.id_lang = 2
LEFT JOIN tmohz_stock_available sa   ON sa.id_product = p.id_product
AND sa.id_product_attribute = 0
AND sa.id_shop = 1 LEFT JOIN tmohz_product_shop ps
ON ps.id_product = p.id_product
AND ps.id_shop = 1
WHERE p.id_product IN (1601)
0.643 ms 1 /classes/ProductAssembler.php:70
300
SELECT SQL_NO_CACHE COALESCE(SUM(first_level_quantity) + SUM(pack_quantity), 0) as deep_quantity,
COALESCE(SUM(first_level_quantity), 0) as quantity
FROM (SELECT SUM(cp.`quantity`) as first_level_quantity, 0 as pack_quantity
FROM `tmohz_cart_product` cp
WHERE cp.`id_product_attribute` = 0
AND cp.`id_cart` = 0 AND cp.`id_product` = 1601 UNION SELECT 0 as first_level_quantity, SUM(cp.`quantity` * p.`quantity`) as pack_quantity
FROM `tmohz_cart_product` cp JOIN `tmohz_pack` p ON cp.`id_product` = p.`id_product_pack` JOIN `tmohz_product` pr ON p.`id_product_pack` = pr.`id_product`
WHERE cp.`id_product_attribute` = 0
AND cp.`id_cart` = 0 AND p.`id_product_item` = 1601 AND (pr.`pack_stock_type` IN (1,2) OR (
pr.`pack_stock_type` = 3
AND 0 = 1
))) as q LIMIT 1
0.641 ms 0 /classes/Cart.php:1450
83
SELECT SQL_NO_CACHE *, ( IF (`id_shop` = 1, 2, 0) +  IF (`id_country` = 6, 4, 0) +  IF (`id_currency` = 1, 8, 0) +  IF (`id_group` = 1, 16, 0) +  IF (`id_customer` = 0, 32, 0)) AS `score`
FROM `tmohz_specific_price`
WHERE
`id_shop` IN (0, 1) AND
`id_currency` IN (0, 1) AND
`id_country` IN (0, 6) AND
`id_group` IN (0, 1) AND `id_product` = 0 AND `id_customer` = 0 AND `id_product_attribute` = 0 AND `id_cart` = 0  AND (`from` = '0000-00-00 00:00:00' OR '2026-04-21 00:00:00' &gt;= `from`) AND (`to` = '0000-00-00 00:00:00' OR '2026-04-21 00:00:00' &lt;= `to`)
AND IF(`from_quantity` &gt; 1, `from_quantity`, 0) &lt;= 1 ORDER BY `id_product_attribute` DESC, `id_cart` DESC, `from_quantity` DESC, `id_specific_price_rule` ASC, `score` DESC, `to` DESC, `from` DESC LIMIT 1
0.638 ms 1 Yes /classes/SpecificPrice.php:583
275
SELECT SQL_NO_CACHE COALESCE(SUM(first_level_quantity) + SUM(pack_quantity), 0) as deep_quantity,
COALESCE(SUM(first_level_quantity), 0) as quantity
FROM (SELECT SUM(cp.`quantity`) as first_level_quantity, 0 as pack_quantity
FROM `tmohz_cart_product` cp
WHERE cp.`id_product_attribute` = 0
AND cp.`id_cart` = 0 AND cp.`id_product` = 21 UNION SELECT 0 as first_level_quantity, SUM(cp.`quantity` * p.`quantity`) as pack_quantity
FROM `tmohz_cart_product` cp JOIN `tmohz_pack` p ON cp.`id_product` = p.`id_product_pack` JOIN `tmohz_product` pr ON p.`id_product_pack` = pr.`id_product`
WHERE cp.`id_product_attribute` = 0
AND cp.`id_cart` = 0 AND p.`id_product_item` = 21 AND (pr.`pack_stock_type` IN (1,2) OR (
pr.`pack_stock_type` = 3
AND 0 = 1
))) as q LIMIT 1
0.627 ms 0 /classes/Cart.php:1450
111
SELECT SQL_NO_CACHE COALESCE(SUM(first_level_quantity) + SUM(pack_quantity), 0) as deep_quantity,
COALESCE(SUM(first_level_quantity), 0) as quantity
FROM (SELECT SUM(cp.`quantity`) as first_level_quantity, 0 as pack_quantity
FROM `tmohz_cart_product` cp
WHERE cp.`id_product_attribute` = 0
AND cp.`id_cart` = 0 AND cp.`id_product` = 46320 UNION SELECT 0 as first_level_quantity, SUM(cp.`quantity` * p.`quantity`) as pack_quantity
FROM `tmohz_cart_product` cp JOIN `tmohz_pack` p ON cp.`id_product` = p.`id_product_pack` JOIN `tmohz_product` pr ON p.`id_product_pack` = pr.`id_product`
WHERE cp.`id_product_attribute` = 0
AND cp.`id_cart` = 0 AND p.`id_product_item` = 46320 AND (pr.`pack_stock_type` IN (1,2) OR (
pr.`pack_stock_type` = 3
AND 0 = 1
))) as q LIMIT 1
0.626 ms 0 /classes/Cart.php:1450
258
SELECT SQL_NO_CACHE c.*, cl.*  FROM `tmohz_category` c
LEFT JOIN `tmohz_category_lang` cl
ON (c.`id_category` = cl.`id_category`
AND `id_lang` = 2 AND cl.id_shop = 1 ) WHERE c.`nleft` &lt;= 192 AND c.`nright` &gt;= 235 AND c.`nleft` &gt;= 2 AND c.`nright` &lt;= 351 ORDER BY `nleft` DESC
0.623 ms 176 Yes /classes/Category.php:1617
319
SELECT SQL_NO_CACHE *
FROM `tmohz_product_lang`
WHERE `id_product` = 11413 AND `id_shop` = 1
0.616 ms 6 /src/Adapter/EntityMapper.php:82
27
SELECT SQL_NO_CACHE m.`id_module`, m.`name`, ms.`id_module`as `mshop`
FROM `tmohz_module` m
LEFT JOIN `tmohz_module_shop` ms
ON m.`id_module` = ms.`id_module`
AND ms.`id_shop` = 1
0.614 ms 85 /classes/module/Module.php:343
284
SELECT SQL_NO_CACHE p.*,
ps.*,
pl.*,
sa.out_of_stock,
IFNULL(sa.quantity, 0) as quantity,
(DATEDIFF(
p.`date_add`,
DATE_SUB(
'2026-04-21 00:00:00',
INTERVAL 20 DAY
)
) &gt; 0) as new
FROM tmohz_product p
LEFT JOIN tmohz_product_lang pl
ON pl.id_product = p.id_product
AND pl.id_shop = 1
AND pl.id_lang = 2
LEFT JOIN tmohz_stock_available sa   ON sa.id_product = p.id_product
AND sa.id_product_attribute = 0
AND sa.id_shop = 1 LEFT JOIN tmohz_product_shop ps
ON ps.id_product = p.id_product
AND ps.id_shop = 1
WHERE p.id_product IN (665)
0.612 ms 1 /classes/ProductAssembler.php:70
343
SELECT SQL_NO_CACHE *
FROM `tmohz_product_lang`
WHERE `id_product` = 13027 AND `id_shop` = 1
0.606 ms 6 /src/Adapter/EntityMapper.php:82
121
SELECT SQL_NO_CACHE *
FROM `tmohz_product` a
LEFT JOIN `tmohz_product_lang` `b` ON a.`id_product` = b.`id_product` AND b.`id_lang` = 3
LEFT JOIN `tmohz_product_shop` `c` ON a.`id_product` = c.`id_product` AND c.`id_shop` = 1
WHERE (a.`id_product` = 46320) AND (b.`id_shop` = 1) LIMIT 1
0.598 ms 1 /src/Adapter/EntityMapper.php:74
338
SELECT SQL_NO_CACHE *
FROM `tmohz_product` a
LEFT JOIN `tmohz_product_lang` `b` ON a.`id_product` = b.`id_product` AND b.`id_lang` = 2
LEFT JOIN `tmohz_product_shop` `c` ON a.`id_product` = c.`id_product` AND c.`id_shop` = 1
WHERE (a.`id_product` = 11716) AND (b.`id_shop` = 1) LIMIT 1
0.596 ms 1 /src/Adapter/EntityMapper.php:74
328
SELECT SQL_NO_CACHE image_shop.`cover`, i.`id_image`, il.`legend`, i.`position`
FROM `tmohz_image` i
INNER JOIN tmohz_image_shop image_shop
ON (image_shop.id_image = i.id_image AND image_shop.id_shop = 1)
LEFT JOIN `tmohz_image_lang` il ON (i.`id_image` = il.`id_image` AND il.`id_lang` = 2)
WHERE i.`id_product` = 11413
ORDER BY `position`
0.590 ms 10 Yes /classes/Product.php:3285
4
SELECT SQL_NO_CACHE su.physical_uri, su.virtual_uri, su.domain, su.domain_ssl
FROM tmohz_shop s
LEFT JOIN tmohz_shop_url su ON (s.id_shop = su.id_shop)
WHERE s.id_shop = 1
AND s.active = 1 AND s.deleted = 0 AND su.main = 1 LIMIT 1
0.587 ms 1 /classes/shop/Shop.php:215
117
SELECT SQL_NO_CACHE GROUP_CONCAT(a.`id_product_pack`)
FROM `tmohz_pack` a
WHERE a.`id_product_item` = 46320 LIMIT 1
0.580 ms 1 /classes/Pack.php:438
77
SELECT SQL_NO_CACHE product_attribute_shop.id_product_attribute
FROM tmohz_product_attribute pa
INNER JOIN tmohz_product_attribute_shop product_attribute_shop
ON (product_attribute_shop.id_product_attribute = pa.id_product_attribute AND product_attribute_shop.id_shop = 1)
WHERE pa.id_product = 46320 LIMIT 1
0.569 ms 1 /classes/Product.php:1077
155
SELECT SQL_NO_CACHE *
FROM `tmohz_country` a
LEFT JOIN `tmohz_country_lang` `b` ON a.`id_country` = b.`id_country` AND b.`id_lang` = 2
LEFT JOIN `tmohz_country_shop` `c` ON a.`id_country` = c.`id_country` AND c.`id_shop` = 1
WHERE (a.`id_country` = 6) LIMIT 1
0.561 ms 1 /src/Adapter/EntityMapper.php:74
10
SELECT SQL_NO_CACHE domain, domain_ssl
FROM tmohz_shop_url
WHERE main = 1
AND id_shop = 1 LIMIT 1
0.560 ms 1 /classes/shop/ShopUrl.php:178
288
SELECT SQL_NO_CACHE COALESCE(SUM(first_level_quantity) + SUM(pack_quantity), 0) as deep_quantity,
COALESCE(SUM(first_level_quantity), 0) as quantity
FROM (SELECT SUM(cp.`quantity`) as first_level_quantity, 0 as pack_quantity
FROM `tmohz_cart_product` cp
WHERE cp.`id_product_attribute` = 0
AND cp.`id_cart` = 0 AND cp.`id_product` = 665 UNION SELECT 0 as first_level_quantity, SUM(cp.`quantity` * p.`quantity`) as pack_quantity
FROM `tmohz_cart_product` cp JOIN `tmohz_pack` p ON cp.`id_product` = p.`id_product_pack` JOIN `tmohz_product` pr ON p.`id_product_pack` = pr.`id_product`
WHERE cp.`id_product_attribute` = 0
AND cp.`id_cart` = 0 AND p.`id_product_item` = 665 AND (pr.`pack_stock_type` IN (1,2) OR (
pr.`pack_stock_type` = 3
AND 0 = 1
))) as q LIMIT 1
0.553 ms 0 /classes/Cart.php:1450
101
SELECT SQL_NO_CACHE c.`id_category`, cl.`name`, cl.`link_rewrite`, category_shop.`id_shop`
FROM `tmohz_category` c
LEFT JOIN `tmohz_category_lang` cl ON (c.`id_category` = cl.`id_category` AND cl.id_shop = 1 )
INNER JOIN tmohz_category_shop category_shop
ON (category_shop.id_category = c.id_category AND category_shop.id_shop = 1)
WHERE `id_lang` = 2
AND c.`id_parent` = 2
AND `active` = 1
GROUP BY c.`id_category`
ORDER BY category_shop.`position` ASC
0.552 ms 3 Yes Yes /classes/Category.php:1178
163
SELECT SQL_NO_CACHE c.`nleft`, c.`nright`  FROM `tmohz_category` c
LEFT JOIN `tmohz_category_lang` cl
ON (c.`id_category` = cl.`id_category`
AND `id_lang` = 2 AND cl.id_shop = 1 ) WHERE c.`id_category` = 98 LIMIT 1
0.552 ms 1 /classes/Category.php:1607
268
SELECT SQL_NO_CACHE *
FROM `tmohz_product` a
LEFT JOIN `tmohz_product_shop` `c` ON a.`id_product` = c.`id_product` AND c.`id_shop` = 1
WHERE (a.`id_product` = 21) LIMIT 1
0.544 ms 1 /src/Adapter/EntityMapper.php:74
24
SELECT SQL_NO_CACHE value FROM `tmohz_configuration` WHERE `name` = "PS_MULTISHOP_FEATURE_ACTIVE" LIMIT 1
0.540 ms 1 /classes/shop/Shop.php:1211
22
SELECT SQL_NO_CACHE id_customer
FROM `tmohz_customer`
WHERE (email = "noreply@new.ckcautosport.com.test") LIMIT 1
0.539 ms 1 /modules/onepagecheckoutps/onepagecheckoutps.php:3423
13
SELECT SQL_NO_CACHE *
FROM `tmohz_lang` a
LEFT JOIN `tmohz_lang_shop` `c` ON a.`id_lang` = c.`id_lang` AND c.`id_shop` = 1
WHERE (a.`id_lang` = 2) LIMIT 1
0.536 ms 1 /src/Adapter/EntityMapper.php:74
23
SELECT SQL_NO_CACHE *
FROM `tmohz_customer_group`
WHERE (id_customer = 4)
0.533 ms 1 /modules/onepagecheckoutps/onepagecheckoutps.php:3470
140
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a0
LEFT JOIN `tmohz_category_lang` `a1` ON (a0.`id_category` = a1.`id_category`)
WHERE (a0.`nleft` &lt; 192) AND (a0.`nright` &gt; 235) AND (a1.`id_lang` = 2) AND (a1.`id_shop` = 1)
ORDER BY a0.`nleft` asc
0.529 ms 176 Yes /classes/PrestaShopCollection.php:381
67
SELECT SQL_NO_CACHE *
FROM `tmohz_product` a
LEFT JOIN `tmohz_product_lang` `b` ON a.`id_product` = b.`id_product` AND b.`id_lang` = 2
LEFT JOIN `tmohz_product_shop` `c` ON a.`id_product` = c.`id_product` AND c.`id_shop` = 1
WHERE (a.`id_product` = 46320) AND (b.`id_shop` = 1) LIMIT 1
0.524 ms 1 /src/Adapter/EntityMapper.php:74
103
SELECT SQL_NO_CACHE * FROM `tmohz_image_type` WHERE 1 AND `manufacturers` = 1  ORDER BY `width` DESC, `height` DESC, `name`ASC
0.524 ms 8 Yes /classes/ImageType.php:109
387
SELECT SQL_NO_CACHE eb.*,yy.id_lang
FROM `tmohz_st_site_builder` eb
INNER JOIN `tmohz_st_site_builder_yuyan` `yy` ON yy.id_st_site_builder = eb.id_st_site_builder
INNER JOIN tmohz_st_site_builder_shop st_site_builder_shop
ON (st_site_builder_shop.id_st_site_builder = eb.id_st_site_builder AND st_site_builder_shop.id_shop = 1)
WHERE (eb.`type`=1) AND (eb.`post_parent`=0) AND (eb.`post_type`='') AND (eb.`post_status` = "publish") AND (eb.`location` in (1)) AND (( yy.`id_lang` = 0 or yy.id_lang=2))
ORDER BY eb.`position` asc
0.524 ms 1 Yes /modules/stsitebuilder/stsitebuilder.php:1552
336
SELECT SQL_NO_CACHE SUM(quantity)
FROM `tmohz_stock_available`
WHERE (id_product = 11716) AND (id_product_attribute = 0) AND (id_shop = 1) AND (id_shop_group = 0) LIMIT 1
0.523 ms 1 /classes/stock/StockAvailable.php:286
349
SELECT SQL_NO_CACHE *
FROM `tmohz_product` a
LEFT JOIN `tmohz_product_lang` `b` ON a.`id_product` = b.`id_product` AND b.`id_lang` = 2
LEFT JOIN `tmohz_product_shop` `c` ON a.`id_product` = c.`id_product` AND c.`id_shop` = 1
WHERE (a.`id_product` = 13027) AND (b.`id_shop` = 1) LIMIT 1
0.520 ms 1 /src/Adapter/EntityMapper.php:74
5
SELECT SQL_NO_CACHE l.*, ls.`id_shop`
FROM `tmohz_lang` l
LEFT JOIN `tmohz_lang_shop` ls ON (l.id_lang = ls.id_lang)
0.519 ms 6 /classes/Language.php:1070
390
SELECT SQL_NO_CACHE c.*, cl.*  FROM `tmohz_category` c
LEFT JOIN `tmohz_category_lang` cl
ON (c.`id_category` = cl.`id_category`
AND `id_lang` = 2 AND cl.id_shop = 1 ) WHERE c.`nleft` &lt;= 192 AND c.`nright` &gt;= 235 AND c.`nleft` &gt;= 2 AND c.`nright` &lt;= 351 ORDER BY `nleft` DESC
0.518 ms 176 Yes /classes/Category.php:1617
245
SELECT SQL_NO_CACHE c.*, cl.*  FROM `tmohz_category` c
LEFT JOIN `tmohz_category_lang` cl
ON (c.`id_category` = cl.`id_category`
AND `id_lang` = 2 AND cl.id_shop = 1 ) WHERE c.`nleft` &lt;= 192 AND c.`nright` &gt;= 235 AND c.`nleft` &gt;= 2 AND c.`nright` &lt;= 351 ORDER BY `nleft` DESC
0.510 ms 176 Yes /classes/Category.php:1617
156
SELECT SQL_NO_CACHE `id_module` FROM `tmohz_module` WHERE `name` = "ybc_blog" LIMIT 1
0.508 ms 1 /classes/module/Module.php:2781
19
SELECT SQL_NO_CACHE m.`id_module`, m.`name`, ms.`id_module`as `mshop`
FROM `tmohz_module` m
LEFT JOIN `tmohz_module_shop` ms
ON m.`id_module` = ms.`id_module`
AND ms.`id_shop` = 1
0.505 ms 85 /classes/module/Module.php:343
20
SELECT SQL_NO_CACHE name, alias FROM `tmohz_hook_alias`
0.504 ms 86 /classes/Hook.php:371
339
SELECT SQL_NO_CACHE image_shop.`cover`, i.`id_image`, il.`legend`, i.`position`
FROM `tmohz_image` i
INNER JOIN tmohz_image_shop image_shop
ON (image_shop.id_image = i.id_image AND image_shop.id_shop = 1)
LEFT JOIN `tmohz_image_lang` il ON (i.`id_image` = il.`id_image` AND il.`id_lang` = 2)
WHERE i.`id_product` = 11716
ORDER BY `position`
0.503 ms 5 Yes /classes/Product.php:3285
125
SELECT SQL_NO_CACHE *
FROM `tmohz_product` a
LEFT JOIN `tmohz_product_lang` `b` ON a.`id_product` = b.`id_product` AND b.`id_lang` = 5
LEFT JOIN `tmohz_product_shop` `c` ON a.`id_product` = c.`id_product` AND c.`id_shop` = 1
WHERE (a.`id_product` = 46320) AND (b.`id_shop` = 1) LIMIT 1
0.497 ms 1 /src/Adapter/EntityMapper.php:74
61
SELECT SQL_NO_CACHE c.*, cl.*  FROM `tmohz_category` c
LEFT JOIN `tmohz_category_lang` cl
ON (c.`id_category` = cl.`id_category`
AND `id_lang` = 2 AND cl.id_shop = 1 ) WHERE c.`nleft` &lt;= 192 AND c.`nright` &gt;= 235 AND c.`nleft` &gt;= 2 AND c.`nright` &lt;= 351 ORDER BY `nleft` DESC
0.495 ms 176 Yes /classes/Category.php:1617
75
SELECT SQL_NO_CACHE *
FROM `tmohz_tax_lang`
WHERE `id_tax` = 1
0.491 ms 6 /src/Adapter/EntityMapper.php:82
8
SELECT SQL_NO_CACHE *
FROM `tmohz_lang` a
LEFT JOIN `tmohz_lang_shop` `c` ON a.`id_lang` = c.`id_lang` AND c.`id_shop` = 1
WHERE (a.`id_lang` = 1) LIMIT 1
0.491 ms 1 /src/Adapter/EntityMapper.php:74
302
SELECT SQL_NO_CACHE image_shop.`cover`, i.`id_image`, il.`legend`, i.`position`
FROM `tmohz_image` i
INNER JOIN tmohz_image_shop image_shop
ON (image_shop.id_image = i.id_image AND image_shop.id_shop = 1)
LEFT JOIN `tmohz_image_lang` il ON (i.`id_image` = il.`id_image` AND il.`id_lang` = 2)
WHERE i.`id_product` = 1601
ORDER BY `position`
0.490 ms 8 Yes /classes/Product.php:3285
359
SELECT SQL_NO_CACHE *
FROM `tmohz_product` a
LEFT JOIN `tmohz_product_lang` `b` ON a.`id_product` = b.`id_product` AND b.`id_lang` = 2
LEFT JOIN `tmohz_product_shop` `c` ON a.`id_product` = c.`id_product` AND c.`id_shop` = 1
WHERE (a.`id_product` = 13028) AND (b.`id_shop` = 1) LIMIT 1
0.481 ms 1 /src/Adapter/EntityMapper.php:74
313
SELECT SQL_NO_CACHE *
FROM `tmohz_product` a
LEFT JOIN `tmohz_product_lang` `b` ON a.`id_product` = b.`id_product` AND b.`id_lang` = 2
LEFT JOIN `tmohz_product_shop` `c` ON a.`id_product` = c.`id_product` AND c.`id_shop` = 1
WHERE (a.`id_product` = 9480) AND (b.`id_shop` = 1) LIMIT 1
0.479 ms 1 /src/Adapter/EntityMapper.php:74
112
SELECT SQL_NO_CACHE tr.*
FROM `tmohz_tax_rule` tr
JOIN `tmohz_tax_rules_group` trg ON (tr.`id_tax_rules_group` = trg.`id_tax_rules_group`)
WHERE trg.`active` = 1
AND tr.`id_country` = 6
AND tr.`id_tax_rules_group` = 1
AND tr.`id_state` IN (0, 0)
AND ('0' BETWEEN tr.`zipcode_from` AND tr.`zipcode_to`
OR (tr.`zipcode_to` = 0 AND tr.`zipcode_from` IN(0, '0')))
ORDER BY tr.`zipcode_from` DESC, tr.`zipcode_to` DESC, tr.`id_state` DESC, tr.`id_country` DESC
0.478 ms 1 /classes/tax/TaxRulesTaxManager.php:97
120
SELECT SQL_NO_CACHE cl.`link_rewrite`
FROM `tmohz_category_lang` cl
WHERE `id_lang` = 1
AND cl.id_shop = 1 
AND cl.`id_category` = 98 LIMIT 1
0.476 ms 1 /classes/Category.php:1396
160
SELECT SQL_NO_CACHE `name`
FROM `tmohz_hook`
WHERE `id_hook` = 1204 LIMIT 1
0.475 ms 1 /classes/Hook.php:267
78
SELECT SQL_NO_CACHE 1 FROM `tmohz_specific_price` WHERE id_product = 0 LIMIT 1
0.472 ms 1 /classes/SpecificPrice.php:433
301
SELECT SQL_NO_CACHE *
FROM `tmohz_product` a
LEFT JOIN `tmohz_product_lang` `b` ON a.`id_product` = b.`id_product` AND b.`id_lang` = 2
LEFT JOIN `tmohz_product_shop` `c` ON a.`id_product` = c.`id_product` AND c.`id_shop` = 1
WHERE (a.`id_product` = 1601) AND (b.`id_shop` = 1) LIMIT 1
0.472 ms 1 /src/Adapter/EntityMapper.php:74
74
SELECT SQL_NO_CACHE *
FROM `tmohz_tax` a
WHERE (a.`id_tax` = 1) LIMIT 1
0.466 ms 1 /src/Adapter/EntityMapper.php:74
161
SELECT SQL_NO_CACHE `id_module` FROM `tmohz_module` WHERE `name` = "searchcustom" LIMIT 1
0.462 ms 1 /classes/module/Module.php:2781
7
SELECT SQL_NO_CACHE *
FROM `tmohz_shop_group` a
WHERE (a.`id_shop_group` = 1) LIMIT 1
0.462 ms 1 /src/Adapter/EntityMapper.php:74
320
SELECT SQL_NO_CACHE cl.`link_rewrite`
FROM `tmohz_category_lang` cl
WHERE `id_lang` = 0
AND cl.id_shop = 1 
AND cl.`id_category` = 140 LIMIT 1
0.460 ms 0 /classes/Category.php:1396
264
SELECT SQL_NO_CACHE * FROM `tmohz_searchcustom_fitment` 
WHERE `id_product` = 46320 ORDER BY `is_primary` DESC, `date_add` ASC
0.459 ms 1 Yes /modules/searchcustom/classes/SearchCustomFitment.php:101
315
SELECT SQL_NO_CACHE image_shop.`cover`, i.`id_image`, il.`legend`, i.`position`
FROM `tmohz_image` i
INNER JOIN tmohz_image_shop image_shop
ON (image_shop.id_image = i.id_image AND image_shop.id_shop = 1)
LEFT JOIN `tmohz_image_lang` il ON (i.`id_image` = il.`id_image` AND il.`id_lang` = 2)
WHERE i.`id_product` = 9480
ORDER BY `position`
0.459 ms 7 Yes /classes/Product.php:3285
123
SELECT SQL_NO_CACHE *
FROM `tmohz_product` a
LEFT JOIN `tmohz_product_lang` `b` ON a.`id_product` = b.`id_product` AND b.`id_lang` = 4
LEFT JOIN `tmohz_product_shop` `c` ON a.`id_product` = c.`id_product` AND c.`id_shop` = 1
WHERE (a.`id_product` = 46320) AND (b.`id_shop` = 1) LIMIT 1
0.458 ms 1 /src/Adapter/EntityMapper.php:74
242
SELECT SQL_NO_CACHE eb.*
FROM `tmohz_st_site_builder` eb
INNER JOIN `tmohz_st_site_builder_yuyan` `yy` ON yy.id_st_site_builder = eb.id_st_site_builder
INNER JOIN tmohz_st_site_builder_shop st_site_builder_shop
ON (st_site_builder_shop.id_st_site_builder = eb.id_st_site_builder AND st_site_builder_shop.id_shop = 1)
WHERE (eb.`post_parent` = 0 AND eb.`post_type`='' AND eb.post_status = "publish" AND eb.`type` in (40) And eb.`id_st_site_builder`=7 AND eb.`active` = 1 AND (yy.`id_lang`=0 OR yy.`id_lang`=2))
ORDER BY  eb.`position` asc, eb.`id_st_site_builder` desc
0.456 ms 2 /modules/stsitebuilder/stsitebuilder.php:952
260
SELECT SQL_NO_CACHE * FROM `tmohz_stock_fabrica` WHERE reference = "S008016RMRGR" LIMIT 1
0.456 ms 1 /modules/desoccstockerp/desoccstockerp.php:467
203
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 153) AND (b.`id_shop` = 1) LIMIT 1
0.456 ms 1 /src/Adapter/EntityMapper.php:74
65
SELECT SQL_NO_CACHE c.*, cl.*  FROM `tmohz_category` c
LEFT JOIN `tmohz_category_lang` cl
ON (c.`id_category` = cl.`id_category`
AND `id_lang` = 2 AND cl.id_shop = 1 ) WHERE c.`nleft` &lt;= 192 AND c.`nright` &gt;= 235 AND c.`nleft` &gt;= 2 AND c.`nright` &lt;= 351 ORDER BY `nleft` DESC
0.454 ms 176 Yes /classes/Category.php:1617
12
SELECT SQL_NO_CACHE `id_lang` FROM `tmohz_lang` WHERE `iso_code` = 'en' LIMIT 1
0.449 ms 6 /classes/Language.php:844
235
SELECT SQL_NO_CACHE *
FROM `tmohz_currency` c
INNER JOIN tmohz_currency_shop currency_shop
ON (currency_shop.id_currency = c.id_currency AND currency_shop.id_shop = 1)
WHERE c.`deleted` = 0 AND c.`active` = 1 ORDER BY `iso_code` ASC
0.446 ms 9 Yes /classes/Currency.php:687
153
SELECT SQL_NO_CACHE `id_module` FROM `tmohz_module_shop` WHERE `id_module` = 89 AND `id_shop` = 1 LIMIT 1
0.444 ms 1 /classes/module/Module.php:2270
28
SELECT SQL_NO_CACHE m.`id_module`, m.`name`, ms.`id_module`as `mshop`
FROM `tmohz_module` m
LEFT JOIN `tmohz_module_shop` ms
ON m.`id_module` = ms.`id_module`
AND ms.`id_shop` = 1
0.438 ms 85 /classes/module/Module.php:343
97
SELECT SQL_NO_CACHE m.`id_module`, m.`name`, ms.`id_module`as `mshop`
FROM `tmohz_module` m
LEFT JOIN `tmohz_module_shop` ms
ON m.`id_module` = ms.`id_module`
AND ms.`id_shop` = 1
0.437 ms 85 /classes/module/Module.php:343
289
SELECT SQL_NO_CACHE *
FROM `tmohz_product` a
LEFT JOIN `tmohz_product_lang` `b` ON a.`id_product` = b.`id_product` AND b.`id_lang` = 2
LEFT JOIN `tmohz_product_shop` `c` ON a.`id_product` = c.`id_product` AND c.`id_shop` = 1
WHERE (a.`id_product` = 665) AND (b.`id_shop` = 1) LIMIT 1
0.436 ms 1 /src/Adapter/EntityMapper.php:74
335
SELECT SQL_NO_CACHE `reduction`
FROM `tmohz_product_group_reduction_cache`
WHERE `id_product` = 11716 AND `id_group` = 1 LIMIT 1
0.435 ms 0 /classes/GroupReduction.php:146
323
SELECT SQL_NO_CACHE `reduction`
FROM `tmohz_product_group_reduction_cache`
WHERE `id_product` = 11413 AND `id_group` = 1 LIMIT 1
0.434 ms 0 /classes/GroupReduction.php:146
276
SELECT SQL_NO_CACHE *
FROM `tmohz_product` a
LEFT JOIN `tmohz_product_lang` `b` ON a.`id_product` = b.`id_product` AND b.`id_lang` = 2
LEFT JOIN `tmohz_product_shop` `c` ON a.`id_product` = c.`id_product` AND c.`id_shop` = 1
WHERE (a.`id_product` = 21) AND (b.`id_shop` = 1) LIMIT 1
0.432 ms 1 /src/Adapter/EntityMapper.php:74
25
SELECT SQL_NO_CACHE `id_module` FROM `tmohz_module` WHERE `name` = "winamic_linkobfuscator" LIMIT 1
0.428 ms 0 /classes/module/Module.php:2781
272
SELECT SQL_NO_CACHE product_shop.`price`, product_shop.`ecotax`,
IFNULL(product_attribute_shop.id_product_attribute,0) id_product_attribute, product_attribute_shop.`price` AS attribute_price, product_attribute_shop.default_on, product_attribute_shop.`ecotax` AS attribute_ecotax
FROM `tmohz_product` p
INNER JOIN `tmohz_product_shop` `product_shop` ON (product_shop.id_product=p.id_product AND product_shop.id_shop = 1)
LEFT JOIN `tmohz_product_attribute_shop` `product_attribute_shop` ON (product_attribute_shop.id_product = p.id_product AND product_attribute_shop.id_shop = 1)
WHERE (p.`id_product` = 21)
0.419 ms 1 /classes/Product.php:3629
171
SELECT SQL_NO_CACHE eb.*
FROM `tmohz_st_site_builder` eb
INNER JOIN `tmohz_st_site_builder_yuyan` `yy` ON yy.id_st_site_builder = eb.id_st_site_builder
INNER JOIN tmohz_st_site_builder_shop st_site_builder_shop
ON (st_site_builder_shop.id_st_site_builder = eb.id_st_site_builder AND st_site_builder_shop.id_shop = 1)
WHERE (eb.`post_parent` = 0 AND eb.`post_type`='' AND eb.post_status = "publish" AND eb.`type` in (30) And eb.`id_st_site_builder`=2 AND eb.`active` = 1 AND (yy.`id_lang`=0 OR yy.`id_lang`=2))
ORDER BY  eb.`position` asc, eb.`id_st_site_builder` desc
0.417 ms 2 /modules/stsitebuilder/stsitebuilder.php:952
247
SELECT SQL_NO_CACHE eb.*
FROM `tmohz_st_site_builder` eb
INNER JOIN `tmohz_st_site_builder_yuyan` `yy` ON yy.id_st_site_builder = eb.id_st_site_builder
INNER JOIN tmohz_st_site_builder_shop st_site_builder_shop
ON (st_site_builder_shop.id_st_site_builder = eb.id_st_site_builder AND st_site_builder_shop.id_shop = 1)
WHERE (eb.`post_parent` = 0 AND eb.`post_type`='' AND eb.post_status = "publish" AND eb.`type` in (90) And eb.`contr` = "all" AND (yy.`id_lang`=0 OR yy.`id_lang`=2))
ORDER BY eb.priority DESC
LIMIT 1
0.415 ms 1 Yes /modules/stsitebuilder/stsitebuilder.php:1211
331
SELECT SQL_NO_CACHE *
FROM `tmohz_product` a
LEFT JOIN `tmohz_product_shop` `c` ON a.`id_product` = c.`id_product` AND c.`id_shop` = 1
WHERE (a.`id_product` = 11716) LIMIT 1
0.413 ms 1 /src/Adapter/EntityMapper.php:74
159
UPDATE `tmohz_ybc_blog_post` SET enabled=1,datetime_added="2026-04-21 13:25:46",datetime_modified="2026-04-21 13:25:46" WHERE datetime_active!="0000-00-00" AND datetime_active is not NULL AND enabled=2 AND datetime_active&lt;=NOW()
0.409 ms 1 /modules/ybc_blog/classes/ybc_blog_post_class.php:621
104
SELECT SQL_NO_CACHE * FROM `tmohz_image_type`
0.407 ms 8 /classes/ImageType.php:161
189
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 34) AND (b.`id_shop` = 1) LIMIT 1
0.406 ms 1 /src/Adapter/EntityMapper.php:74
9
SELECT SQL_NO_CACHE id_shop
FROM `tmohz_lang_shop`
WHERE `id_lang` = 1
AND id_shop = 1 LIMIT 1
0.401 ms 1 /classes/ObjectModel.php:1570
291
SELECT SQL_NO_CACHE image_shop.`cover`, i.`id_image`, il.`legend`, i.`position`
FROM `tmohz_image` i
INNER JOIN tmohz_image_shop image_shop
ON (image_shop.id_image = i.id_image AND image_shop.id_shop = 1)
LEFT JOIN `tmohz_image_lang` il ON (i.`id_image` = il.`id_image` AND il.`id_lang` = 2)
WHERE i.`id_product` = 665
ORDER BY `position`
0.392 ms 6 Yes /classes/Product.php:3285
278
SELECT SQL_NO_CACHE image_shop.`cover`, i.`id_image`, il.`legend`, i.`position`
FROM `tmohz_image` i
INNER JOIN tmohz_image_shop image_shop
ON (image_shop.id_image = i.id_image AND image_shop.id_shop = 1)
LEFT JOIN `tmohz_image_lang` il ON (i.`id_image` = il.`id_image` AND il.`id_lang` = 2)
WHERE i.`id_product` = 21
ORDER BY `position`
0.389 ms 4 Yes /classes/Product.php:3285
105
SELECT SQL_NO_CACHE tr.*
FROM `tmohz_tax_rule` tr
JOIN `tmohz_tax_rules_group` trg ON (tr.`id_tax_rules_group` = trg.`id_tax_rules_group`)
WHERE trg.`active` = 1
AND tr.`id_country` = 6
AND tr.`id_tax_rules_group` = 0
AND tr.`id_state` IN (0, 398)
AND ('46136' BETWEEN tr.`zipcode_from` AND tr.`zipcode_to`
OR (tr.`zipcode_to` = 0 AND tr.`zipcode_from` IN(0, '46136')))
ORDER BY tr.`zipcode_from` DESC, tr.`zipcode_to` DESC, tr.`id_state` DESC, tr.`id_country` DESC
0.386 ms 0 /classes/tax/TaxRulesTaxManager.php:97
350
SELECT SQL_NO_CACHE image_shop.`cover`, i.`id_image`, il.`legend`, i.`position`
FROM `tmohz_image` i
INNER JOIN tmohz_image_shop image_shop
ON (image_shop.id_image = i.id_image AND image_shop.id_shop = 1)
LEFT JOIN `tmohz_image_lang` il ON (i.`id_image` = il.`id_image` AND il.`id_lang` = 2)
WHERE i.`id_product` = 13027
ORDER BY `position`
0.385 ms 1 Yes /classes/Product.php:3285
127
SELECT SQL_NO_CACHE *
FROM `tmohz_product` a
LEFT JOIN `tmohz_product_lang` `b` ON a.`id_product` = b.`id_product` AND b.`id_lang` = 6
LEFT JOIN `tmohz_product_shop` `c` ON a.`id_product` = c.`id_product` AND c.`id_shop` = 1
WHERE (a.`id_product` = 46320) AND (b.`id_shop` = 1) LIMIT 1
0.384 ms 1 /src/Adapter/EntityMapper.php:74
352
SELECT SQL_NO_CACHE *
FROM `tmohz_product` a
LEFT JOIN `tmohz_product_shop` `c` ON a.`id_product` = c.`id_product` AND c.`id_shop` = 1
WHERE (a.`id_product` = 13028) LIMIT 1
0.376 ms 1 /src/Adapter/EntityMapper.php:74
154
SELECT SQL_NO_CACHE `id_module` FROM `tmohz_module` WHERE `name` = "shiptopay" LIMIT 1
0.372 ms 0 /classes/module/Module.php:2781
84
SELECT SQL_NO_CACHE product_shop.`price`, product_shop.`ecotax`,
IFNULL(product_attribute_shop.id_product_attribute,0) id_product_attribute, product_attribute_shop.`price` AS attribute_price, product_attribute_shop.default_on, product_attribute_shop.`ecotax` AS attribute_ecotax
FROM `tmohz_product` p
INNER JOIN `tmohz_product_shop` `product_shop` ON (product_shop.id_product=p.id_product AND product_shop.id_shop = 1)
LEFT JOIN `tmohz_product_attribute_shop` `product_attribute_shop` ON (product_attribute_shop.id_product = p.id_product AND product_attribute_shop.id_shop = 1)
WHERE (p.`id_product` = 46320)
0.367 ms 1 /classes/Product.php:3629
305
SELECT SQL_NO_CACHE *
FROM `tmohz_product` a
LEFT JOIN `tmohz_product_shop` `c` ON a.`id_product` = c.`id_product` AND c.`id_shop` = 1
WHERE (a.`id_product` = 9480) LIMIT 1
0.363 ms 1 /src/Adapter/EntityMapper.php:74
345
SELECT SQL_NO_CACHE product_shop.`price`, product_shop.`ecotax`,
IFNULL(product_attribute_shop.id_product_attribute,0) id_product_attribute, product_attribute_shop.`price` AS attribute_price, product_attribute_shop.default_on, product_attribute_shop.`ecotax` AS attribute_ecotax
FROM `tmohz_product` p
INNER JOIN `tmohz_product_shop` `product_shop` ON (product_shop.id_product=p.id_product AND product_shop.id_shop = 1)
LEFT JOIN `tmohz_product_attribute_shop` `product_attribute_shop` ON (product_attribute_shop.id_product = p.id_product AND product_attribute_shop.id_shop = 1)
WHERE (p.`id_product` = 13027)
0.363 ms 1 /classes/Product.php:3629
76
SELECT SQL_NO_CACHE COUNT(p.id_product)
FROM `tmohz_product` p
INNER JOIN tmohz_product_shop product_shop
ON (product_shop.id_product = p.id_product AND product_shop.id_shop = 1)
WHERE p.id_product = 46320
AND DATEDIFF("2026-04-21 00:00:00", product_shop.`date_add`) &lt; 20 LIMIT 1
0.356 ms 1 /classes/Product.php:1709
143
SELECT SQL_NO_CACHE eb.`id_st_site_builder`
FROM `tmohz_st_site_builder` eb
INNER JOIN tmohz_st_site_builder_shop st_site_builder_shop
ON (st_site_builder_shop.id_st_site_builder = eb.id_st_site_builder AND st_site_builder_shop.id_shop = 1)
WHERE (eb.`type`=50) AND (eb.`contr`="quick_view") AND (eb.`active`=1)
0.354 ms 11 /modules/stsitebuilder/libs/elementor/includes/frontend.php:1561
57
SELECT SQL_NO_CACHE DISTINCT c.*
FROM `tmohz_category` c
LEFT JOIN `tmohz_category_lang` cl ON (c.`id_category` = cl.`id_category` AND cl.`id_lang` = 2)
WHERE `level_depth` = 1
0.350 ms 3 /classes/Category.php:2247
192
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 121) AND (b.`id_shop` = 1) LIMIT 1
0.350 ms 1 /src/Adapter/EntityMapper.php:74
221
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 162) AND (b.`id_shop` = 1) LIMIT 1
0.346 ms 1 /src/Adapter/EntityMapper.php:74
360
SELECT SQL_NO_CACHE image_shop.`cover`, i.`id_image`, il.`legend`, i.`position`
FROM `tmohz_image` i
INNER JOIN tmohz_image_shop image_shop
ON (image_shop.id_image = i.id_image AND image_shop.id_shop = 1)
LEFT JOIN `tmohz_image_lang` il ON (i.`id_image` = il.`id_image` AND il.`id_lang` = 2)
WHERE i.`id_product` = 13028
ORDER BY `position`
0.342 ms 1 Yes /classes/Product.php:3285
294
SELECT SQL_NO_CACHE *
FROM `tmohz_product` a
LEFT JOIN `tmohz_product_shop` `c` ON a.`id_product` = c.`id_product` AND c.`id_shop` = 1
WHERE (a.`id_product` = 1601) LIMIT 1
0.333 ms 1 /src/Adapter/EntityMapper.php:74
199
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 136) AND (b.`id_shop` = 1) LIMIT 1
0.324 ms 1 /src/Adapter/EntityMapper.php:74
207
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 143) AND (b.`id_shop` = 1) LIMIT 1
0.324 ms 1 /src/Adapter/EntityMapper.php:74
281
SELECT SQL_NO_CACHE *
FROM `tmohz_product` a
LEFT JOIN `tmohz_product_shop` `c` ON a.`id_product` = c.`id_product` AND c.`id_shop` = 1
WHERE (a.`id_product` = 665) LIMIT 1
0.321 ms 1 /src/Adapter/EntityMapper.php:74
217
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 157) AND (b.`id_shop` = 1) LIMIT 1
0.312 ms 1 /src/Adapter/EntityMapper.php:74
327
SELECT SQL_NO_CACHE cl.`link_rewrite`
FROM `tmohz_category_lang` cl
WHERE `id_lang` = 2
AND cl.id_shop = 1 
AND cl.`id_category` = 140 LIMIT 1
0.312 ms 1 /classes/Category.php:1396
251
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 134) AND (b.`id_shop` = 1) LIMIT 1
0.309 ms 1 /src/Adapter/EntityMapper.php:74
249
SELECT SQL_NO_CACHE 1 FROM tmohz_cart_product cp INNER JOIN tmohz_product p
ON (p.id_product = cp.id_product) INNER JOIN tmohz_product_shop ps
ON (ps.id_shop = cp.id_shop AND ps.id_product = p.id_product) WHERE cp.id_cart=0 LIMIT 1
0.300 ms 1 /classes/Cart.php:4072
297
SELECT SQL_NO_CACHE product_shop.`price`, product_shop.`ecotax`,
IFNULL(product_attribute_shop.id_product_attribute,0) id_product_attribute, product_attribute_shop.`price` AS attribute_price, product_attribute_shop.default_on, product_attribute_shop.`ecotax` AS attribute_ecotax
FROM `tmohz_product` p
INNER JOIN `tmohz_product_shop` `product_shop` ON (product_shop.id_product=p.id_product AND product_shop.id_shop = 1)
LEFT JOIN `tmohz_product_attribute_shop` `product_attribute_shop` ON (product_attribute_shop.id_product = p.id_product AND product_attribute_shop.id_shop = 1)
WHERE (p.`id_product` = 1601)
0.297 ms 1 /classes/Product.php:3629
222
SELECT SQL_NO_CACHE *
FROM `tmohz_category` c
INNER JOIN tmohz_category_shop category_shop
ON (category_shop.id_category = c.id_category AND category_shop.id_shop = 1)
LEFT JOIN `tmohz_category_lang` cl ON c.`id_category` = cl.`id_category` AND cl.id_shop = 1 
WHERE 1  and c.id_category IN (162)  AND `id_lang` = 2
AND `active` = 1
ORDER BY c.`level_depth` ASC, category_shop.`position` ASC
0.296 ms 1 /classes/Category.php:657
309
SELECT SQL_NO_CACHE product_shop.`price`, product_shop.`ecotax`,
IFNULL(product_attribute_shop.id_product_attribute,0) id_product_attribute, product_attribute_shop.`price` AS attribute_price, product_attribute_shop.default_on, product_attribute_shop.`ecotax` AS attribute_ecotax
FROM `tmohz_product` p
INNER JOIN `tmohz_product_shop` `product_shop` ON (product_shop.id_product=p.id_product AND product_shop.id_shop = 1)
LEFT JOIN `tmohz_product_attribute_shop` `product_attribute_shop` ON (product_attribute_shop.id_product = p.id_product AND product_attribute_shop.id_shop = 1)
WHERE (p.`id_product` = 9480)
0.295 ms 1 /classes/Product.php:3629
175
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 57) AND (b.`id_shop` = 1) LIMIT 1
0.292 ms 1 /src/Adapter/EntityMapper.php:74
355
SELECT SQL_NO_CACHE product_shop.`price`, product_shop.`ecotax`,
IFNULL(product_attribute_shop.id_product_attribute,0) id_product_attribute, product_attribute_shop.`price` AS attribute_price, product_attribute_shop.default_on, product_attribute_shop.`ecotax` AS attribute_ecotax
FROM `tmohz_product` p
INNER JOIN `tmohz_product_shop` `product_shop` ON (product_shop.id_product=p.id_product AND product_shop.id_shop = 1)
LEFT JOIN `tmohz_product_attribute_shop` `product_attribute_shop` ON (product_attribute_shop.id_product = p.id_product AND product_attribute_shop.id_shop = 1)
WHERE (p.`id_product` = 13028)
0.290 ms 1 /classes/Product.php:3629
124
SELECT SQL_NO_CACHE cl.`link_rewrite`
FROM `tmohz_category_lang` cl
WHERE `id_lang` = 4
AND cl.id_shop = 1 
AND cl.`id_category` = 98 LIMIT 1
0.287 ms 1 /classes/Category.php:1396
366
SELECT SQL_NO_CACHE * FROM `tmohz_occ_supplier_orders`
WHERE `id_product` = 665
AND `active` = 1
AND `expected_date` &gt;= CURDATE()
ORDER BY `expected_date` ASC
0.286 ms 1 Yes /modules/desoccfeatures/classes/OccSupplierOrder.php:60
6
SELECT SQL_NO_CACHE *
FROM `tmohz_country` a
LEFT JOIN `tmohz_country_lang` `b` ON a.`id_country` = b.`id_country` AND b.`id_lang` = 1
LEFT JOIN `tmohz_country_shop` `c` ON a.`id_country` = c.`id_country` AND c.`id_shop` = 1
WHERE (a.`id_country` = 6) LIMIT 1
0.285 ms 1 /src/Adapter/EntityMapper.php:74
58
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 2) AND (b.`id_shop` = 1) LIMIT 1
0.275 ms 1 /src/Adapter/EntityMapper.php:74
167
SELECT SQL_NO_CACHE meta_value
FROM `tmohz_st_site_builder_postmeta`
WHERE (post_id=9) AND (meta_key='_field_no_header') LIMIT 1
0.274 ms 7 /modules/stsitebuilder/stsitebuilder.php:1027
102
SELECT SQL_NO_CACHE *
FROM `tmohz_manufacturer` a
LEFT JOIN `tmohz_manufacturer_lang` `b` ON a.`id_manufacturer` = b.`id_manufacturer` AND b.`id_lang` = 2
LEFT JOIN `tmohz_manufacturer_shop` `c` ON a.`id_manufacturer` = c.`id_manufacturer` AND c.`id_shop` = 1
WHERE (a.`id_manufacturer` = 81) LIMIT 1
0.269 ms 1 /src/Adapter/EntityMapper.php:74
96
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 98) AND (b.`id_shop` = 1) LIMIT 1
0.268 ms 1 /src/Adapter/EntityMapper.php:74
141
SELECT SQL_NO_CACHE COUNT(DISTINCT c.id_currency) FROM `tmohz_currency` c
LEFT JOIN tmohz_currency_shop cs ON (cs.id_currency = c.id_currency AND cs.id_shop = 1)
WHERE c.`active` = 1 AND c.`deleted` = 0 LIMIT 1
0.259 ms 3 /classes/Currency.php:1120
106
SELECT SQL_NO_CACHE pa.id_product_attribute
FROM `tmohz_product_attribute` pa INNER JOIN tmohz_product_attribute_shop product_attribute_shop
ON (product_attribute_shop.id_product_attribute = pa.id_product_attribute AND product_attribute_shop.id_shop = 1)
WHERE pa.`id_product` = 46320
0.258 ms 1 /classes/Product.php:7192
33
SELECT SQL_NO_CACHE *
FROM `tmohz_currency` a
LEFT JOIN `tmohz_currency_lang` `b` ON a.`id_currency` = b.`id_currency` AND b.`id_lang` = 2
LEFT JOIN `tmohz_currency_shop` `c` ON a.`id_currency` = c.`id_currency` AND c.`id_shop` = 1
WHERE (a.`id_currency` = 1) LIMIT 1
0.257 ms 1 /src/Adapter/EntityMapper.php:74
114
SELECT SQL_NO_CACHE pa.id_product_attribute
FROM `tmohz_product_attribute` pa INNER JOIN tmohz_product_attribute_shop product_attribute_shop
ON (product_attribute_shop.id_product_attribute = pa.id_product_attribute AND product_attribute_shop.id_shop = 1)
WHERE pa.`id_product` = 46320
0.253 ms 1 /classes/Product.php:7192
330
SELECT SQL_NO_CACHE ctg.`id_group`
FROM `tmohz_category_product` cp
INNER JOIN `tmohz_category_group` ctg ON (ctg.`id_category` = cp.`id_category`)
WHERE cp.`id_product` = 11413 AND ctg.`id_group` = 1 LIMIT 1
0.251 ms 3 /classes/Product.php:6525
30
SELECT SQL_NO_CACHE * FROM `tmohz_currency` c ORDER BY `iso_code` ASC
0.250 ms 3 Yes /classes/Currency.php:708
285
SELECT SQL_NO_CACHE product_shop.`price`, product_shop.`ecotax`,
IFNULL(product_attribute_shop.id_product_attribute,0) id_product_attribute, product_attribute_shop.`price` AS attribute_price, product_attribute_shop.default_on, product_attribute_shop.`ecotax` AS attribute_ecotax
FROM `tmohz_product` p
INNER JOIN `tmohz_product_shop` `product_shop` ON (product_shop.id_product=p.id_product AND product_shop.id_shop = 1)
LEFT JOIN `tmohz_product_attribute_shop` `product_attribute_shop` ON (product_attribute_shop.id_product = p.id_product AND product_attribute_shop.id_shop = 1)
WHERE (p.`id_product` = 665)
0.245 ms 1 /classes/Product.php:3629
157
SELECT SQL_NO_CACHE `id_module` FROM `tmohz_module_shop` WHERE `id_module` = 101 AND `id_shop` = 1 LIMIT 1
0.243 ms 1 /classes/module/Module.php:2270
204
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 154) AND (b.`id_shop` = 1) LIMIT 1
0.240 ms 1 /src/Adapter/EntityMapper.php:74
351
SELECT SQL_NO_CACHE ctg.`id_group`
FROM `tmohz_category_product` cp
INNER JOIN `tmohz_category_group` ctg ON (ctg.`id_category` = cp.`id_category`)
WHERE cp.`id_product` = 13027 AND ctg.`id_group` = 1 LIMIT 1
0.240 ms 1 /classes/Product.php:6525
142
SELECT SQL_NO_CACHE *
FROM `tmohz_gender` a0
LEFT JOIN `tmohz_gender_lang` `a1` ON (a0.`id_gender` = a1.`id_gender`)
WHERE (a1.`id_lang` = 2)
0.239 ms 2 /classes/PrestaShopCollection.php:381
224
SELECT SQL_NO_CACHE *
FROM `tmohz_category` c
INNER JOIN tmohz_category_shop category_shop
ON (category_shop.id_category = c.id_category AND category_shop.id_shop = 1)
LEFT JOIN `tmohz_category_lang` cl ON c.`id_category` = cl.`id_category` AND cl.id_shop = 1 
WHERE 1  and c.id_category IN (167)  AND `id_lang` = 2
AND `active` = 1
ORDER BY c.`level_depth` ASC, category_shop.`position` ASC
0.238 ms 1 /classes/Category.php:657
388
SELECT SQL_NO_CACHE c.`nleft`, c.`nright`  FROM `tmohz_category` c
LEFT JOIN `tmohz_category_lang` cl
ON (c.`id_category` = cl.`id_category`
AND `id_lang` = 2 AND cl.id_shop = 1 ) WHERE c.`id_category` = 98 LIMIT 1
0.237 ms 1 /classes/Category.php:1607
369
SELECT SQL_NO_CACHE * FROM `tmohz_occ_supplier_orders`
WHERE `id_product` = 1601
AND `active` = 1
AND `expected_date` &gt;= CURDATE()
ORDER BY `expected_date` ASC
0.235 ms 3 Yes /modules/desoccfeatures/classes/OccSupplierOrder.php:60
324
SELECT SQL_NO_CACHE SUM(quantity)
FROM `tmohz_stock_available`
WHERE (id_product = 11413) AND (id_product_attribute = 0) AND (id_shop = 1) AND (id_shop_group = 0) LIMIT 1
0.234 ms 1 /classes/stock/StockAvailable.php:286
190
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 35) AND (b.`id_shop` = 1) LIMIT 1
0.233 ms 1 /src/Adapter/EntityMapper.php:74
381
SELECT SQL_NO_CACHE `id_guest`
FROM `tmohz_connections`
WHERE `id_guest` = 86785
AND `date_add` &gt; '2026-04-21 12:55:00'
AND id_shop IN (1) 
ORDER BY `date_add` DESC LIMIT 1
0.233 ms 1 Yes /classes/Connection.php:168
362
SELECT SQL_NO_CACHE quantity FROM `tmohz_stock_available`
WHERE id_product = 665 
AND id_product_attribute = 0 LIMIT 1
0.232 ms 1 /modules/desoccstockerp/desoccstockerp.php:539
223
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 167) AND (b.`id_shop` = 1) LIMIT 1
0.231 ms 1 /src/Adapter/EntityMapper.php:74
55
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 98) LIMIT 1
0.230 ms 1 /src/Adapter/EntityMapper.php:74
17
SELECT SQL_NO_CACHE `name`, `alias` FROM `tmohz_hook_alias`
0.229 ms 86 /classes/Hook.php:319
361
SELECT SQL_NO_CACHE ctg.`id_group`
FROM `tmohz_category_product` cp
INNER JOIN `tmohz_category_group` ctg ON (ctg.`id_category` = cp.`id_category`)
WHERE cp.`id_product` = 13028 AND ctg.`id_group` = 1 LIMIT 1
0.228 ms 1 /classes/Product.php:6525
129
SELECT SQL_NO_CACHE * FROM `tmohz_image_type` WHERE 1 AND `categories` = 1  ORDER BY `width` DESC, `height` DESC, `name`ASC
0.227 ms 8 Yes /classes/ImageType.php:109
341
SELECT SQL_NO_CACHE ctg.`id_group`
FROM `tmohz_category_product` cp
INNER JOIN `tmohz_category_group` ctg ON (ctg.`id_category` = cp.`id_category`)
WHERE cp.`id_product` = 11716 AND ctg.`id_group` = 1 LIMIT 1
0.227 ms 2 /classes/Product.php:6525
317
SELECT SQL_NO_CACHE ctg.`id_group`
FROM `tmohz_category_product` cp
INNER JOIN `tmohz_category_group` ctg ON (ctg.`id_category` = cp.`id_category`)
WHERE cp.`id_product` = 9480 AND ctg.`id_group` = 1 LIMIT 1
0.225 ms 3 /classes/Product.php:6525
332
SELECT SQL_NO_CACHE *
FROM `tmohz_product_lang`
WHERE `id_product` = 11716 AND `id_shop` = 1
0.225 ms 6 /src/Adapter/EntityMapper.php:82
115
SELECT SQL_NO_CACHE * FROM `tmohz_image_type` WHERE 1 AND `products` = 1  ORDER BY `width` DESC, `height` DESC, `name`ASC
0.224 ms 8 Yes /classes/ImageType.php:109
269
SELECT SQL_NO_CACHE *
FROM `tmohz_product_lang`
WHERE `id_product` = 21 AND `id_shop` = 1
0.222 ms 6 /src/Adapter/EntityMapper.php:82
183
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 66) AND (b.`id_shop` = 1) LIMIT 1
0.219 ms 1 /src/Adapter/EntityMapper.php:74
109
SELECT SQL_NO_CACHE pa.id_product_attribute
FROM `tmohz_product_attribute` pa INNER JOIN tmohz_product_attribute_shop product_attribute_shop
ON (product_attribute_shop.id_product_attribute = pa.id_product_attribute AND product_attribute_shop.id_shop = 1)
WHERE pa.`id_product` = 46320
0.217 ms 1 /classes/Product.php:7192
200
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 137) AND (b.`id_shop` = 1) LIMIT 1
0.216 ms 1 /src/Adapter/EntityMapper.php:74
233
SELECT SQL_NO_CACHE `id_module` FROM `tmohz_module` WHERE `name` = "ps_currencyselector" LIMIT 1
0.216 ms 1 /classes/module/Module.php:2781
225
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 170) AND (b.`id_shop` = 1) LIMIT 1
0.215 ms 1 /src/Adapter/EntityMapper.php:74
3
SELECT SQL_NO_CACHE *
FROM `tmohz_shop` a
WHERE (a.`id_shop` = 1) LIMIT 1
0.214 ms 1 /src/Adapter/EntityMapper.php:74
208
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 144) AND (b.`id_shop` = 1) LIMIT 1
0.213 ms 1 /src/Adapter/EntityMapper.php:74
176
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 58) AND (b.`id_shop` = 1) LIMIT 1
0.213 ms 1 /src/Adapter/EntityMapper.php:74
193
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 122) AND (b.`id_shop` = 1) LIMIT 1
0.213 ms 1 /src/Adapter/EntityMapper.php:74
340
SELECT SQL_NO_CACHE pa.id_product_attribute
FROM `tmohz_product_attribute` pa INNER JOIN tmohz_product_attribute_shop product_attribute_shop
ON (product_attribute_shop.id_product_attribute = pa.id_product_attribute AND product_attribute_shop.id_shop = 1)
WHERE pa.`id_product` = 11716
0.212 ms 1 /classes/Product.php:7192
304
SELECT SQL_NO_CACHE ctg.`id_group`
FROM `tmohz_category_product` cp
INNER JOIN `tmohz_category_group` ctg ON (ctg.`id_category` = cp.`id_category`)
WHERE cp.`id_product` = 1601 AND ctg.`id_group` = 1 LIMIT 1
0.211 ms 2 /classes/Product.php:6525
329
SELECT SQL_NO_CACHE pa.id_product_attribute
FROM `tmohz_product_attribute` pa INNER JOIN tmohz_product_attribute_shop product_attribute_shop
ON (product_attribute_shop.id_product_attribute = pa.id_product_attribute AND product_attribute_shop.id_shop = 1)
WHERE pa.`id_product` = 11413
0.210 ms 1 /classes/Product.php:7192
218
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 158) AND (b.`id_shop` = 1) LIMIT 1
0.210 ms 1 /src/Adapter/EntityMapper.php:74
353
SELECT SQL_NO_CACHE *
FROM `tmohz_product_lang`
WHERE `id_product` = 13028 AND `id_shop` = 1
0.207 ms 6 /src/Adapter/EntityMapper.php:82
306
SELECT SQL_NO_CACHE *
FROM `tmohz_product_lang`
WHERE `id_product` = 9480 AND `id_shop` = 1
0.206 ms 6 /src/Adapter/EntityMapper.php:82
205
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 155) AND (b.`id_shop` = 1) LIMIT 1
0.200 ms 1 /src/Adapter/EntityMapper.php:74
226
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 171) AND (b.`id_shop` = 1) LIMIT 1
0.199 ms 1 /src/Adapter/EntityMapper.php:74
170
SELECT SQL_NO_CACHE count(0) FROM `tmohz_st_site_builder` sb INNER JOIN `tmohz_st_site_builder_shop` sbs ON sb.`id_st_site_builder`=sbs.`id_st_site_builder` WHERE sb.`id_st_site_builder`=2 AND sbs.`id_shop`=1 AND sb.`active`=1 LIMIT 1
0.199 ms 1 /modules/stsitebuilder/stsitebuilder.php:945
241
SELECT SQL_NO_CACHE count(0) FROM `tmohz_st_site_builder` sb INNER JOIN `tmohz_st_site_builder_shop` sbs ON sb.`id_st_site_builder`=sbs.`id_st_site_builder` WHERE sb.`id_st_site_builder`=7 AND sbs.`id_shop`=1 AND sb.`active`=1 LIMIT 1
0.199 ms 1 /modules/stsitebuilder/stsitebuilder.php:945
201
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 138) AND (b.`id_shop` = 1) LIMIT 1
0.194 ms 1 /src/Adapter/EntityMapper.php:74
209
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 145) AND (b.`id_shop` = 1) LIMIT 1
0.194 ms 1 /src/Adapter/EntityMapper.php:74
177
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 59) AND (b.`id_shop` = 1) LIMIT 1
0.193 ms 1 /src/Adapter/EntityMapper.php:74
178
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 60) AND (b.`id_shop` = 1) LIMIT 1
0.193 ms 1 /src/Adapter/EntityMapper.php:74
219
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 159) AND (b.`id_shop` = 1) LIMIT 1
0.193 ms 1 /src/Adapter/EntityMapper.php:74
37
SELECT SQL_NO_CACHE *
FROM `tmohz_currency` a
LEFT JOIN `tmohz_currency_lang` `b` ON a.`id_currency` = b.`id_currency` AND b.`id_lang` = 2
LEFT JOIN `tmohz_currency_shop` `c` ON a.`id_currency` = c.`id_currency` AND c.`id_shop` = 1
WHERE (a.`id_currency` = 3) LIMIT 1
0.192 ms 1 /src/Adapter/EntityMapper.php:74
210
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 146) AND (b.`id_shop` = 1) LIMIT 1
0.191 ms 1 /src/Adapter/EntityMapper.php:74
211
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 147) AND (b.`id_shop` = 1) LIMIT 1
0.191 ms 1 /src/Adapter/EntityMapper.php:74
227
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 172) AND (b.`id_shop` = 1) LIMIT 1
0.191 ms 1 /src/Adapter/EntityMapper.php:74
53
SELECT SQL_NO_CACHE cl.`link_rewrite`
FROM `tmohz_category_lang` cl
WHERE `id_lang` = 0
AND cl.id_shop = 1 
AND cl.`id_category` = 98 LIMIT 1
0.190 ms 0 /classes/Category.php:1396
93
SELECT SQL_NO_CACHE pa.id_product_attribute
FROM `tmohz_product_attribute` pa INNER JOIN tmohz_product_attribute_shop product_attribute_shop
ON (product_attribute_shop.id_product_attribute = pa.id_product_attribute AND product_attribute_shop.id_shop = 1)
WHERE pa.`id_product` = 46320
0.190 ms 1 /classes/Product.php:7192
213
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 149) AND (b.`id_shop` = 1) LIMIT 1
0.190 ms 1 /src/Adapter/EntityMapper.php:74
214
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 150) AND (b.`id_shop` = 1) LIMIT 1
0.190 ms 1 /src/Adapter/EntityMapper.php:74
215
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 151) AND (b.`id_shop` = 1) LIMIT 1
0.190 ms 1 /src/Adapter/EntityMapper.php:74
228
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 173) AND (b.`id_shop` = 1) LIMIT 1
0.190 ms 1 /src/Adapter/EntityMapper.php:74
316
SELECT SQL_NO_CACHE pa.id_product_attribute
FROM `tmohz_product_attribute` pa INNER JOIN tmohz_product_attribute_shop product_attribute_shop
ON (product_attribute_shop.id_product_attribute = pa.id_product_attribute AND product_attribute_shop.id_shop = 1)
WHERE pa.`id_product` = 9480
0.190 ms 1 /classes/Product.php:7192
375
SELECT SQL_NO_CACHE * FROM `tmohz_occ_supplier_orders`
WHERE `id_product` = 13027
AND `active` = 1
AND `expected_date` &gt;= CURDATE()
ORDER BY `expected_date` ASC
0.190 ms 1 Yes /modules/desoccfeatures/classes/OccSupplierOrder.php:60
95
SELECT SQL_NO_CACHE ctg.`id_group`
FROM `tmohz_category_product` cp
INNER JOIN `tmohz_category_group` ctg ON (ctg.`id_category` = cp.`id_category`)
WHERE cp.`id_product` = 46320 AND ctg.`id_group` = 1 LIMIT 1
0.189 ms 1 /classes/Product.php:6525
194
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 123) AND (b.`id_shop` = 1) LIMIT 1
0.189 ms 1 /src/Adapter/EntityMapper.php:74
229
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 174) AND (b.`id_shop` = 1) LIMIT 1
0.189 ms 1 /src/Adapter/EntityMapper.php:74
230
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 175) AND (b.`id_shop` = 1) LIMIT 1
0.189 ms 1 /src/Adapter/EntityMapper.php:74
231
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 176) AND (b.`id_shop` = 1) LIMIT 1
0.189 ms 1 /src/Adapter/EntityMapper.php:74
212
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 148) AND (b.`id_shop` = 1) LIMIT 1
0.188 ms 1 /src/Adapter/EntityMapper.php:74
236
SELECT SQL_NO_CACHE *
FROM `tmohz_currency` a
LEFT JOIN `tmohz_currency_shop` `c` ON a.`id_currency` = c.`id_currency` AND c.`id_shop` = 1
WHERE (a.`id_currency` = 3) LIMIT 1
0.187 ms 1 /src/Adapter/EntityMapper.php:74
195
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 124) AND (b.`id_shop` = 1) LIMIT 1
0.186 ms 1 /src/Adapter/EntityMapper.php:74
303
SELECT SQL_NO_CACHE pa.id_product_attribute
FROM `tmohz_product_attribute` pa INNER JOIN tmohz_product_attribute_shop product_attribute_shop
ON (product_attribute_shop.id_product_attribute = pa.id_product_attribute AND product_attribute_shop.id_shop = 1)
WHERE pa.`id_product` = 1601
0.186 ms 1 /classes/Product.php:7192
243
SELECT SQL_NO_CACHE c.`nleft`, c.`nright`  FROM `tmohz_category` c
LEFT JOIN `tmohz_category_lang` cl
ON (c.`id_category` = cl.`id_category`
AND `id_lang` = 2 AND cl.id_shop = 1 ) WHERE c.`id_category` = 98 LIMIT 1
0.185 ms 1 /classes/Category.php:1607
280
SELECT SQL_NO_CACHE ctg.`id_group`
FROM `tmohz_category_product` cp
INNER JOIN `tmohz_category_group` ctg ON (ctg.`id_category` = cp.`id_category`)
WHERE cp.`id_product` = 21 AND ctg.`id_group` = 1 LIMIT 1
0.183 ms 1 /classes/Product.php:6525
196
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 125) AND (b.`id_shop` = 1) LIMIT 1
0.183 ms 1 /src/Adapter/EntityMapper.php:74
179
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 61) AND (b.`id_shop` = 1) LIMIT 1
0.180 ms 1 /src/Adapter/EntityMapper.php:74
180
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 62) AND (b.`id_shop` = 1) LIMIT 1
0.180 ms 1 /src/Adapter/EntityMapper.php:74
184
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 67) AND (b.`id_shop` = 1) LIMIT 1
0.180 ms 1 /src/Adapter/EntityMapper.php:74
282
SELECT SQL_NO_CACHE *
FROM `tmohz_product_lang`
WHERE `id_product` = 665 AND `id_shop` = 1
0.180 ms 6 /src/Adapter/EntityMapper.php:82
295
SELECT SQL_NO_CACHE *
FROM `tmohz_product_lang`
WHERE `id_product` = 1601 AND `id_shop` = 1
0.180 ms 6 /src/Adapter/EntityMapper.php:82
136
SELECT SQL_NO_CACHE *
FROM `tmohz_country` a
LEFT JOIN `tmohz_country_shop` `c` ON a.`id_country` = c.`id_country` AND c.`id_shop` = 1
WHERE (a.`id_country` = 6) LIMIT 1
0.179 ms 1 /src/Adapter/EntityMapper.php:74
182
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 65) AND (b.`id_shop` = 1) LIMIT 1
0.179 ms 1 /src/Adapter/EntityMapper.php:74
56
SELECT SQL_NO_CACHE *
FROM `tmohz_category_lang`
WHERE `id_category` = 98 AND `id_shop` = 1
0.178 ms 6 /src/Adapter/EntityMapper.php:82
63
SELECT SQL_NO_CACHE c.`nleft`, c.`nright`  FROM `tmohz_category` c
LEFT JOIN `tmohz_category_lang` cl
ON (c.`id_category` = cl.`id_category`
AND `id_lang` = 2 AND cl.id_shop = 1 ) WHERE c.`id_category` = 98 LIMIT 1
0.178 ms 1 /classes/Category.php:1607
187
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 70) AND (b.`id_shop` = 1) LIMIT 1
0.178 ms 1 /src/Adapter/EntityMapper.php:74
181
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 63) AND (b.`id_shop` = 1) LIMIT 1
0.178 ms 1 /src/Adapter/EntityMapper.php:74
185
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 68) AND (b.`id_shop` = 1) LIMIT 1
0.177 ms 1 /src/Adapter/EntityMapper.php:74
293
SELECT SQL_NO_CACHE ctg.`id_group`
FROM `tmohz_category_product` cp
INNER JOIN `tmohz_category_group` ctg ON (ctg.`id_category` = cp.`id_category`)
WHERE cp.`id_product` = 665 AND ctg.`id_group` = 1 LIMIT 1
0.177 ms 1 /classes/Product.php:6525
41
SELECT SQL_NO_CACHE *
FROM `tmohz_currency` a
LEFT JOIN `tmohz_currency_lang` `b` ON a.`id_currency` = b.`id_currency` AND b.`id_lang` = 2
LEFT JOIN `tmohz_currency_shop` `c` ON a.`id_currency` = c.`id_currency` AND c.`id_shop` = 1
WHERE (a.`id_currency` = 2) LIMIT 1
0.175 ms 1 /src/Adapter/EntityMapper.php:74
89
SELECT SQL_NO_CACHE SUM(quantity)
FROM `tmohz_stock_available`
WHERE (id_product = 46320) AND (id_product_attribute = 0) AND (id_shop = 1) AND (id_shop_group = 0) LIMIT 1
0.175 ms 1 /classes/stock/StockAvailable.php:286
186
SELECT SQL_NO_CACHE *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = 2
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = 1
WHERE (a.`id_category` = 69) AND (b.`id_shop` = 1) LIMIT 1
0.175 ms 1 /src/Adapter/EntityMapper.php:74
367
SELECT SQL_NO_CACHE quantity FROM `tmohz_stock_available`
WHERE id_product = 1601 
AND id_product_attribute = 0 LIMIT 1
0.174 ms 1 /modules/desoccstockerp/desoccstockerp.php:539
347
SELECT SQL_NO_CACHE SUM(quantity)
FROM `tmohz_stock_available`
WHERE (id_product = 13027) AND (id_product_attribute = 0) AND (id_shop = 1) AND (id_shop_group = 0) LIMIT 1
0.173 ms 1 /classes/stock/StockAvailable.php:286
72
SELECT SQL_NO_CACHE s.id_shop, s.id_shop_group FROM tmohz_shop s
0.173 ms 1 /classes/shop/Shop.php:922
98
SELECT SQL_NO_CACHE c.`nleft`, c.`nright`, c.`level_depth`
FROM `tmohz_category` c
WHERE (c.`id_category` = 2) LIMIT 1
0.172 ms 1 /classes/Category.php:1980
279
SELECT SQL_NO_CACHE pa.id_product_attribute
FROM `tmohz_product_attribute` pa INNER JOIN tmohz_product_attribute_shop product_attribute_shop
ON (product_attribute_shop.id_product_attribute = pa.id_product_attribute AND product_attribute_shop.id_shop = 1)
WHERE pa.`id_product` = 21
0.172 ms 1 /classes/Product.php:7192
378
SELECT SQL_NO_CACHE * FROM `tmohz_occ_supplier_orders`
WHERE `id_product` = 13028
AND `active` = 1
AND `expected_date` &gt;= CURDATE()
ORDER BY `expected_date` ASC
0.170 ms 1 Yes /modules/desoccfeatures/classes/OccSupplierOrder.php:60
292
SELECT SQL_NO_CACHE pa.id_product_attribute
FROM `tmohz_product_attribute` pa INNER JOIN tmohz_product_attribute_shop product_attribute_shop
ON (product_attribute_shop.id_product_attribute = pa.id_product_attribute AND product_attribute_shop.id_shop = 1)
WHERE pa.`id_product` = 665
0.169 ms 1 /classes/Product.php:7192
168
SELECT SQL_NO_CACHE meta_value
FROM `tmohz_st_site_builder_postmeta`
WHERE (post_id=9) AND (meta_key='_field_no_footer') LIMIT 1
0.169 ms 7 /modules/stsitebuilder/stsitebuilder.php:1028
79
SELECT SQL_NO_CACHE 1 FROM `tmohz_specific_price` WHERE `id_product` != 0 LIMIT 1
0.166 ms 1 /classes/SpecificPrice.php:304
248
SELECT SQL_NO_CACHE name FROM tmohz_category_lang
WHERE id_shop = 1 AND id_lang = 2 AND id_category = 98 LIMIT 1
0.166 ms 1 /src/Adapter/Presenter/Product/ProductLazyArray.php:624
265
SELECT SQL_NO_CACHE ctg.`id_group`
FROM tmohz_category_group ctg
WHERE ctg.`id_category` = 2 AND ctg.`id_group` = 1 LIMIT 1
0.166 ms 1 /classes/Category.php:1774
363
SELECT SQL_NO_CACHE * FROM `tmohz_stock_fabrica` WHERE reference = "RC414101575" LIMIT 1
0.165 ms 1 /modules/desoccstockerp/desoccstockerp.php:467
370
SELECT SQL_NO_CACHE quantity FROM `tmohz_stock_available`
WHERE id_product = 9480 
AND id_product_attribute = 0 LIMIT 1
0.165 ms 1 /modules/desoccstockerp/desoccstockerp.php:539
240
SELECT SQL_NO_CACHE id_st_site_builder FROM tmohz_st_site_builder WHERE `code` = "EEFXPVWC" LIMIT 1
0.164 ms 175 /modules/stsitebuilder/stsitebuilder.php:943
137
SELECT SQL_NO_CACHE *
FROM `tmohz_country_lang`
WHERE `id_country` = 6
0.163 ms 6 /src/Adapter/EntityMapper.php:82
237
SELECT SQL_NO_CACHE *
FROM `tmohz_currency_lang`
WHERE `id_currency` = 3
0.162 ms 6 /src/Adapter/EntityMapper.php:82
59
SELECT SQL_NO_CACHE c.`nleft`, c.`nright`  FROM `tmohz_category` c
LEFT JOIN `tmohz_category_lang` cl
ON (c.`id_category` = cl.`id_category`
AND `id_lang` = 2 AND cl.id_shop = 1 ) WHERE c.`id_category` = 98 LIMIT 1
0.159 ms 1 /classes/Category.php:1607
257
SELECT SQL_NO_CACHE c.`nleft`, c.`nright` FROM `tmohz_category` c
WHERE c.`id_category` = 2 LIMIT 1
0.158 ms 1 /classes/Category.php:1612
46
SELECT SQL_NO_CACHE *
FROM `tmohz_group` a
LEFT JOIN `tmohz_group_shop` `c` ON a.`id_group` = c.`id_group` AND c.`id_shop` = 1
WHERE (a.`id_group` = 1) LIMIT 1
0.157 ms 1 /src/Adapter/EntityMapper.php:74
357
SELECT SQL_NO_CACHE SUM(quantity)
FROM `tmohz_stock_available`
WHERE (id_product = 13028) AND (id_product_attribute = 0) AND (id_shop = 1) AND (id_shop_group = 0) LIMIT 1
0.156 ms 1 /classes/stock/StockAvailable.php:286
54
SELECT SQL_NO_CACHE `id_category` FROM `tmohz_category_product`
WHERE `id_product` = 46320
0.155 ms 1 /classes/Product.php:3166
299
SELECT SQL_NO_CACHE SUM(quantity)
FROM `tmohz_stock_available`
WHERE (id_product = 1601) AND (id_product_attribute = 0) AND (id_shop = 1) AND (id_shop_group = 0) LIMIT 1
0.154 ms 1 /classes/stock/StockAvailable.php:286
238
SELECT SQL_NO_CACHE *
FROM `tmohz_currency` a
LEFT JOIN `tmohz_currency_shop` `c` ON a.`id_currency` = c.`id_currency` AND c.`id_shop` = 1
WHERE (a.`id_currency` = 2) LIMIT 1
0.154 ms 1 /src/Adapter/EntityMapper.php:74
31
SELECT SQL_NO_CACHE `id_lang` FROM `tmohz_lang`
WHERE `locale` = 'en-us'
OR `language_code` = 'en-us' LIMIT 1
0.153 ms 6 /classes/Language.php:870
174
SELECT SQL_NO_CACHE SUM(`quantity`)
FROM `tmohz_cart_product`
WHERE `id_cart` = 0 LIMIT 1
0.153 ms 1 /classes/Cart.php:1321
311
SELECT SQL_NO_CACHE SUM(quantity)
FROM `tmohz_stock_available`
WHERE (id_product = 9480) AND (id_product_attribute = 0) AND (id_shop = 1) AND (id_shop_group = 0) LIMIT 1
0.153 ms 1 /classes/stock/StockAvailable.php:286
122
SELECT SQL_NO_CACHE cl.`link_rewrite`
FROM `tmohz_category_lang` cl
WHERE `id_lang` = 3
AND cl.id_shop = 1 
AND cl.`id_category` = 98 LIMIT 1
0.150 ms 1 /classes/Category.php:1396
371
SELECT SQL_NO_CACHE quantity FROM `tmohz_stock_available`
WHERE id_product = 11413 
AND id_product_attribute = 0 LIMIT 1
0.149 ms 1 /modules/desoccstockerp/desoccstockerp.php:539
130
SELECT SQL_NO_CACHE * FROM `tmohz_image_type` WHERE 1 AND `suppliers` = 1  ORDER BY `width` DESC, `height` DESC, `name`ASC
0.147 ms 8 Yes /classes/ImageType.php:109
274
SELECT SQL_NO_CACHE SUM(quantity)
FROM `tmohz_stock_available`
WHERE (id_product = 21) AND (id_product_attribute = 0) AND (id_shop = 1) AND (id_shop_group = 0) LIMIT 1
0.146 ms 1 /classes/stock/StockAvailable.php:286
43
SELECT SQL_NO_CACHE *
FROM `tmohz_currency` a
LEFT JOIN `tmohz_currency_shop` `c` ON a.`id_currency` = c.`id_currency` AND c.`id_shop` = 1
WHERE (a.`id_currency` = 1) LIMIT 1
0.146 ms 1 /src/Adapter/EntityMapper.php:74
14
SELECT SQL_NO_CACHE id_shop
FROM `tmohz_lang_shop`
WHERE `id_lang` = 2
AND id_shop = 1 LIMIT 1
0.144 ms 1 /classes/ObjectModel.php:1570
261
SELECT SQL_NO_CACHE * FROM `tmohz_stock_fabrica` WHERE reference = "S008016RMRGR" LIMIT 1
0.144 ms 1 /modules/desoccstockerp/desoccstockerp.php:467
376
SELECT SQL_NO_CACHE quantity FROM `tmohz_stock_available`
WHERE id_product = 13028 
AND id_product_attribute = 0 LIMIT 1
0.141 ms 1 /modules/desoccstockerp/desoccstockerp.php:539
32
SELECT SQL_NO_CACHE c.id_currency
FROM `tmohz_currency` c
WHERE (iso_code = 'EUR') LIMIT 1
0.139 ms 1 /classes/Currency.php:893
80
SELECT SQL_NO_CACHE 1 FROM `tmohz_specific_price` WHERE `from` BETWEEN '2026-04-21 00:00:00' AND '2026-04-21 23:59:59' LIMIT 1
0.139 ms 1 /classes/SpecificPrice.php:384
135
SELECT SQL_NO_CACHE *
FROM `tmohz_module_shop` m
WHERE (m.id_module = 89) AND (m.enable_device &amp; 1) AND (m.id_shop = 1)
0.139 ms 1 /modules/onepagecheckoutps/src/Service/PresTeamShop/PresTeamShopService.php:198
372
SELECT SQL_NO_CACHE quantity FROM `tmohz_stock_available`
WHERE id_product = 11716 
AND id_product_attribute = 0 LIMIT 1
0.139 ms 1 /modules/desoccstockerp/desoccstockerp.php:539
253
SELECT SQL_NO_CACHE `id_module` FROM `tmohz_module` WHERE `name` = "des_categorytree" LIMIT 1
0.138 ms 1 /classes/module/Module.php:2781
373
SELECT SQL_NO_CACHE quantity FROM `tmohz_stock_available`
WHERE id_product = 13027 
AND id_product_attribute = 0 LIMIT 1
0.137 ms 1 /modules/desoccstockerp/desoccstockerp.php:539
273
SELECT SQL_NO_CACHE `reduction`
FROM `tmohz_product_group_reduction_cache`
WHERE `id_product` = 21 AND `id_group` = 1 LIMIT 1
0.135 ms 0 /classes/GroupReduction.php:146
234
SELECT SQL_NO_CACHE `id_module` FROM `tmohz_module_shop` WHERE `id_module` = 7 AND `id_shop` = 1 LIMIT 1
0.132 ms 1 /classes/module/Module.php:2270
287
SELECT SQL_NO_CACHE SUM(quantity)
FROM `tmohz_stock_available`
WHERE (id_product = 665) AND (id_product_attribute = 0) AND (id_shop = 1) AND (id_shop_group = 0) LIMIT 1
0.131 ms 1 /classes/stock/StockAvailable.php:286
44
SELECT SQL_NO_CACHE *
FROM `tmohz_currency_lang`
WHERE `id_currency` = 1
0.131 ms 6 /src/Adapter/EntityMapper.php:82
50
SELECT SQL_NO_CACHE *
FROM `tmohz_st_site_builder_yuyan`
WHERE (id_st_site_builder=0)
0.129 ms 1 /modules/stsitebuilder/classes/SiteBuilderBase.php:55
164
SELECT SQL_NO_CACHE c.`nleft`, c.`nright` FROM `tmohz_category` c
WHERE c.`id_category` = 2 LIMIT 1
0.129 ms 1 /classes/Category.php:1612
314
SELECT SQL_NO_CACHE cl.`link_rewrite`
FROM `tmohz_category_lang` cl
WHERE `id_lang` = 2
AND cl.id_shop = 1 
AND cl.`id_category` = 106 LIMIT 1
0.129 ms 1 /classes/Category.php:1396
131
SELECT SQL_NO_CACHE * FROM `tmohz_image_type` WHERE 1 AND `stores` = 1  ORDER BY `width` DESC, `height` DESC, `name`ASC
0.127 ms 8 Yes /classes/ImageType.php:109
346
SELECT SQL_NO_CACHE `reduction`
FROM `tmohz_product_group_reduction_cache`
WHERE `id_product` = 13027 AND `id_group` = 1 LIMIT 1
0.127 ms 0 /classes/GroupReduction.php:146
172
SELECT SQL_NO_CACHE `id_module` FROM `tmohz_module` WHERE `name` = "ps_languageselector" LIMIT 1
0.126 ms 1 /classes/module/Module.php:2781
82
SELECT SQL_NO_CACHE `priority`, `id_specific_price_priority`
FROM `tmohz_specific_price_priority`
WHERE `id_product` = 46320
ORDER BY `id_specific_price_priority` DESC LIMIT 1
0.124 ms 0 /classes/SpecificPrice.php:263
85
SELECT SQL_NO_CACHE `id_tax_rules_group`
FROM `tmohz_product_shop`
WHERE `id_product` = 46320 AND id_shop=1 LIMIT 1
0.124 ms 1 /classes/Product.php:6568
368
SELECT SQL_NO_CACHE * FROM `tmohz_stock_fabrica` WHERE reference = "RC070770885" LIMIT 1
0.121 ms 1 /modules/desoccstockerp/desoccstockerp.php:467
239
SELECT SQL_NO_CACHE *
FROM `tmohz_currency_lang`
WHERE `id_currency` = 2
0.120 ms 6 /src/Adapter/EntityMapper.php:82
290
SELECT SQL_NO_CACHE cl.`link_rewrite`
FROM `tmohz_category_lang` cl
WHERE `id_lang` = 2
AND cl.id_shop = 1 
AND cl.`id_category` = 99 LIMIT 1
0.118 ms 1 /classes/Category.php:1396
307
SELECT SQL_NO_CACHE cl.`link_rewrite`
FROM `tmohz_category_lang` cl
WHERE `id_lang` = 0
AND cl.id_shop = 1 
AND cl.`id_category` = 106 LIMIT 1
0.118 ms 0 /classes/Category.php:1396
47
SELECT SQL_NO_CACHE *
FROM `tmohz_group_lang`
WHERE `id_group` = 1
0.117 ms 6 /src/Adapter/EntityMapper.php:82
270
SELECT SQL_NO_CACHE cl.`link_rewrite`
FROM `tmohz_category_lang` cl
WHERE `id_lang` = 0
AND cl.id_shop = 1 
AND cl.`id_category` = 2 LIMIT 1
0.117 ms 0 /classes/Category.php:1396
138
SELECT SQL_NO_CACHE *
FROM `tmohz_state` a
WHERE (a.`id_state` = 398) LIMIT 1
0.116 ms 1 /src/Adapter/EntityMapper.php:74
169
SELECT SQL_NO_CACHE id_st_site_builder FROM tmohz_st_site_builder WHERE `code` = "AuE6iNra" LIMIT 1
0.116 ms 175 /modules/stsitebuilder/stsitebuilder.php:943
68
SELECT SQL_NO_CACHE `name`
FROM `tmohz_manufacturer`
WHERE `id_manufacturer` = 81
AND `active` = 1 LIMIT 1
0.115 ms 1 /classes/Manufacturer.php:306
277
SELECT SQL_NO_CACHE cl.`link_rewrite`
FROM `tmohz_category_lang` cl
WHERE `id_lang` = 2
AND cl.id_shop = 1 
AND cl.`id_category` = 2 LIMIT 1
0.115 ms 1 /classes/Category.php:1396
126
SELECT SQL_NO_CACHE cl.`link_rewrite`
FROM `tmohz_category_lang` cl
WHERE `id_lang` = 5
AND cl.id_shop = 1 
AND cl.`id_category` = 98 LIMIT 1
0.114 ms 1 /classes/Category.php:1396
90
SELECT SQL_NO_CACHE out_of_stock
FROM `tmohz_stock_available`
WHERE (id_product = 46320) AND (id_product_attribute = 0) AND (id_shop = 1) AND (id_shop_group = 0) LIMIT 1
0.113 ms 1 /classes/stock/StockAvailable.php:578
356
SELECT SQL_NO_CACHE `reduction`
FROM `tmohz_product_group_reduction_cache`
WHERE `id_product` = 13028 AND `id_group` = 1 LIMIT 1
0.113 ms 0 /classes/GroupReduction.php:146
298
SELECT SQL_NO_CACHE `reduction`
FROM `tmohz_product_group_reduction_cache`
WHERE `id_product` = 1601 AND `id_group` = 1 LIMIT 1
0.111 ms 0 /classes/GroupReduction.php:146
132
SELECT SQL_NO_CACHE format
FROM `tmohz_address_format`
WHERE `id_country` = 6 LIMIT 1
0.111 ms 1 /classes/AddressFormat.php:649
254
SELECT SQL_NO_CACHE `id_module` FROM `tmohz_module_shop` WHERE `id_module` = 78 AND `id_shop` = 1 LIMIT 1
0.111 ms 1 /classes/module/Module.php:2270
134
SELECT SQL_NO_CACHE `id_module` FROM `tmohz_module` WHERE `name` = "onepagecheckoutps" LIMIT 1
0.110 ms 1 /classes/module/Module.php:2781
26
SELECT SQL_NO_CACHE `id_module` FROM `tmohz_module` WHERE `name` = "amazonpay" LIMIT 1
0.109 ms 0 /classes/module/Module.php:2781
92
SELECT SQL_NO_CACHE cl.`link_rewrite`
FROM `tmohz_category_lang` cl
WHERE `id_lang` = 2
AND cl.id_shop = 1 
AND cl.`id_category` = 98 LIMIT 1
0.109 ms 1 /classes/Category.php:1396
374
SELECT SQL_NO_CACHE * FROM `tmohz_stock_fabrica` WHERE reference = "AEM-21-765C" LIMIT 1
0.109 ms 0 /modules/desoccstockerp/desoccstockerp.php:467
34
SELECT SQL_NO_CACHE `id_lang` FROM `tmohz_lang`
WHERE `locale` = 'en-us'
OR `language_code` = 'en-us' LIMIT 1
0.108 ms 6 /classes/Language.php:870
173
SELECT SQL_NO_CACHE `id_module` FROM `tmohz_module_shop` WHERE `id_module` = 6 AND `id_shop` = 1 LIMIT 1
0.108 ms 1 /classes/module/Module.php:2270
365
SELECT SQL_NO_CACHE `id_module` FROM `tmohz_module_shop` WHERE `id_module` = 85 AND `id_shop` = 1 LIMIT 1
0.108 ms 1 /classes/module/Module.php:2270
389
SELECT SQL_NO_CACHE c.`nleft`, c.`nright` FROM `tmohz_category` c
WHERE c.`id_category` = 2 LIMIT 1
0.108 ms 1 /classes/Category.php:1612
94
SELECT SQL_NO_CACHE id_shop
FROM `tmohz_product_shop`
WHERE `id_product` = 46320
AND id_shop = 1 LIMIT 1
0.107 ms 1 /classes/ObjectModel.php:1570
99
SELECT SQL_NO_CACHE id_shop
FROM `tmohz_category_shop`
WHERE `id_category` = 98
AND id_shop = 1 LIMIT 1
0.107 ms 1 /classes/ObjectModel.php:1570
379
SELECT SQL_NO_CACHE `id_module` FROM `tmohz_module` WHERE `name` = "ets_seo" LIMIT 1
0.107 ms 0 /classes/module/Module.php:2781
49
SELECT SQL_NO_CACHE * FROM `tmohz_hook_module_exceptions`
WHERE `id_shop` IN (1)
0.106 ms 1 /classes/module/Module.php:2171
364
SELECT SQL_NO_CACHE `id_module` FROM `tmohz_module` WHERE `name` = "desoccfeatures" LIMIT 1
0.106 ms 1 /classes/module/Module.php:2781
36
SELECT SQL_NO_CACHE c.id_currency
FROM `tmohz_currency` c
WHERE (iso_code = 'GBP') LIMIT 1
0.105 ms 1 /classes/Currency.php:893
310
SELECT SQL_NO_CACHE `reduction`
FROM `tmohz_product_group_reduction_cache`
WHERE `id_product` = 9480 AND `id_group` = 1 LIMIT 1
0.105 ms 0 /classes/GroupReduction.php:146
283
SELECT SQL_NO_CACHE cl.`link_rewrite`
FROM `tmohz_category_lang` cl
WHERE `id_lang` = 0
AND cl.id_shop = 1 
AND cl.`id_category` = 99 LIMIT 1
0.105 ms 0 /classes/Category.php:1396
139
SELECT SQL_NO_CACHE id_required_field, object_name, field_name
FROM tmohz_required_field
0.103 ms 1 /classes/ObjectModel.php:1437
91
SELECT SQL_NO_CACHE location
FROM `tmohz_stock_available`
WHERE (id_product = 46320) AND (id_product_attribute = 0) AND (id_shop = 1) AND (id_shop_group = 0) LIMIT 1
0.102 ms 1 /classes/stock/StockAvailable.php:606
128
SELECT SQL_NO_CACHE cl.`link_rewrite`
FROM `tmohz_category_lang` cl
WHERE `id_lang` = 6
AND cl.id_shop = 1 
AND cl.`id_category` = 98 LIMIT 1
0.102 ms 1 /classes/Category.php:1396
45
SELECT SQL_NO_CACHE id_shop
FROM `tmohz_currency_shop`
WHERE `id_currency` = 1
AND id_shop = 1 LIMIT 1
0.101 ms 1 /classes/ObjectModel.php:1570
244
SELECT SQL_NO_CACHE c.`nleft`, c.`nright` FROM `tmohz_category` c
WHERE c.`id_category` = 2 LIMIT 1
0.099 ms 1 /classes/Category.php:1612
40
SELECT SQL_NO_CACHE c.id_currency
FROM `tmohz_currency` c
WHERE (iso_code = 'USD') LIMIT 1
0.097 ms 1 /classes/Currency.php:893
64
SELECT SQL_NO_CACHE c.`nleft`, c.`nright` FROM `tmohz_category` c
WHERE c.`id_category` = 2 LIMIT 1
0.097 ms 1 /classes/Category.php:1612
81
SELECT SQL_NO_CACHE 1 FROM `tmohz_specific_price` WHERE `to` BETWEEN '2026-04-21 00:00:00' AND '2026-04-21 23:59:59' LIMIT 1
0.097 ms 1 /classes/SpecificPrice.php:388
377
SELECT SQL_NO_CACHE * FROM `tmohz_stock_fabrica` WHERE reference = "AEM-21-773C" LIMIT 1
0.096 ms 0 /modules/desoccstockerp/desoccstockerp.php:467
133
SELECT SQL_NO_CACHE `need_identification_number`
FROM `tmohz_country`
WHERE `id_country` = 6 LIMIT 1
0.095 ms 1 /classes/Country.php:406
60
SELECT SQL_NO_CACHE c.`nleft`, c.`nright` FROM `tmohz_category` c
WHERE c.`id_category` = 2 LIMIT 1
0.093 ms 1 /classes/Category.php:1612
286
SELECT SQL_NO_CACHE `reduction`
FROM `tmohz_product_group_reduction_cache`
WHERE `id_product` = 665 AND `id_group` = 1 LIMIT 1
0.093 ms 0 /classes/GroupReduction.php:146
86
SELECT SQL_NO_CACHE `reduction`
FROM `tmohz_product_group_reduction_cache`
WHERE `id_product` = 46320 AND `id_group` = 1 LIMIT 1
0.092 ms 0 /classes/GroupReduction.php:146
380
SELECT SQL_NO_CACHE `id_module` FROM `tmohz_module_shop` WHERE `id_module` = 0 AND `id_shop` = 1 LIMIT 1
0.092 ms 0 /classes/module/Module.php:2270
48
SELECT SQL_NO_CACHE id_shop
FROM `tmohz_group_shop`
WHERE `id_group` = 1
AND id_shop = 1 LIMIT 1
0.091 ms 1 /classes/ObjectModel.php:1570
38
SELECT SQL_NO_CACHE `id_lang` FROM `tmohz_lang`
WHERE `locale` = 'en-us'
OR `language_code` = 'en-us' LIMIT 1
0.091 ms 6 /classes/Language.php:870
42
SELECT SQL_NO_CACHE `id_lang` FROM `tmohz_lang`
WHERE `locale` = 'en-us'
OR `language_code` = 'en-us' LIMIT 1
0.088 ms 6 /classes/Language.php:870
69
SELECT SQL_NO_CACHE `name` FROM `tmohz_supplier` WHERE `id_supplier` = 34 LIMIT 1
0.087 ms 1 /classes/Supplier.php:240
39
SELECT SQL_NO_CACHE `id_lang` FROM `tmohz_lang`
WHERE `locale` = 'en-us'
OR `language_code` = 'en-us' LIMIT 1
0.085 ms 6 /classes/Language.php:870
87
SELECT SQL_NO_CACHE `reduction`
FROM `tmohz_group`
WHERE `id_group` = 1 LIMIT 1
0.085 ms 1 /classes/Group.php:151
35
SELECT SQL_NO_CACHE `id_lang` FROM `tmohz_lang`
WHERE `locale` = 'en-us'
OR `language_code` = 'en-us' LIMIT 1
0.084 ms 6 /classes/Language.php:870

Doubles

50 queries
SELECT *
FROM `tmohz_category` a
LEFT JOIN `tmohz_category_lang` `b` ON a.`id_category` = b.`id_category` AND b.`id_lang` = XX
LEFT JOIN `tmohz_category_shop` `c` ON a.`id_category` = c.`id_category` AND c.`id_shop` = XX
WHERE (a.`id_category` = XX) AND (b.`id_shop` = XX) LIMIT XX
15 queries
			SELECT cl.`link_rewrite`
			FROM `tmohz_category_lang` cl
			WHERE `id_lang` = XX
			 AND cl.id_shop = XX 
			AND cl.`id_category` = XX LIMIT XX
14 queries
SELECT *
FROM `tmohz_product` a
LEFT JOIN `tmohz_product_lang` `b` ON a.`id_product` = b.`id_product` AND b.`id_lang` = XX
LEFT JOIN `tmohz_product_shop` `c` ON a.`id_product` = c.`id_product` AND c.`id_shop` = XX
WHERE (a.`id_product` = XX) AND (b.`id_shop` = XX) LIMIT XX
10 queries
SELECT c.`name`, cl.`id_lang`, IF(cl.`id_lang` IS NULL, c.`value`, cl.`value`) AS value, c.id_shop_group, c.id_shop
               FROM `tmohz_configuration` c
               LEFT JOIN `tmohz_configuration_lang` cl ON (c.`id_configuration` = cl.`id_configuration`)
10 queries
        SELECT pa.id_product_attribute
        FROM `tmohz_product_attribute` pa INNER JOIN tmohz_product_attribute_shop product_attribute_shop
        ON (product_attribute_shop.id_product_attribute = pa.id_product_attribute AND product_attribute_shop.id_shop = XX)
        WHERE pa.`id_product` = XX
9 queries
SELECT *
FROM `tmohz_product` a
LEFT JOIN `tmohz_product_shop` `c` ON a.`id_product` = c.`id_product` AND c.`id_shop` = XX
WHERE (a.`id_product` = XX) LIMIT XX
9 queries
SELECT *
							FROM `tmohz_product_lang`
							WHERE `id_product` = XX AND `id_shop` = XX
9 queries
SELECT product_shop.`price`, product_shop.`ecotax`,
IFNULL(product_attribute_shop.id_product_attribute,XX) id_product_attribute, product_attribute_shop.`price` AS attribute_price, product_attribute_shop.default_on, product_attribute_shop.`ecotax` AS attribute_ecotax
FROM `tmohz_product` p
INNER JOIN `tmohz_product_shop` `product_shop` ON (product_shop.id_product=p.id_product AND product_shop.id_shop = XX)
LEFT JOIN `tmohz_product_attribute_shop` `product_attribute_shop` ON (product_attribute_shop.id_product = p.id_product AND product_attribute_shop.id_shop = XX)
WHERE (p.`id_product` = XX)
9 queries
			SELECT `reduction`
			FROM `tmohz_product_group_reduction_cache`
			WHERE `id_product` = XX AND `id_group` = XX LIMIT XX
9 queries
SELECT SUM(quantity)
FROM `tmohz_stock_available`
WHERE (id_product = XX) AND (id_product_attribute = XX) AND (id_shop = XX) AND (id_shop_group = XX) LIMIT XX
9 queries
                SELECT ctg.`id_group`
                FROM `tmohz_category_product` cp
                INNER JOIN `tmohz_category_group` ctg ON (ctg.`id_category` = cp.`id_category`)
                WHERE cp.`id_product` = XX AND ctg.`id_group` = XX LIMIT XX
9 queries
SELECT
            COALESCE(SUM(first_level_quantity) + SUM(pack_quantity), XX) as deep_quantity,
            COALESCE(SUM(first_level_quantity), XX) as quantity
          FROM (SELECT SUM(cp.`quantity`) as first_level_quantity, XX as pack_quantity
          FROM `tmohz_cart_product` cp
            WHERE cp.`id_product_attribute` = XX
              
            AND cp.`id_cart` = XX AND cp.`id_product` = XX UNION SELECT XX as first_level_quantity, SUM(cp.`quantity` * p.`quantity`) as pack_quantity
          FROM `tmohz_cart_product` cp JOIN `tmohz_pack` p ON cp.`id_product` = p.`id_product_pack` JOIN `tmohz_product` pr ON p.`id_product_pack` = pr.`id_product`
            WHERE cp.`id_product_attribute` = XX
              
            AND cp.`id_cart` = XX AND p.`id_product_item` = XX AND (pr.`pack_stock_type` IN (XX,XX) OR (
            pr.`pack_stock_type` = XX
            AND XX = XX
        ))) as q LIMIT XX
9 queries
            SELECT image_shop.`cover`, i.`id_image`, il.`legend`, i.`position`
            FROM `tmohz_image` i
             INNER JOIN tmohz_image_shop image_shop
        ON (image_shop.id_image = i.id_image AND image_shop.id_shop = XX)
            LEFT JOIN `tmohz_image_lang` il ON (i.`id_image` = il.`id_image` AND il.`id_lang` = XX)
            WHERE i.`id_product` = XX
            ORDER BY `position`
8 queries
SELECT quantity FROM `tmohz_stock_available`
            WHERE id_product = XX 
            AND id_product_attribute = XX LIMIT XX
8 queries
SELECT
                    p.*,
                    ps.*,
                    pl.*,
                    sa.out_of_stock,
                    IFNULL(sa.quantity, XX) as quantity,
                    (DATEDIFF(
                        p.`date_add`,
                        DATE_SUB(
                            'XX-XX-XX XX:XX:XX',
                            INTERVAL XX DAY
                        )
                    ) > XX) as new
                FROM tmohz_product p
                LEFT JOIN tmohz_product_lang pl
                    ON pl.id_product = p.id_product
                    AND pl.id_shop = XX
                    AND pl.id_lang = XX
                LEFT JOIN tmohz_stock_available sa   ON sa.id_product = p.id_product
                    AND sa.id_product_attribute = XX
			        AND sa.id_shop = XX LEFT JOIN tmohz_product_shop ps
			        ON ps.id_product = p.id_product
			        AND ps.id_shop = XX
                WHERE p.id_product IN (XX)
7 queries
SELECT `id_module` FROM `tmohz_module_shop` WHERE `id_module` = XX AND `id_shop` = XX LIMIT XX
6 queries
SELECT `id_lang` FROM `tmohz_lang`
                    WHERE `locale` = 'en-us'
                    OR `language_code` = 'en-us' LIMIT XX
6 queries
SELECT c.`nleft`, c.`nright`  FROM `tmohz_category` c
			LEFT JOIN `tmohz_category_lang` cl
				ON (c.`id_category` = cl.`id_category`
                    AND `id_lang` = XX AND cl.id_shop = XX ) WHERE c.`id_category` = XX LIMIT XX
6 queries
SELECT c.`nleft`, c.`nright` FROM `tmohz_category` c
            WHERE c.`id_category` = XX LIMIT XX
6 queries
SELECT c.*, cl.*  FROM `tmohz_category` c
			LEFT JOIN `tmohz_category_lang` cl
				ON (c.`id_category` = cl.`id_category`
                    AND `id_lang` = XX AND cl.id_shop = XX ) WHERE c.`nleft` <= XX AND c.`nright` >= XX AND c.`nleft` >= XX AND c.`nright` <= XX ORDER BY `nleft` DESC
5 queries
                SELECT m.`id_module`, m.`name`, ms.`id_module`as `mshop`
                FROM `tmohz_module` m
                LEFT JOIN `tmohz_module_shop` ms
                ON m.`id_module` = ms.`id_module`
                AND ms.`id_shop` = XX
5 queries
SELECT * FROM `tmohz_occ_supplier_orders`
                WHERE `id_product` = XX
                AND `active` = XX
                AND `expected_date` >= CURDATE()
                ORDER BY `expected_date` ASC
3 queries
SELECT *
FROM `tmohz_currency` a
LEFT JOIN `tmohz_currency_lang` `b` ON a.`id_currency` = b.`id_currency` AND b.`id_lang` = XX
LEFT JOIN `tmohz_currency_shop` `c` ON a.`id_currency` = c.`id_currency` AND c.`id_shop` = XX
WHERE (a.`id_currency` = XX) LIMIT XX
3 queries
SELECT *
FROM `tmohz_currency` a
LEFT JOIN `tmohz_currency_shop` `c` ON a.`id_currency` = c.`id_currency` AND c.`id_shop` = XX
WHERE (a.`id_currency` = XX) LIMIT XX
3 queries
SELECT *
							FROM `tmohz_currency_lang`
							WHERE `id_currency` = XX
3 queries
SELECT eb.*
FROM `tmohz_st_site_builder` eb
INNER JOIN `tmohz_st_site_builder_yuyan` `yy` ON yy.id_st_site_builder = eb.id_st_site_builder
 INNER JOIN tmohz_st_site_builder_shop st_site_builder_shop
        ON (st_site_builder_shop.id_st_site_builder = eb.id_st_site_builder AND st_site_builder_shop.id_shop = XX)
WHERE (eb.contr = "product") AND (eb.type =XX) AND (yy.id_lang = XX OR yy.id_lang =XX) AND (eb.post_status = "publish") AND (eb.post_parent = XX) AND (eb.post_type = "") AND (eb.active = XX) AND (((eb.id_manufacturer = XX AND eb.id_category = XX AND eb.id_product = "") OR (eb.id_manufacturer > XX AND eb.id_manufacturer=XX) OR (eb.id_category > XX AND eb.id_category IN(XX,XX,XX)) OR ( find_in_set('XX',eb.id_product))))
ORDER BY eb.priority DESC
LIMIT XX
3 queries
				SELECT tr.*
				FROM `tmohz_tax_rule` tr
				JOIN `tmohz_tax_rules_group` trg ON (tr.`id_tax_rules_group` = trg.`id_tax_rules_group`)
				WHERE trg.`active` = XX
				AND tr.`id_country` = XX
				AND tr.`id_tax_rules_group` = XX
				AND tr.`id_state` IN (XX, XX)
				AND ('XX' BETWEEN tr.`zipcode_from` AND tr.`zipcode_to`
					OR (tr.`zipcode_to` = XX AND tr.`zipcode_from` IN(XX, 'XX')))
				ORDER BY tr.`zipcode_from` DESC, tr.`zipcode_to` DESC, tr.`id_state` DESC, tr.`id_country` DESC
3 queries
			SELECT *
			FROM `tmohz_category` c
			 INNER JOIN tmohz_category_shop category_shop
        ON (category_shop.id_category = c.id_category AND category_shop.id_shop = XX)
			LEFT JOIN `tmohz_category_lang` cl ON c.`id_category` = cl.`id_category` AND cl.id_shop = XX 
			WHERE XX  and c.id_category IN (XX,XX,XX)  AND `id_lang` = XX
			AND `active` = XX
			
			ORDER BY c.`level_depth` ASC, category_shop.`position` ASC
			
2 queries
SELECT *
FROM `tmohz_country` a
LEFT JOIN `tmohz_country_lang` `b` ON a.`id_country` = b.`id_country` AND b.`id_lang` = XX
LEFT JOIN `tmohz_country_shop` `c` ON a.`id_country` = c.`id_country` AND c.`id_shop` = XX
WHERE (a.`id_country` = XX) LIMIT XX
2 queries
SELECT *
FROM `tmohz_lang` a
LEFT JOIN `tmohz_lang_shop` `c` ON a.`id_lang` = c.`id_lang` AND c.`id_shop` = XX
WHERE (a.`id_lang` = XX) LIMIT XX
2 queries
				SELECT id_shop
				FROM `tmohz_lang_shop`
				WHERE `id_lang` = XX
				AND id_shop = XX LIMIT XX
2 queries
SELECT count(XX) FROM `tmohz_st_site_builder` sb INNER JOIN `tmohz_st_site_builder_shop` sbs ON sb.`id_st_site_builder`=sbs.`id_st_site_builder` WHERE sb.`id_st_site_builder`=XX AND sbs.`id_shop`=XX AND sb.`active`=XX LIMIT XX
2 queries
SELECT eb.*
FROM `tmohz_st_site_builder` eb
INNER JOIN `tmohz_st_site_builder_yuyan` `yy` ON yy.id_st_site_builder = eb.id_st_site_builder
 INNER JOIN tmohz_st_site_builder_shop st_site_builder_shop
        ON (st_site_builder_shop.id_st_site_builder = eb.id_st_site_builder AND st_site_builder_shop.id_shop = XX)
WHERE (eb.`post_parent` = XX AND eb.`post_type`='' AND eb.post_status = "publish" AND eb.`type` in (XX) And eb.`id_st_site_builder`=XX AND eb.`active` = XX AND (yy.`id_lang`=XX OR yy.`id_lang`=XX))
ORDER BY  eb.`position` asc, eb.`id_st_site_builder` desc
2 queries
			SELECT *
			FROM `tmohz_category` c
			 INNER JOIN tmohz_category_shop category_shop
        ON (category_shop.id_category = c.id_category AND category_shop.id_shop = XX)
			LEFT JOIN `tmohz_category_lang` cl ON c.`id_category` = cl.`id_category` AND cl.id_shop = XX 
			WHERE XX  and c.id_category IN (XX,XX)  AND `id_lang` = XX
			AND `active` = XX
			
			ORDER BY c.`level_depth` ASC, category_shop.`position` ASC
			
2 queries
			SELECT *
			FROM `tmohz_category` c
			 INNER JOIN tmohz_category_shop category_shop
        ON (category_shop.id_category = c.id_category AND category_shop.id_shop = XX)
			LEFT JOIN `tmohz_category_lang` cl ON c.`id_category` = cl.`id_category` AND cl.id_shop = XX 
			WHERE XX  and c.id_category IN (XX)  AND `id_lang` = XX
			AND `active` = XX
			
			ORDER BY c.`level_depth` ASC, category_shop.`position` ASC
			
2 queries
SELECT * FROM tmohz_filter_category fc, tmohz_filter_category_lang fcl WHERE fc.id_category=fcl.id_category and fcl.id_lang=XX and id_parent=XX ORDER by fcl.name
2 queries
SELECT * FROM tmohz_llantassearch_category c WHERE id_parent=XX ORDER BY name
2 queries
SELECT * FROM `tmohz_stock_fabrica` WHERE reference = "SXXRMRGR" LIMIT XX
2 queries
SELECT * FROM `tmohz_stock_fabrica` WHERE reference = "RCXX" LIMIT XX
2 queries
SELECT * FROM `tmohz_stock_fabrica` WHERE reference = "AEM-XX-XXC" LIMIT XX

Tables stress

97 category_lang
87 category
66 category_shop
55 product
47 product_shop
33 product_lang
30 stock_available
24 product_attribute_shop
22 cart_product
18 module
16 st_site_builder
14 module_shop
14 st_site_builder_shop
13 product_attribute
12 currency
12 st_site_builder_yuyan
12 category_product
12 category_group
11 configuration
11 lang
11 pack
11 image_shop
11 image_lang
10 configuration_lang
9 currency_shop
9 product_group_reduction_cache
9 image
7 hook
6 lang_shop
6 currency_lang
6 specific_price
6 image_type
6 stock_fabrica
5 shop
5 occ_supplier_orders
4 shop_url
4 country
4 manufacturer
3 country_lang
3 country_shop
3 hook_alias
3 tax_rule
3 tax_rules_group
2 shop_group
2 hook_module
2 group
2 group_shop
2 attribute
2 attribute_lang
2 attribute_group_lang
2 product_attribute_combination
2 attribute_shop
2 st_site_builder_postmeta
2 filter_category
2 llantassearch_category
1 module_group
1 customer
1 customer_group
1 meta
1 meta_lang
1 group_lang
1 hook_module_exceptions
1 supplier
1 tax
1 tax_lang
1 specific_price_priority
1 tag
1 product_tag
1 manufacturer_lang
1 manufacturer_shop
1 accessory
1 product_attribute_lang
1 attribute_group
1 address_format
1 state
1 required_field
1 gender
1 gender_lang
1 feature_product
1 feature_lang
1 feature_value
1 feature_value_lang
1 feature
1 feature_shop
1 searchcustom_fitment
1 product_sale
1 connections

ObjectModel instances

Name Instances Source
Category 122 /modules/stsitebuilder/classes/DB/StSiteBuilderClass.php:586 (__construct) [id: 98]
/modules/stsitebuilder/classes/DB/StSiteBuilderClass.php:595 (getParentsCategories) [id: 2]
/modules/stsitebuilder/classes/DB/StSiteBuilderClass.php:586 (__construct) [id: 98]
/modules/stsitebuilder/classes/DB/StSiteBuilderClass.php:595 (getParentsCategories) [id: 2]
/controllers/front/ProductController.php:308 (__construct) [id: 98]
/controllers/front/ProductController.php:1334 (__construct) [id: 98]
/classes/PrestaShopCollection.php:383 (hydrateCollection) [id: ]
/classes/PrestaShopCollection.php:383 (hydrateCollection) [id: ]
/classes/PrestaShopCollection.php:383 (hydrateCollection) [id: ]
/modules/stsitebuilder/classes/DB/StSiteBuilderClass.php:586 (__construct) [id: 98]
/modules/stsitebuilder/classes/DB/StSiteBuilderClass.php:595 (getParentsCategories) [id: 2]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 57]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 58]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 59]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 60]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 61]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 62]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 63]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 63]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 65]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 66]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 67]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 68]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 69]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 70]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 57]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 58]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 59]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 60]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 61]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 62]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 63]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 63]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 65]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 66]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 67]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 68]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 69]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 70]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 34]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 35]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 34]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 35]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 121]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 122]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 123]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 124]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 125]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 121]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 122]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 123]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 124]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 125]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 34]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 35]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 34]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 35]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 136]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 137]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 138]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 136]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 137]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 138]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 153]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 154]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 155]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 153]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 154]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 155]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 143]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 144]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 145]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 146]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 147]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 148]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 149]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 150]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 151]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 143]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 144]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 145]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 146]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 147]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 148]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 149]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 150]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 151]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 157]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 158]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 159]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 157]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 158]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 159]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 162]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 162]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 167]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 167]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 170]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 171]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 172]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 173]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 174]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 175]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1048 (__construct) [id: 176]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 170]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 171]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 172]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 173]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 174]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 175]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:1085 (__construct) [id: 176]
/modules/stsitebuilder/classes/DB/StSiteBuilderClass.php:586 (__construct) [id: 98]
/modules/stsitebuilder/classes/DB/StSiteBuilderClass.php:595 (getParentsCategories) [id: 2]
/classes/Link.php:1547 (__construct) [id: 134]
/modules/des_categorytree/des_categorytree.php:408 (__construct) [id: 2]
/modules/des_categorytree/des_categorytree.php:339 (__construct) [id: 98]
/modules/des_categorytree/des_categorytree.php:401 (getParentsCategories) [id: 2]
/classes/Link.php:1547 (__construct) [id: 98]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:115 (__construct) [id: 2]
/classes/Link.php:1547 (__construct) [id: 134]
/modules/rcpgtagmanager/src/PSModule/DataModelHandler/ModelBuilder/Category/AbstractCategoryModelBuilder.php:39 (__construct) [id: 98]
/modules/rcpgtagmanager/src/PSModule/DataModelHandler/ModelBuilder/Category/AbstractCategoryModelBuilder.php:56 (getParentsCategories) [id: 2]
Product 41 /modules/stsitebuilder/classes/DB/StSiteBuilderClass.php:578 (__construct) [id: 46320]
/modules/stsitebuilder/classes/DB/StSiteBuilderClass.php:578 (__construct) [id: 46320]
/controllers/front/ProductController.php:149 (__construct) [id: 46320]
/src/Adapter/Image/ImageRetriever.php:68 (__construct) [id: 46320]
/classes/Meta.php:340 (__construct) [id: 46320]
/classes/Link.php:114 (__construct) [id: 46320]
/classes/Link.php:114 (__construct) [id: 46320]
/classes/Link.php:114 (__construct) [id: 46320]
/classes/Link.php:114 (__construct) [id: 46320]
/classes/Link.php:114 (__construct) [id: 46320]
/classes/Link.php:114 (__construct) [id: 46320]
/modules/stsitebuilder/classes/DB/StSiteBuilderClass.php:578 (__construct) [id: 46320]
/classes/Link.php:114 (__construct) [id: 46320]
/classes/Link.php:114 (__construct) [id: 46320]
/classes/Link.php:114 (__construct) [id: 46320]
/classes/Link.php:114 (__construct) [id: 46320]
/classes/Link.php:114 (__construct) [id: 46320]
/classes/Link.php:114 (__construct) [id: 46320]
/classes/Link.php:114 (__construct) [id: 46320]
/classes/Link.php:114 (__construct) [id: 46320]
/classes/Link.php:114 (__construct) [id: 46320]
/modules/stsitebuilder/classes/DB/StSiteBuilderClass.php:578 (__construct) [id: 46320]
/modules/des_categorytree/des_categorytree.php:331 (__construct) [id: 46320]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:708 (__construct) [id: 21]
/src/Adapter/Image/ImageRetriever.php:68 (__construct) [id: 21]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:708 (__construct) [id: 665]
/src/Adapter/Image/ImageRetriever.php:68 (__construct) [id: 665]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:708 (__construct) [id: 1601]
/src/Adapter/Image/ImageRetriever.php:68 (__construct) [id: 1601]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:708 (__construct) [id: 9480]
/src/Adapter/Image/ImageRetriever.php:68 (__construct) [id: 9480]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:708 (__construct) [id: 11413]
/src/Adapter/Image/ImageRetriever.php:68 (__construct) [id: 11413]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:708 (__construct) [id: 11716]
/src/Adapter/Image/ImageRetriever.php:68 (__construct) [id: 11716]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:708 (__construct) [id: 13027]
/src/Adapter/Image/ImageRetriever.php:68 (__construct) [id: 13027]
/modules/stsitebuilder/classes/SiteBuilderProductBase.php:708 (__construct) [id: 13028]
/src/Adapter/Image/ImageRetriever.php:68 (__construct) [id: 13028]
/classes/Link.php:114 (__construct) [id: 21]
/modules/rcpgtagmanager/src/PSModule/DataModelHandler/ModelBuilder/Product/AbstractProductModelBuilder.php:51 (__construct) [id: 46320]
Currency 6 /src/Adapter/Currency/CurrencyDataProvider.php:101 (__construct) [id: 1]
/src/Adapter/Currency/CurrencyDataProvider.php:101 (__construct) [id: 3]
/src/Adapter/Currency/CurrencyDataProvider.php:101 (__construct) [id: 2]
/classes/Tools.php:708 (getCurrencyInstance) [id: 1]
/modules/ps_currencyselector/ps_currencyselector.php:112 (getCurrencies) [id: 3]
/modules/ps_currencyselector/ps_currencyselector.php:112 (getCurrencies) [id: 2]
Address 6 /classes/Product.php:723 (__construct) [id: ]
/classes/Product.php:6595 (initialize) [id: ]
/classes/Product.php:3573 (__construct) [id: ]
/controllers/front/ProductController.php:555 (__construct) [id: 0]
/classes/Product.php:5723 (__construct) [id: ]
/classes/shop/Shop.php:487 (__construct) [id: ]
Manufacturer 4 /controllers/front/ProductController.php:856 (__construct) [id: 81]
/src/Adapter/Presenter/Manufacturer/ManufacturerLazyArray.php:98 (__construct) [id: 81]
/classes/Link.php:669 (__construct) [id: 81]
/classes/Link.php:1567 (__construct) [id: 81]
Country 4 /config/config.inc.php:154 (__construct) [id: 6]
/classes/AddressFormat.php:402 (__construct) [id: 6]
/classes/controller/FrontController.php:1739 (__construct) [id: 6]
/modules/paypal/paypal.php:363 (__construct) [id: 6]
Gender 3 /classes/controller/FrontController.php:1656 (__construct) [id: 0]
/classes/PrestaShopCollection.php:383 (hydrateCollection) [id: ]
/classes/PrestaShopCollection.php:383 (hydrateCollection) [id: ]
Language 3 /config/config.inc.php:219 (__construct) [id: 1]
/classes/Tools.php:659 (__construct) [id: 2]
/classes/Tools.php:553 (__construct) [id: 2]
Tax 2 /classes/tax/TaxRulesTaxManager.php:113 (__construct) [id: 1]
/classes/tax/TaxRulesTaxManager.php:113 (__construct) [id: 1]
Shop 2 /config/config.inc.php:122 (initialize) [id: 1]
/modules/ybc_blog/classes/ybc_blog_link_class.php:44 (__construct) [id: 1]
StSiteBuilderClass 1 /modules/stsitebuilder/classes/SiteBuilderBase.php:55 (__construct) [id: ]
Group 1 /classes/Cart.php:275 (getCurrent) [id: 1]
Cart 1 /classes/controller/FrontController.php:459 (__construct) [id: ]
Customer 1 /config/config.inc.php:272 (__construct) [id: ]
ShopGroup 1 /classes/shop/Shop.php:562 (__construct) [id: 1]
Risk 1 /classes/controller/FrontController.php:1659 (__construct) [id: ]
AddressFormat 1 /classes/controller/FrontController.php:1733 (generateAddress) [id: ]
State 1 /classes/controller/FrontController.php:1738 (__construct) [id: 398]
StSiteBuilderPostmetaClass 1 /modules/stsitebuilder/classes/SiteBuilderBase.php:70 (__construct) [id: ]
ConnectionsSource 1 /modules/statsdata/statsdata.php:119 (logHttpReferer) [id: ]

Included Files

# Filename
0 /index.php
1 /config/config.inc.php
2 /config/defines.inc.php
3 /config/autoload.php
4 /vendor/autoload.php
5 /vendor/composer/autoload_real.php
6 /vendor/composer/platform_check.php
7 /vendor/composer/ClassLoader.php
8 /vendor/composer/autoload_static.php
9 /vendor/symfony/deprecation-contracts/function.php
10 /vendor/symfony/polyfill-mbstring/bootstrap.php
11 /vendor/symfony/polyfill-mbstring/bootstrap80.php
12 /vendor/symfony/polyfill-ctype/bootstrap.php
13 /vendor/symfony/polyfill-ctype/bootstrap80.php
14 /vendor/symfony/polyfill-php83/bootstrap.php
15 /vendor/symfony/var-dumper/Resources/functions/dump.php
16 /vendor/symfony/polyfill-intl-normalizer/bootstrap.php
17 /vendor/symfony/polyfill-intl-normalizer/bootstrap80.php
18 /vendor/twig/twig/src/Resources/core.php
19 /vendor/twig/twig/src/Resources/debug.php
20 /vendor/twig/twig/src/Resources/escaper.php
21 /vendor/twig/twig/src/Resources/string_loader.php
22 /vendor/symfony/polyfill-intl-grapheme/bootstrap.php
23 /vendor/symfony/polyfill-intl-grapheme/bootstrap80.php
24 /vendor/symfony/string/Resources/functions.php
25 /vendor/symfony/polyfill-intl-idn/bootstrap.php
26 /vendor/symfony/clock/Resources/now.php
27 /vendor/symfony/polyfill-php80/bootstrap.php
28 /vendor/ezyang/htmlpurifier/library/HTMLPurifier.composer.php
29 /vendor/jakeasmith/http_build_url/src/http_build_url.php
30 /vendor/symfony/polyfill-intl-icu/bootstrap.php
31 /vendor/ircmaxell/password-compat/lib/password.php
32 /vendor/martinlindhe/php-mb-helpers/src/mb_helpers.php
33 /vendor/symfony/polyfill-php73/bootstrap.php
34 /vendor/symfony/translation/Resources/functions.php
35 /src/Core/Version.php
36 /config/alias.php
37 /vendor/prestashop/autoload/src/PrestashopAutoload.php
38 /vendor/prestashop/autoload/src/LegacyClassLoader.php
39 /vendor/symfony/filesystem/Filesystem.php
40 /vendor/prestashop/autoload/src/Autoloader.php
41 /config/bootstrap.php
42 /src/Core/ContainerBuilder.php
43 /src/Core/Foundation/IoC/Container.php
44 /src/Adapter/ServiceLocator.php
45 /var/cache/prod/appParameters.php
48 /var/cache/prod/class_index.php
49 /classes/controller/Controller.php
51 /classes/ObjectModel.php
52 /src/Core/Foundation/Database/EntityInterface.php
54 /classes/db/Db.php
56 /classes/Hook.php
58 /classes/module/Module.php
59 /src/Core/Module/Legacy/ModuleInterface.php
61 /classes/Tools.php
62 /classes/Context.php
63 /classes/shop/Shop.php
64 /src/Core/Security/PasswordGenerator.php
65 /classes/db/DbPDO.php
66 /override/classes/AddressFormat.php
67 /classes/AddressFormat.php
68 /classes/Configuration.php
69 /src/Core/Domain/Shop/ValueObject/ShopConstraint.php
70 /override/classes/Validate.php
71 /classes/Validate.php
72 /src/PrestaShopBundle/Form/Admin/Type/FormattedTextareaType.php
73 /src/PrestaShopBundle/Form/Admin/Type/TranslatorAwareType.php
74 /src/PrestaShopBundle/Form/Admin/Type/CommonAbstractType.php
75 /vendor/symfony/form/AbstractType.php
76 /vendor/symfony/form/FormTypeInterface.php
77 /classes/cache/Cache.php
78 /src/Adapter/EntityMapper.php
79 /classes/db/DbQuery.php
80 /src/Core/Addon/Theme/ThemeManagerBuilder.php
81 /vendor/psr/log/src/NullLogger.php
82 /vendor/psr/log/src/AbstractLogger.php
83 /vendor/psr/log/src/LoggerTrait.php
84 /vendor/psr/log/src/LoggerInterface.php
85 /src/Core/Context/ApiClientContext.php
86 /src/Adapter/Configuration.php
87 /vendor/symfony/http-foundation/ParameterBag.php
88 /src/Core/Domain/Configuration/ShopConfigurationInterface.php
89 /src/Core/ConfigurationInterface.php
90 /src/Core/Addon/Theme/ThemeRepository.php
91 /src/Core/Addon/AddonRepositoryInterface.php
92 /src/Core/Addon/Theme/Theme.php
93 /src/Core/Addon/AddonInterface.php
94 /src/Core/Util/File/YamlParser.php
95 /vendor/symfony/config/ConfigCache.php
96 /vendor/symfony/config/ResourceCheckerConfigCache.php
97 /vendor/symfony/config/ConfigCacheInterface.php
98 /vendor/symfony/config/Resource/SelfCheckingResourceChecker.php
99 /vendor/symfony/config/ResourceCheckerInterface.php
100 /vendor/symfony/config/Resource/FileResource.php
101 /vendor/symfony/config/Resource/SelfCheckingResourceInterface.php
102 /vendor/symfony/config/Resource/ResourceInterface.php
103 /var/cache/prod/yaml/a23d99fd1f0aa85877c4ae704133234a.php
104 /src/Core/Util/ArrayFinder.php
105 /vendor/symfony/property-access/PropertyAccess.php
106 /vendor/symfony/property-access/PropertyAccessorBuilder.php
107 /vendor/symfony/property-access/PropertyAccessor.php
108 /vendor/symfony/property-access/PropertyAccessorInterface.php
109 /vendor/symfony/property-info/Extractor/ReflectionExtractor.php
110 /vendor/symfony/property-info/PropertyListExtractorInterface.php
111 /vendor/symfony/property-info/PropertyTypeExtractorInterface.php
112 /vendor/symfony/property-info/PropertyAccessExtractorInterface.php
113 /vendor/symfony/property-info/PropertyInitializableExtractorInterface.php
114 /vendor/symfony/property-info/PropertyReadInfoExtractorInterface.php
115 /vendor/symfony/property-info/PropertyWriteInfoExtractorInterface.php
116 /vendor/symfony/property-info/Extractor/ConstructorArgumentTypeExtractorInterface.php
117 /vendor/symfony/property-info/Type.php
118 /vendor/symfony/string/Inflector/EnglishInflector.php
119 /vendor/symfony/string/Inflector/InflectorInterface.php
120 /vendor/symfony/property-access/PropertyPath.php
121 /vendor/symfony/property-access/PropertyPathInterface.php
122 /vendor/symfony/property-access/PropertyPathIteratorInterface.php
123 /config/defines_uri.inc.php
124 /classes/Language.php
125 /src/Core/Language/LanguageInterface.php
126 /classes/Country.php
127 /classes/PrestaShopCollection.php
128 /classes/shop/ShopGroup.php
129 /classes/Cookie.php
130 /src/Core/Http/CookieOptions.php
131 /classes/PhpEncryption.php
132 /classes/PhpEncryptionEngine.php
133 /vendor/defuse/php-encryption/src/Key.php
134 /vendor/defuse/php-encryption/src/Encoding.php
135 /vendor/defuse/php-encryption/src/Core.php
136 /vendor/defuse/php-encryption/src/Crypto.php
137 /vendor/defuse/php-encryption/src/KeyOrPassword.php
138 /vendor/defuse/php-encryption/src/RuntimeTests.php
139 /vendor/defuse/php-encryption/src/DerivedKeys.php
140 /vendor/defuse/php-encryption/src/Exception/WrongKeyOrModifiedCiphertextException.php
141 /vendor/defuse/php-encryption/src/Exception/CryptoException.php
142 /src/Core/Session/SessionHandler.php
143 /src/Core/Session/SessionHandlerInterface.php
144 /vendor/symfony/http-foundation/Session/Session.php
145 /vendor/symfony/http-foundation/Session/Attribute/AttributeBag.php
146 /vendor/symfony/http-foundation/Session/Attribute/AttributeBagInterface.php
147 /vendor/symfony/http-foundation/Session/SessionBagInterface.php
148 /vendor/symfony/http-foundation/Session/Flash/FlashBag.php
149 /vendor/symfony/http-foundation/Session/Flash/FlashBagInterface.php
150 /vendor/symfony/http-foundation/Session/SessionBagProxy.php
151 /vendor/symfony/http-foundation/Session/FlashBagAwareSessionInterface.php
152 /vendor/symfony/http-foundation/Session/SessionInterface.php
153 /vendor/symfony/http-foundation/Session/Storage/PhpBridgeSessionStorage.php
154 /vendor/symfony/http-foundation/Session/Storage/NativeSessionStorage.php
155 /vendor/symfony/http-foundation/Session/Storage/MetadataBag.php
156 /vendor/symfony/http-foundation/Session/Storage/Handler/StrictSessionHandler.php
157 /vendor/symfony/http-foundation/Session/Storage/Handler/AbstractSessionHandler.php
158 /vendor/symfony/http-foundation/Session/Storage/Proxy/SessionHandlerProxy.php
159 /vendor/symfony/http-foundation/Session/Storage/Proxy/AbstractProxy.php
160 /vendor/symfony/http-foundation/Session/Storage/SessionStorageInterface.php
161 /config/smarty.config.inc.php
162 /vendor/smarty/smarty/libs/Smarty.class.php
163 /vendor/smarty/smarty/libs/functions.php
164 /vendor/smarty/smarty/libs/Autoloader.php
165 /vendor/smarty/smarty/libs/sysplugins/smarty_internal_data.php
166 /vendor/smarty/smarty/libs/sysplugins/smarty_internal_extension_handler.php
167 /vendor/smarty/smarty/libs/sysplugins/smarty_internal_templatebase.php
168 /vendor/smarty/smarty/libs/sysplugins/smarty_internal_template.php
169 /vendor/smarty/smarty/libs/sysplugins/smarty_resource.php
170 /vendor/smarty/smarty/libs/sysplugins/smarty_variable.php
171 /vendor/smarty/smarty/libs/sysplugins/smarty_template_source.php
172 /vendor/smarty/smarty/libs/sysplugins/smarty_template_resource_base.php
173 /vendor/smarty/smarty/libs/sysplugins/smarty_internal_resource_file.php
174 /vendor/smarty/smarty/libs/sysplugins/smarty_internal_method_registerclass.php
175 /classes/ImageManager.php
176 /classes/Product.php
177 /classes/Profile.php
178 /classes/Tab.php
179 /config/smartyfront.config.inc.php
180 /classes/Smarty/SmartyResourceModule.php
181 /vendor/smarty/smarty/libs/sysplugins/smarty_resource_custom.php
182 /vendor/smarty/smarty/libs/sysplugins/smarty_internal_method_registerresource.php
183 /classes/Smarty/SmartyResourceParent.php
184 /classes/Smarty/SmartyLazyRegister.php
185 /vendor/smarty/smarty/libs/sysplugins/smarty_internal_method_registerplugin.php
186 /vendor/smarty/smarty/libs/plugins/modifier.truncate.php
187 /classes/Customer.php
188 /classes/Group.php
189 /override/classes/Link.php
190 /classes/Link.php
191 /classes/shop/ShopUrl.php
192 /app/FrontKernel.php
193 /app/AppKernel.php
194 /vendor/symfony/http-kernel/Kernel.php
195 /vendor/symfony/http-kernel/KernelInterface.php
196 /vendor/symfony/http-kernel/HttpKernelInterface.php
197 /vendor/symfony/http-kernel/RebootableInterface.php
198 /vendor/symfony/http-kernel/TerminableInterface.php
199 /vendor/symfony/dotenv/Dotenv.php
200 /classes/Dispatcher.php
201 /vendor/symfony/http-foundation/Request.php
202 /vendor/symfony/http-foundation/AcceptHeader.php
203 /vendor/symfony/http-foundation/AcceptHeaderItem.php
204 /vendor/symfony/http-foundation/FileBag.php
205 /vendor/symfony/http-foundation/HeaderBag.php
206 /vendor/symfony/http-foundation/HeaderUtils.php
207 /vendor/symfony/http-foundation/InputBag.php
208 /vendor/symfony/http-foundation/ServerBag.php
209 /src/Adapter/SymfonyContainer.php
210 /config/db_slave_server.inc.php
211 /src/Adapter/ContainerBuilder.php
212 /src/Adapter/Environment.php
213 /src/Core/EnvironmentInterface.php
214 /vendor/doctrine/cache/lib/Doctrine/Common/Cache/Psr6/DoctrineProvider.php
215 /vendor/doctrine/cache/lib/Doctrine/Common/Cache/CacheProvider.php
216 /vendor/doctrine/cache/lib/Doctrine/Common/Cache/Cache.php
217 /vendor/doctrine/cache/lib/Doctrine/Common/Cache/FlushableCache.php
218 /vendor/doctrine/cache/lib/Doctrine/Common/Cache/ClearableCache.php
219 /vendor/doctrine/cache/lib/Doctrine/Common/Cache/MultiOperationCache.php
220 /vendor/doctrine/cache/lib/Doctrine/Common/Cache/MultiGetCache.php
221 /vendor/doctrine/cache/lib/Doctrine/Common/Cache/MultiDeleteCache.php
222 /vendor/doctrine/cache/lib/Doctrine/Common/Cache/MultiPutCache.php
223 /vendor/symfony/cache/Adapter/ArrayAdapter.php
224 /vendor/psr/log/src/LoggerAwareTrait.php
225 /vendor/symfony/cache/Adapter/AdapterInterface.php
226 /vendor/symfony/cache/CacheItem.php
227 /vendor/symfony/cache-contracts/ItemInterface.php
228 /vendor/psr/cache/src/CacheItemInterface.php
229 /vendor/psr/cache/src/CacheItemPoolInterface.php
230 /vendor/symfony/cache-contracts/CacheInterface.php
231 /vendor/psr/log/src/LoggerAwareInterface.php
232 /vendor/symfony/cache/ResettableInterface.php
233 /vendor/symfony/service-contracts/ResetInterface.php
234 /vendor/doctrine/orm/src/Tools/Setup.php
235 /vendor/doctrine/deprecations/src/Deprecation.php
236 /vendor/doctrine/orm/src/Configuration.php
237 /vendor/doctrine/dbal/src/Configuration.php
238 /vendor/doctrine/cache/lib/Doctrine/Common/Cache/Psr6/CacheAdapter.php
239 /vendor/doctrine/annotations/lib/Doctrine/Common/Annotations/AnnotationReader.php
240 /vendor/doctrine/annotations/lib/Doctrine/Common/Annotations/Reader.php
241 /vendor/doctrine/annotations/lib/Doctrine/Common/Annotations/SimpleAnnotationReader.php
242 /vendor/doctrine/annotations/lib/Doctrine/Common/Annotations/DocParser.php
243 /vendor/doctrine/annotations/lib/Doctrine/Common/Annotations/DocLexer.php
244 /vendor/doctrine/lexer/src/AbstractLexer.php
245 /vendor/doctrine/annotations/lib/Doctrine/Common/Annotations/Annotation/Target.php
246 /vendor/doctrine/orm/src/Mapping/Driver/AnnotationDriver.php
247 /vendor/doctrine/orm/src/Mapping/Driver/CompatibilityAnnotationDriver.php
248 /vendor/doctrine/persistence/src/Persistence/Mapping/Driver/MappingDriver.php
249 /vendor/doctrine/persistence/src/Persistence/Mapping/Driver/ColocatedMappingDriver.php
250 /vendor/doctrine/orm/src/Mapping/Driver/ReflectionBasedDriver.php
251 /vendor/symfony/cache/Adapter/FilesystemAdapter.php
252 /vendor/symfony/cache/Adapter/AbstractAdapter.php
253 /vendor/symfony/cache/Traits/AbstractAdapterTrait.php
254 /vendor/symfony/cache/Traits/ContractsTrait.php
255 /vendor/symfony/cache-contracts/CacheTrait.php
256 /vendor/psr/cache/src/InvalidArgumentException.php
257 /vendor/psr/cache/src/CacheException.php
258 /vendor/symfony/cache/Traits/FilesystemTrait.php
259 /vendor/symfony/cache/Traits/FilesystemCommonTrait.php
260 /vendor/symfony/cache/PruneableInterface.php
261 /vendor/symfony/cache/Marshaller/DefaultMarshaller.php
262 /vendor/symfony/cache/Marshaller/MarshallerInterface.php
263 /src/Adapter/Module/Repository/CachedModuleRepository.php
264 /src/Adapter/Module/Repository/ModuleRepository.php
265 /src/Core/Repository/AbstractObjectModelRepository.php
266 /vendor/symfony/cache/LockRegistry.php
267 /modules/desfinder/vendor/autoload.php
268 /modules/desfinder/vendor/composer/autoload_real.php
269 /modules/desfinder/vendor/composer/platform_check.php
270 /modules/desfinder/vendor/composer/autoload_static.php
271 /modules/desfinder/vendor/symfony/polyfill-php81/bootstrap.php
272 /modules/desfinder/vendor/symfony/polyfill-php82/bootstrap.php
273 /modules/desfinder/vendor/open-telemetry/context/fiber/initialize_fiber_handler.php
274 /modules/desfinder/vendor/open-telemetry/context/ZendObserverFiber.php
275 /modules/desfinder/vendor/open-telemetry/context/Context.php
276 /modules/desfinder/vendor/open-telemetry/context/ContextInterface.php
277 /modules/desfinder/vendor/open-telemetry/context/FiberBoundContextStorage.php
278 /modules/desfinder/vendor/open-telemetry/context/ContextStorageInterface.php
279 /modules/desfinder/vendor/open-telemetry/context/ExecutionContextAwareInterface.php
280 /modules/desfinder/vendor/open-telemetry/context/ContextStorage.php
281 /modules/desfinder/vendor/open-telemetry/context/ContextStorageHead.php
282 /modules/desfinder/vendor/ralouphie/getallheaders/src/getallheaders.php
283 /modules/desfinder/vendor/open-telemetry/api/Trace/functions.php
284 /modules/desfinder/vendor/guzzlehttp/guzzle/src/functions_include.php
285 /modules/desfinder/vendor/guzzlehttp/guzzle/src/functions.php
286 /modules/ps_accounts/vendor/autoload.php
287 /modules/ps_accounts/vendor/composer/autoload_real.php
288 /modules/ps_accounts/vendor/composer/platform_check.php
289 /modules/ps_accounts/vendor/composer/autoload_static.php
290 /modules/ps_accounts/vendor/paragonie/random_compat/lib/random.php
291 /modules/ps_accounts/vendor/symfony/polyfill-ctype/bootstrap.php
292 /modules/ps_accounts/vendor/lcobucci/jwt/compat/class-aliases.php
293 /modules/ps_accounts/vendor/lcobucci/jwt/src/Token.php
294 /modules/ps_accounts/vendor/lcobucci/jwt/src/Signature.php
295 /modules/ps_accounts/vendor/lcobucci/jwt/compat/json-exception-polyfill.php
296 /modules/ps_accounts/vendor/lcobucci/jwt/compat/lcobucci-clock-polyfill.php
297 /modules/ps_accounts/vendor/ramsey/uuid/src/functions.php
298 /modules/ps_accounts/vendor/segmentio/analytics-php/lib/Segment.php
299 /modules/ps_accounts/vendor/segmentio/analytics-php/lib/Segment/Client.php
300 /modules/ps_accounts/vendor/segmentio/analytics-php/lib/Segment/Consumer.php
301 /modules/ps_accounts/vendor/segmentio/analytics-php/lib/Segment/QueueConsumer.php
302 /modules/ps_accounts/vendor/segmentio/analytics-php/lib/Segment/Consumer/File.php
303 /modules/ps_accounts/vendor/segmentio/analytics-php/lib/Segment/Consumer/ForkCurl.php
304 /modules/ps_accounts/vendor/segmentio/analytics-php/lib/Segment/Consumer/LibCurl.php
305 /modules/ps_accounts/vendor/segmentio/analytics-php/lib/Segment/Consumer/Socket.php
306 /modules/ps_accounts/vendor/segmentio/analytics-php/lib/Segment/Version.php
307 /modules/ps_classic_edition/vendor/autoload.php
308 /modules/ps_classic_edition/vendor/composer/autoload_real.php
309 /modules/ps_classic_edition/vendor/composer/platform_check.php
310 /modules/ps_classic_edition/vendor/composer/autoload_static.php
311 /modules/rcpgtagmanager/vendor/autoload.php
312 /modules/rcpgtagmanager/vendor/composer/autoload_real.php
313 /modules/rcpgtagmanager/vendor/composer/autoload_static.php
314 /modules/rcpgtagmanager/vendor/ralouphie/getallheaders/src/getallheaders.php
315 /modules/rcpgtagmanager/vendor/symfony/deprecation-contracts/function.php
316 /modules/rcpgtagmanager/vendor/guzzlehttp/guzzle/src/functions_include.php
317 /modules/ps_eventbus/vendor/autoload.php
318 /modules/ps_eventbus/vendor/composer/autoload_real.php
319 /modules/ps_eventbus/vendor/composer/autoload_static.php
320 /modules/psshipping/vendor/autoload.php
321 /modules/psshipping/vendor/composer/autoload_real.php
322 /modules/psshipping/vendor/composer/autoload_static.php
323 /modules/psshipping/vendor/guzzlehttp/psr7/src/functions_include.php
324 /modules/psshipping/vendor/guzzlehttp/psr7/src/functions.php
325 /modules/psshipping/vendor/clue/stream-filter/src/functions_include.php
326 /modules/psshipping/vendor/clue/stream-filter/src/functions.php
327 /modules/psshipping/vendor/php-http/message/src/filters.php
328 /modules/onepagecheckoutps/vendor/autoload.php
329 /modules/onepagecheckoutps/vendor/composer/autoload_real.php
330 /modules/onepagecheckoutps/vendor/composer/platform_check.php
331 /modules/onepagecheckoutps/vendor/composer/autoload_static.php
332 /modules/onepagecheckoutps/vendor/phpseclib/phpseclib/phpseclib/bootstrap.php
333 /modules/paypal/vendor/autoload.php
334 /modules/paypal/vendor/composer/autoload_real.php
335 /modules/paypal/vendor/composer/autoload_static.php
336 /modules/stsitebuilder/vendor/autoload.php
337 /modules/stsitebuilder/vendor/composer/autoload_real.php
338 /modules/stsitebuilder/vendor/composer/platform_check.php
339 /modules/stsitebuilder/vendor/composer/autoload_static.php
340 /modules/p2wavemarket/vendor/autoload.php
341 /modules/p2wavemarket/vendor/composer/autoload_real.php
342 /modules/p2wavemarket/vendor/composer/platform_check.php
343 /modules/p2wavemarket/vendor/composer/autoload_static.php
344 /modules/ps_mbo/vendor/autoload.php
345 /modules/ps_mbo/vendor/composer/autoload_real.php
346 /modules/ps_mbo/vendor/composer/platform_check.php
347 /modules/ps_mbo/vendor/composer/autoload_static.php
348 /modules/ps_mbo/vendor/guzzlehttp/promises/src/functions_include.php
349 /modules/ps_mbo/vendor/guzzlehttp/promises/src/functions.php
350 /modules/ps_mbo/vendor/sentry/sentry/src/functions.php
351 /modules/ps_mbo/bootstrap.php
352 /modules/ps_mbo/src/Helpers/EnvHelper.php
353 /modules/desstsitebuildertranslator/vendor/autoload.php
354 /modules/desstsitebuildertranslator/vendor/composer/autoload_real.php
355 /modules/desstsitebuildertranslator/vendor/composer/platform_check.php
356 /modules/desstsitebuildertranslator/vendor/composer/autoload_static.php
357 /var/cache/prod/FrontContainer.php
358 /src/Adapter/Container/LegacyContainer.php
359 /vendor/symfony/dependency-injection/Container.php
360 /vendor/symfony/dependency-injection/Argument/RewindableGenerator.php
361 /vendor/symfony/dependency-injection/Argument/ServiceLocator.php
362 /vendor/symfony/dependency-injection/ServiceLocator.php
363 /vendor/symfony/service-contracts/ServiceLocatorTrait.php
364 /vendor/psr/container/src/ContainerExceptionInterface.php
365 /vendor/psr/container/src/NotFoundExceptionInterface.php
366 /vendor/symfony/service-contracts/ServiceProviderInterface.php
367 /vendor/psr/container/src/ContainerInterface.php
368 /vendor/symfony/dependency-injection/ContainerInterface.php
369 /src/Adapter/Container/LegacyContainerInterface.php
370 /src/PrestaShopBundle/Entity/Repository/FeatureFlagRepository.php
371 /vendor/doctrine/orm/src/EntityRepository.php
372 /vendor/doctrine/persistence/src/Persistence/ObjectRepository.php
373 /vendor/doctrine/collections/lib/Doctrine/Common/Collections/Selectable.php
374 /vendor/symfony/var-exporter/LazyProxyTrait.php
375 /vendor/symfony/var-exporter/Internal/LazyObjectTrait.php
376 /vendor/symfony/var-exporter/LazyObjectInterface.php
377 /vendor/symfony/var-exporter/Internal/Hydrator.php
378 /vendor/symfony/var-exporter/Internal/LazyObjectRegistry.php
379 /vendor/symfony/var-exporter/Internal/LazyObjectState.php
380 /src/PrestaShopBundle/Security/Admin/LegacyAdminTokenValidator.php
381 /vendor/symfony/var-exporter/LazyGhostTrait.php
382 /src/Core/FeatureFlag/FeatureFlagManager.php
383 /src/Core/FeatureFlag/FeatureFlagStateCheckerInterface.php
384 /src/Core/FeatureFlag/Layer/DbLayer.php
385 /src/Core/FeatureFlag/TypeLayerInterface.php
386 /src/Core/FeatureFlag/Layer/DotEnvLayer.php
387 /src/Core/FeatureFlag/Layer/EnvLayer.php
388 /src/Core/FeatureFlag/Layer/QueryLayer.php
389 /vendor/symfony/http-foundation/RequestStack.php
390 /vendor/doctrine/orm/src/EntityManager.php
391 /vendor/doctrine/orm/src/EntityManagerInterface.php
392 /vendor/doctrine/persistence/src/Persistence/ObjectManager.php
393 /src/Core/Hook/HookModuleFilter.php
394 /src/Core/Hook/HookModuleFilterInterface.php
395 /modules/stsitebuilder/stsitebuilder.php
396 /modules/stsitebuilder/classes/SiteBuilderBase.php
397 /modules/stsitebuilder/classes/SiteBuilderProductBase.php
398 /modules/stsitebuilder/classes/SiteBuilderTranslation.php
399 /src/Core/Module/WidgetInterface.php
400 /vendor/smarty/smarty/libs/sysplugins/smarty_internal_method_createdata.php
401 /vendor/smarty/smarty/libs/sysplugins/smarty_data.php
402 /modules/stsitebuilder/classes/data/element/Type.php
403 /src/PrestaShopBundle/Translation/TranslatorComponent.php
404 /vendor/symfony/translation/Translator.php
405 /vendor/symfony/translation/MessageCatalogue.php
406 /vendor/symfony/translation/MessageCatalogueInterface.php
407 /vendor/symfony/translation/MetadataAwareInterface.php
408 /vendor/symfony/translation/CatalogueMetadataAwareInterface.php
409 /vendor/symfony/translation-contracts/TranslatorInterface.php
410 /vendor/symfony/translation/TranslatorBagInterface.php
411 /vendor/symfony/translation-contracts/LocaleAwareInterface.php
412 /src/PrestaShopBundle/Translation/PrestaShopTranslatorTrait.php
413 /src/PrestaShopBundle/Translation/TranslatorLanguageTrait.php
414 /src/PrestaShopBundle/Translation/TranslatorInterface.php
415 /vendor/symfony/translation/Formatter/MessageFormatter.php
416 /vendor/symfony/translation/Formatter/IntlFormatter.php
417 /vendor/symfony/translation/Formatter/IntlFormatterInterface.php
418 /vendor/symfony/translation/Formatter/MessageFormatterInterface.php
419 /vendor/symfony/translation/IdentityTranslator.php
420 /vendor/symfony/translation-contracts/TranslatorTrait.php
421 /vendor/symfony/config/ConfigCacheFactory.php
422 /vendor/symfony/config/ConfigCacheFactoryInterface.php
423 /var/cache/prod/translations/catalogue.en-US.NXhscRe.php
424 /src/PrestaShopBundle/Translation/DomainNormalizer.php
425 /src/Adapter/Localization/LegacyTranslator.php
426 /classes/Translate.php
427 /modules/onepagecheckoutps/onepagecheckoutps.php
428 /modules/onepagecheckoutps/src/PTSService.php
429 /modules/ps_classic_edition/vendor/prestashop/module-lib-service-container/src/DependencyInjection/ServiceContainer.php
430 /modules/ps_classic_edition/vendor/prestashop/module-lib-cache-directory-provider/src/Cache/CacheDirectoryProvider.php
431 /modules/ps_classic_edition/vendor/prestashop/module-lib-service-container/src/DependencyInjection/ContainerProvider.php
432 /var/cache/prod/Onepagecheckoutps520FrontContainer.php
433 /modules/onepagecheckoutps/src/Application/Core/CoreService.php
434 /modules/onepagecheckoutps/src/Application/PrestaShop/Provider/ContextProvider.php
435 /modules/onepagecheckoutps/src/Infrastructure/Shop/Provider/PrestaShopShopProvider.php
436 /modules/onepagecheckoutps/src/Domain/Shop/ShopProviderInterface.php
437 /vendor/symfony/security-csrf/CsrfTokenManager.php
438 /vendor/symfony/security-csrf/CsrfTokenManagerInterface.php
439 /vendor/symfony/security-csrf/TokenGenerator/UriSafeTokenGenerator.php
440 /vendor/symfony/security-csrf/TokenGenerator/TokenGeneratorInterface.php
441 /vendor/symfony/security-csrf/TokenStorage/NativeSessionTokenStorage.php
442 /vendor/symfony/security-csrf/TokenStorage/ClearableTokenStorageInterface.php
443 /vendor/symfony/security-csrf/TokenStorage/TokenStorageInterface.php
444 /modules/onepagecheckoutps/translations/en.php
445 /modules/onepagecheckoutps/src/Hook/HookModuleRoutesService.php
446 /modules/onepagecheckoutps/src/Hook/AbstractHook.php
447 /modules/ybc_blog/ybc_blog.php
448 /modules/ybc_blog/classes/ybc_blog_category_class.php
449 /modules/ybc_blog/classes/ybc_blog_post_class.php
450 /modules/ybc_blog/classes/ybc_blog_paggination_class.php
451 /modules/ybc_blog/classes/ybc_blog_comment_class.php
452 /modules/ybc_blog/classes/ybc_blog_reply_class.php
453 /modules/ybc_blog/classes/ybc_blog_polls_class.php
454 /modules/ybc_blog/classes/ybc_blog_slide_class.php
455 /modules/ybc_blog/classes/ybc_blog_gallery_class.php
456 /modules/ybc_blog/classes/ybc_blog_link_class.php
457 /modules/ybc_blog/classes/ybc_blog_employee_class.php
458 /modules/ybc_blog/classes/ybc_blog_email_template_class.php
459 /modules/ybc_blog/classes/ImportExport.php
460 /modules/ybc_blog/classes/ybc_browser.php
461 /modules/ybc_blog/ybc_blog_defines.php
462 /modules/ybc_blog/classes/ybc_chatgpt.php
463 /modules/ybc_blog/classes/ybc_chatgpt_message.php
464 /modules/ybc_blog/src/FormType/DescriptionType.php
465 /src/PrestaShopBundle/Form/Admin/Sell/Product/Description/DescriptionType.php
466 /modules/ybc_blog/translations/en.php
467 /modules/p2wavemarket/p2wavemarket.php
468 /modules/p2wavemarket/controllers/admin/PToWavemarketChannelsController.php
469 /modules/p2wavemarket/classes/PToWavemarketChannel.php
470 /classes/controller/ModuleAdminController.php
471 /classes/controller/AdminController.php
472 /controllers/front/ProductController.php
473 /classes/controller/ProductPresentingFrontController.php
474 /override/classes/controller/FrontController.php
475 /classes/controller/FrontController.php
476 /src/Adapter/Presenter/Object/ObjectPresenter.php
477 /src/Adapter/Presenter/PresenterInterface.php
478 /src/Adapter/Presenter/Cart/CartPresenter.php
479 /src/Adapter/Image/ImageRetriever.php
480 /classes/tax/TaxConfiguration.php
481 /classes/Smarty/TemplateFinder.php
482 /classes/assets/StylesheetManager.php
483 /classes/assets/AbstractAssetManager.php
484 /src/Adapter/Assets/AssetUrlGeneratorTrait.php
485 /classes/assets/JavascriptManager.php
486 /classes/assets/CccReducer.php
487 /src/Core/Localization/Locale/Repository.php
488 /src/Core/Localization/Locale/RepositoryInterface.php
489 /src/Core/Localization/CLDR/LocaleRepository.php
490 /src/Core/Localization/CLDR/LocaleDataSource.php
491 /src/Core/Localization/CLDR/DataLayer/LocaleCache.php
492 /src/Core/Data/Layer/AbstractDataLayer.php
493 /src/Core/Localization/CLDR/LocaleDataLayerInterface.php
494 /src/Core/Localization/CLDR/DataLayer/LocaleReference.php
495 /src/Core/Localization/CLDR/Reader.php
496 /src/Core/Localization/CLDR/ReaderInterface.php
497 /src/Core/Localization/Currency/Repository.php
498 /src/Core/Localization/Currency/RepositoryInterface.php
499 /src/Core/Localization/Currency/CurrencyDataSource.php
500 /src/Core/Localization/Currency/DataSourceInterface.php
501 /src/Core/Localization/Currency/DataLayer/CurrencyCache.php
502 /src/Core/Localization/Currency/CurrencyDataLayerInterface.php
503 /src/Core/Localization/Currency/DataLayer/CurrencyDatabase.php
504 /src/Adapter/Currency/CurrencyDataProvider.php
505 /src/Core/Currency/CurrencyDataProviderInterface.php
506 /src/Adapter/LegacyContext.php
507 /src/Adapter/Tools.php
508 /src/Core/Localization/Currency/DataLayer/CurrencyReference.php
509 /src/Core/Localization/Currency/DataLayer/CurrencyInstalled.php
510 /vendor/prestashop/decimal/src/Operation/Rounding.php
511 /src/Core/Localization/Locale.php
512 /src/Core/Localization/LocaleInterface.php
513 /src/Core/Localization/Specification/Price.php
514 /src/Core/Localization/Specification/Number.php
515 /src/Core/Localization/Specification/NumberInterface.php
516 /src/Core/Localization/Specification/Factory.php
517 /src/Core/Localization/CLDR/LocaleData.php
518 /src/Core/Localization/CLDR/NumberSymbolsData.php
519 /src/Core/Localization/CLDR/CurrencyData.php
520 /src/Core/Localization/CLDR/Locale.php
521 /src/Core/Localization/CLDR/LocaleInterface.php
522 /src/Core/Localization/Specification/NumberSymbolList.php
523 /classes/Currency.php
524 /src/Core/Localization/Currency/LocalizedCurrencyId.php
525 /classes/webservice/WebserviceRequest.php
526 /src/Core/Localization/Currency/CurrencyData.php
527 /src/Core/Localization/Currency/CurrencyCollection.php
528 /src/Core/Localization/Currency.php
529 /src/Core/Localization/CurrencyInterface.php
530 /src/Core/Localization/Specification/NumberCollection.php
531 /src/Core/Localization/Number/Formatter.php
532 /classes/Cart.php
533 /src/Adapter/AddressFactory.php
534 /classes/CartRule.php
535 /src/Core/Domain/Product/ValueObject/RedirectType.php
536 /src/Core/Util/DateTime/DateTime.php
537 /src/Core/Domain/Product/Stock/ValueObject/OutOfStockType.php
538 /src/Core/Domain/Product/Pack/ValueObject/PackStockType.php
539 /src/Core/Domain/Product/ValueObject/ProductType.php
540 /src/Core/Domain/Product/ValueObject/Reference.php
541 /src/Core/Domain/Product/ValueObject/Gtin.php
542 /src/Core/Domain/Product/ValueObject/Isbn.php
543 /src/Core/Domain/Product/ValueObject/Upc.php
544 /src/Core/Domain/Product/ProductSettings.php
545 /modules/stsitebuilder/libs/elementor/define.php
546 /modules/stsitebuilder/libs/elementor/helper.php
547 /modules/stsitebuilder/libs/elementor/wp-includes/class-wp-rest-controller.php
548 /modules/stsitebuilder/libs/elementor/wp-includes/class-wp-error.php
549 /modules/stsitebuilder/libs/elementor/includes/plugin.php
550 /modules/stsitebuilder/libs/elementor/includes/autoloader.php
551 /modules/stsitebuilder/libs/elementor/includes/managers/controls.php
552 /modules/stsitebuilder/libs/elementor/data/v2/manager.php
553 /modules/stsitebuilder/libs/elementor/core/base/module.php
554 /modules/stsitebuilder/libs/elementor/core/base/base-object.php
555 /modules/stsitebuilder/libs/elementor/core/experiments/manager.php
556 /modules/stsitebuilder/libs/elementor/core/experiments/wrap-core-dependency.php
557 /modules/stsitebuilder/libs/elementor/core/breakpoints/manager.php
558 /modules/stsitebuilder/libs/elementor/core/settings/manager.php
559 /modules/stsitebuilder/libs/elementor/core/settings/style-globals/manager.php
560 /modules/stsitebuilder/libs/elementor/core/settings/base/manager.php
561 /modules/stsitebuilder/libs/elementor/core/settings/page/manager.php
562 /modules/stsitebuilder/libs/elementor/core/settings/base/css-manager.php
563 /modules/stsitebuilder/libs/elementor/core/settings/editor-preferences/manager.php
564 /modules/stsitebuilder/libs/elementor/core/settings/theme-editor-custom-code/manager.php
565 /modules/stsitebuilder/libs/elementor/core/settings/theme-editor-lightbox/manager.php
566 /modules/stsitebuilder/libs/elementor/core/settings/theme-editor-sidebar/manager.php
567 /modules/stsitebuilder/libs/elementor/core/settings/theme-editor-side-cart-panel/manager.php
568 /modules/stsitebuilder/libs/elementor/core/settings/theme-editor-typography/manager.php
569 /modules/stsitebuilder/libs/elementor/core/settings/theme-editor-general/manager.php
570 /modules/stsitebuilder/libs/elementor/core/settings/theme-editor-buttons/manager.php
571 /modules/stsitebuilder/libs/elementor/core/settings/theme-editor-classic/manager.php
572 /modules/stsitebuilder/libs/elementor/core/settings/child-theme-my-account/manager.php
573 /modules/stsitebuilder/libs/elementor/core/settings/child-theme-checkout/manager.php
574 /modules/stsitebuilder/libs/elementor/includes/db.php
575 /modules/stsitebuilder/libs/elementor/core/base/document.php
576 /modules/stsitebuilder/libs/elementor/includes/base/controls-stack.php
577 /modules/stsitebuilder/libs/elementor/core/documents-manager.php
578 /modules/stsitebuilder/libs/elementor/includes/managers/elements.php
579 /modules/stsitebuilder/libs/elementor/includes/base/element-base.php
580 /modules/stsitebuilder/libs/elementor/includes/elements/column.php
581 /modules/stsitebuilder/libs/elementor/includes/elements/section.php
582 /modules/stsitebuilder/libs/elementor/includes/elements/repeater.php
583 /modules/stsitebuilder/libs/elementor/includes/managers/widgets.php
584 /modules/stsitebuilder/libs/elementor/modules/nested-elements/module.php
585 /modules/stsitebuilder/libs/elementor/includes/base/widget-base.php
586 /modules/stsitebuilder/libs/elementor/includes/widgets/footer-base.php
587 /modules/stsitebuilder/libs/elementor/includes/widgets/dropdown_base.php
588 /modules/stsitebuilder/libs/elementor/includes/widgets/menu_base.php
589 /modules/stsitebuilder/libs/elementor/includes/widgets/traits/basic-trait.php
590 /modules/stsitebuilder/libs/elementor/includes/widgets/form-base.php
591 /modules/stsitebuilder/libs/elementor/modules/templates/types/widgets/miniature-name-base.php
592 /modules/stsitebuilder/libs/elementor/modules/templates/types/widgets/miniature-description-base.php
593 /modules/stsitebuilder/libs/elementor/includes/managers/skins.php
594 /modules/stsitebuilder/libs/elementor/includes/base/skin-base.php
595 /modules/stsitebuilder/libs/elementor/includes/base/sub-controls-stack.php
596 /modules/stsitebuilder/libs/elementor/core/files/manager.php
597 /modules/stsitebuilder/libs/elementor/includes/managers/icons.php
598 /modules/stsitebuilder/libs/elementor/core/page-assets/data-managers/font-icon-svg/manager.php
599 /modules/stsitebuilder/libs/elementor/core/editor/editor.php
600 /modules/stsitebuilder/libs/elementor/modules/editor-app-bar/module.php
601 /modules/stsitebuilder/libs/elementor/core/editor/data/globals/controller.php
602 /modules/stsitebuilder/libs/elementor/data/v2/base/controller.php
603 /modules/stsitebuilder/libs/elementor/includes/preview.php
604 /modules/stsitebuilder/libs/elementor/core/base/app.php
605 /modules/stsitebuilder/libs/elementor/includes/frontend.php
606 /modules/stsitebuilder/libs/elementor/core/dynamic-tags/manager.php
607 /modules/stsitebuilder/libs/elementor/core/modules-manager.php
608 /modules/stsitebuilder/libs/elementor/modules/history/module.php
609 /modules/stsitebuilder/libs/elementor/modules/library/module.php
610 /modules/stsitebuilder/libs/elementor/modules/library/documents/not-supported.php
611 /modules/stsitebuilder/libs/elementor/modules/library/documents/library-document.php
612 /modules/stsitebuilder/libs/elementor/modules/library/traits/library.php
613 /modules/stsitebuilder/libs/elementor/includes/template-library/sources/local.php
614 /modules/stsitebuilder/libs/elementor/includes/template-library/sources/base.php
615 /modules/stsitebuilder/libs/elementor/modules/library/documents/page.php
616 /modules/stsitebuilder/libs/elementor/modules/library/documents/section.php
617 /modules/stsitebuilder/libs/elementor/modules/library/documents/container.php
618 /modules/stsitebuilder/libs/elementor/modules/dynamic-tags/module.php
619 /modules/stsitebuilder/libs/elementor/modules/dev-tools/module.php
620 /modules/stsitebuilder/libs/elementor/modules/dev-tools/deprecation.php
621 /modules/stsitebuilder/libs/elementor/modules/elements-color-picker/module.php
622 /modules/stsitebuilder/libs/elementor/modules/shapes/module.php
623 /modules/stsitebuilder/libs/elementor/modules/favorites/module.php
624 /modules/stsitebuilder/libs/elementor/modules/favorites/types/widgets.php
625 /modules/stsitebuilder/libs/elementor/modules/favorites/favorites-type.php
626 /modules/stsitebuilder/libs/elementor/core/utils/static-collection.php
627 /modules/stsitebuilder/libs/elementor/core/utils/collection.php
628 /modules/stsitebuilder/libs/elementor/modules/nested-tabs/module.php
629 /modules/stsitebuilder/libs/elementor/modules/nested-accordion/module.php
630 /modules/stsitebuilder/libs/elementor/modules/web-cli/module.php
631 /modules/stsitebuilder/libs/elementor/modules/lazyload/module.php
632 /modules/stsitebuilder/libs/elementor/modules/site-navigation/module.php
633 /modules/stsitebuilder/libs/elementor/modules/site-navigation/data/controller.php
634 /modules/stsitebuilder/libs/elementor/includes/utils.php
635 /modules/stsitebuilder/libs/elementor/modules/link-in-bio/module.php
636 /modules/stsitebuilder/libs/elementor/modules/templates/module.php
637 /modules/stsitebuilder/classes/DB/StSiteBuilderClass.php
638 /vendor/prestashop/decimal/src/DecimalNumber.php
639 /vendor/prestashop/decimal/src/Builder.php
640 /classes/Category.php
641 /src/Core/Domain/Category/ValueObject/RedirectType.php
642 /src/Core/Domain/Category/CategorySettings.php
643 /src/Core/Domain/Category/SeoSettings.php
644 /modules/stsitebuilder/libs/elementor/modules/nested-slider/module.php
645 /modules/stsitebuilder/libs/elementor/includes/managers/image.php
646 /modules/stsitebuilder/libs/elementor/core/page-assets/loader.php
647 /modules/stsitebuilder/libs/elementor/includes/controls/animation.php
648 /modules/stsitebuilder/libs/elementor/includes/controls/base-data.php
649 /modules/stsitebuilder/libs/elementor/includes/controls/base.php
650 /modules/stsitebuilder/libs/elementor/includes/controls/hover-animation.php
651 /modules/stsitebuilder/libs/elementor/includes/controls/exit-animation.php
652 /modules/stsitebuilder/libs/elementor/core/common/app.php
653 /modules/stsitebuilder/libs/elementor/core/common/modules/ajax/module.php
654 /modules/onepagecheckoutps/src/Service/PresTeamShop/PresTeamShopService.php
655 /modules/onepagecheckoutps/src/Hook/HookActionFrontControllerInitAfterService.php
656 /classes/Manufacturer.php
657 /classes/Supplier.php
658 /classes/Address.php
659 /classes/tax/TaxManagerFactory.php
660 /classes/tax/TaxRulesTaxManager.php
661 /classes/tax/TaxManagerInterface.php
662 /src/Core/Domain/Shop/ValueObject/ShopId.php
663 /src/Core/Domain/Shop/ValueObject/ShopIdInterface.php
664 /classes/tax/Tax.php
665 /classes/tax/TaxCalculator.php
666 /classes/Combination.php
667 /classes/SpecificPrice.php
668 /classes/GroupReduction.php
669 /override/classes/Tag.php
670 /classes/Tag.php
671 /classes/stock/StockAvailable.php
672 /modules/ps_emailsubscription/ps_emailsubscription.php
673 /classes/Media.php
674 /modules/ps_emailalerts/ps_emailalerts.php
675 /modules/ps_emailalerts/MailAlert.php
676 /modules/llantassearch/llantassearch.php
677 /modules/llantassearch/translations/en.php
678 /modules/searchcustom/searchcustom.php
679 /modules/searchcustom/src/Ps_CustomsearchProductSearchProvider.php
680 /src/Core/Product/Search/ProductSearchProviderInterface.php
681 /modules/searchcustom/classes/SearchCustomLogger.php
682 /modules/searchcustom/classes/SearchCustomValidator.php
683 /modules/searchcustom/classes/SearchCustomFitment.php
684 /modules/searchcustom/translations/en.php
685 /modules/rcpgtagmanager/rcpgtagmanager.php
686 /modules/rcpgtagmanager/src/PSModule/RCTrackingModuleInterface.php
687 /modules/rcpgtagmanager/translations/en.php
688 /modules/rcpgtagmanager/src/PSModule/ModuleServiceProvider.php
689 /modules/rcpgtagmanager/src/PSModule/ModuleServiceFactoryPS9.php
690 /modules/rcpgtagmanager/src/PSModule/AbstractModuleServiceFactory.php
691 /modules/rcpgtagmanager/src/PSModule/ModuleServiceFactoryInterface.php
692 /modules/rcpgtagmanager/src/PSModule/Hook/HookFactoryPS9.php
693 /modules/rcpgtagmanager/src/PSModule/Hook/AbstractHookFactory.php
694 /modules/rcpgtagmanager/src/PSModule/Hook/HookFactoryInterface.php
695 /modules/rcpgtagmanager/src/PSModule/Hook/ActionFrontControllerSetMedia/ActionFrontControllerSetMediaPS9.php
696 /modules/rcpgtagmanager/src/PSModule/Hook/ActionFrontControllerSetMedia/AbstractActionFrontControllerSetMedia.php
697 /modules/rcpgtagmanager/src/PSModule/Hook/AbstractHook.php
698 /modules/rcpgtagmanager/src/PSModule/Hook/HookInterface.php
699 /modules/desfinder/desfinder.php
700 /modules/desfinder/translations/en.php
701 /src/Adapter/Presenter/Manufacturer/ManufacturerPresenter.php
702 /src/Core/Util/String/StringModifier.php
703 /src/Core/Util/String/StringModifierInterface.php
704 /src/Adapter/Presenter/Manufacturer/ManufacturerLazyArray.php
705 /src/Adapter/Presenter/AbstractLazyArray.php
706 /src/Adapter/Presenter/LazyArrayAttribute.php
707 /src/Core/Util/Inflector.php
708 /vendor/doctrine/inflector/lib/Doctrine/Inflector/InflectorFactory.php
709 /vendor/doctrine/inflector/lib/Doctrine/Inflector/Language.php
710 /vendor/doctrine/inflector/lib/Doctrine/Inflector/Rules/English/InflectorFactory.php
711 /vendor/doctrine/inflector/lib/Doctrine/Inflector/GenericLanguageInflectorFactory.php
712 /vendor/doctrine/inflector/lib/Doctrine/Inflector/LanguageInflectorFactory.php
713 /vendor/doctrine/inflector/lib/Doctrine/Inflector/Rules/English/Rules.php
714 /vendor/doctrine/inflector/lib/Doctrine/Inflector/Rules/Ruleset.php
715 /vendor/doctrine/inflector/lib/Doctrine/Inflector/Rules/Transformations.php
716 /vendor/doctrine/inflector/lib/Doctrine/Inflector/WordInflector.php
717 /vendor/doctrine/inflector/lib/Doctrine/Inflector/Rules/English/Inflectible.php
718 /vendor/doctrine/inflector/lib/Doctrine/Inflector/Rules/Transformation.php
719 /vendor/doctrine/inflector/lib/Doctrine/Inflector/Rules/Pattern.php
720 /vendor/doctrine/inflector/lib/Doctrine/Inflector/Rules/Patterns.php
721 /vendor/doctrine/inflector/lib/Doctrine/Inflector/Rules/English/Uninflected.php
722 /vendor/doctrine/inflector/lib/Doctrine/Inflector/Rules/Substitutions.php
723 /vendor/doctrine/inflector/lib/Doctrine/Inflector/Rules/Substitution.php
724 /vendor/doctrine/inflector/lib/Doctrine/Inflector/Rules/Word.php
725 /vendor/doctrine/inflector/lib/Doctrine/Inflector/Inflector.php
726 /vendor/doctrine/inflector/lib/Doctrine/Inflector/CachedWordInflector.php
727 /vendor/doctrine/inflector/lib/Doctrine/Inflector/RulesetInflector.php
728 /src/Core/Image/ImageFormatConfiguration.php
729 /src/Core/Image/ImageFormatConfigurationInterface.php
730 /classes/ImageType.php
731 /classes/ProductPresenterFactory.php
732 /src/Core/Product/ProductPresentationSettings.php
733 /src/Core/Product/ProductExtraContentFinder.php
734 /src/PrestaShopBundle/Service/Hook/HookFinder.php
735 /classes/Pack.php
736 /src/Adapter/HookManager.php
737 /vendor/smarty/smarty/libs/sysplugins/smarty_internal_method_gettemplatevars.php
738 /vendor/smarty/smarty/libs/sysplugins/smarty_undefined_variable.php
739 /src/Core/Localization/CLDR/ComputingPrecision.php
740 /src/Core/Localization/CLDR/ComputingPrecisionInterface.php
741 /classes/order/Order.php
742 /src/Adapter/Presenter/Product/ProductPresenter.php
743 /src/Adapter/Product/PriceFormatter.php
744 /src/Adapter/Product/ProductColorsRetriever.php
745 /src/Adapter/Presenter/Product/ProductLazyArray.php
746 /classes/Image.php
747 /vendor/prestashop/decimal/src/Operation/Multiplication.php
748 /vendor/prestashop/decimal/src/Operation/Addition.php
749 /modules/productcomments/productcomments.php
750 /src/Adapter/ContainerFinder.php
751 /modules/productcomments/src/Repository/ProductCommentRepository.php
752 /vendor/doctrine/doctrine-bundle/Repository/ServiceEntityRepository.php
753 /vendor/doctrine/doctrine-bundle/Repository/ServiceEntityRepositoryInterface.php
754 /vendor/doctrine/doctrine-bundle/Registry.php
755 /vendor/symfony/doctrine-bridge/ManagerRegistry.php
756 /vendor/doctrine/persistence/src/Persistence/AbstractManagerRegistry.php
757 /vendor/doctrine/persistence/src/Persistence/ManagerRegistry.php
758 /vendor/doctrine/persistence/src/Persistence/ConnectionRegistry.php
759 /vendor/doctrine/doctrine-bundle/ConnectionFactory.php
760 /src/PrestaShopBundle/DependencyInjection/RuntimeConstEnvVarProcessor.php
761 /vendor/symfony/dependency-injection/EnvVarProcessorInterface.php
762 /vendor/symfony/doctrine-bridge/ContainerAwareEventManager.php
763 /vendor/doctrine/event-manager/src/EventManager.php
764 /vendor/doctrine/dbal/src/DriverManager.php
765 /vendor/doctrine/dbal/src/Driver/PDO/MySQL/Driver.php
766 /vendor/doctrine/dbal/src/Driver/AbstractMySQLDriver.php
767 /vendor/doctrine/dbal/src/VersionAwarePlatformDriver.php
768 /vendor/doctrine/dbal/src/Driver.php
769 /src/PrestaShopBundle/Doctrine/DatabaseConnection.php
770 /vendor/doctrine/dbal/src/Connection.php
771 /vendor/doctrine/dbal/src/ArrayParameterType.php
772 /vendor/doctrine/dbal/src/ParameterType.php
773 /vendor/doctrine/dbal/src/Query/Expression/ExpressionBuilder.php
774 /vendor/doctrine/dbal/src/Schema/LegacySchemaManagerFactory.php
775 /vendor/doctrine/dbal/src/Schema/SchemaManagerFactory.php
776 /vendor/doctrine/dbal/src/Driver/PDO/Connection.php
777 /vendor/doctrine/dbal/src/Driver/ServerInfoAwareConnection.php
778 /vendor/doctrine/dbal/src/Driver/Connection.php
779 /vendor/doctrine/dbal/src/Events.php
780 /vendor/doctrine/dbal/src/Platforms/MariaDb1010Platform.php
781 /vendor/doctrine/dbal/src/Platforms/MariaDb1060Platform.php
782 /vendor/doctrine/dbal/src/Platforms/MariaDb1052Platform.php
783 /vendor/doctrine/dbal/src/Platforms/MariaDb1043Platform.php
784 /vendor/doctrine/dbal/src/Platforms/MariaDb1027Platform.php
785 /vendor/doctrine/dbal/src/Platforms/MariaDBPlatform.php
786 /vendor/doctrine/dbal/src/Platforms/MySQLPlatform.php
787 /vendor/doctrine/dbal/src/Platforms/AbstractMySQLPlatform.php
788 /vendor/doctrine/dbal/src/Platforms/AbstractPlatform.php
789 /vendor/doctrine/dbal/src/Schema/MySQLSchemaManager.php
790 /vendor/doctrine/dbal/src/Schema/AbstractSchemaManager.php
791 /vendor/doctrine/dbal/src/Types/Types.php
792 /vendor/doctrine/dbal/src/Types/Type.php
793 /vendor/doctrine/dbal/src/Types/ArrayType.php
794 /vendor/doctrine/dbal/src/Types/AsciiStringType.php
795 /vendor/doctrine/dbal/src/Types/StringType.php
796 /vendor/doctrine/dbal/src/Types/BigIntType.php
797 /vendor/doctrine/dbal/src/Types/PhpIntegerMappingType.php
798 /vendor/doctrine/dbal/src/Types/BinaryType.php
799 /vendor/doctrine/dbal/src/Types/BlobType.php
800 /vendor/doctrine/dbal/src/Types/BooleanType.php
801 /vendor/doctrine/dbal/src/Types/DateType.php
802 /vendor/doctrine/dbal/src/Types/DateImmutableType.php
803 /vendor/doctrine/dbal/src/Types/DateIntervalType.php
804 /vendor/doctrine/dbal/src/Types/DateTimeType.php
805 /vendor/doctrine/dbal/src/Types/PhpDateTimeMappingType.php
806 /vendor/doctrine/dbal/src/Types/DateTimeImmutableType.php
807 /vendor/doctrine/dbal/src/Types/DateTimeTzType.php
808 /vendor/doctrine/dbal/src/Types/DateTimeTzImmutableType.php
809 /vendor/doctrine/dbal/src/Types/DecimalType.php
810 /vendor/doctrine/dbal/src/Types/FloatType.php
811 /vendor/doctrine/dbal/src/Types/GuidType.php
812 /vendor/doctrine/dbal/src/Types/IntegerType.php
813 /vendor/doctrine/dbal/src/Types/JsonType.php
814 /vendor/doctrine/dbal/src/Types/ObjectType.php
815 /vendor/doctrine/dbal/src/Types/SimpleArrayType.php
816 /vendor/doctrine/dbal/src/Types/SmallIntType.php
817 /vendor/doctrine/dbal/src/Types/TextType.php
818 /vendor/doctrine/dbal/src/Types/TimeType.php
819 /vendor/doctrine/dbal/src/Types/TimeImmutableType.php
820 /vendor/doctrine/dbal/src/Types/TypeRegistry.php
821 /modules/productcomments/src/Entity/ProductComment.php
822 /vendor/doctrine/orm/src/Proxy/Proxy.php
823 /vendor/doctrine/common/src/Proxy/Proxy.php
824 /vendor/doctrine/persistence/src/Persistence/Proxy.php
825 /vendor/doctrine/orm/src/Proxy/InternalProxy.php
826 /src/PrestaShopBundle/DependencyInjection/CacheAdapterFactory.php
827 /vendor/doctrine/persistence/src/Persistence/Mapping/Driver/MappingDriverChain.php
828 /vendor/doctrine/annotations/lib/Doctrine/Common/Annotations/ImplicitlyIgnoredAnnotationNames.php
829 /vendor/doctrine/annotations/lib/Doctrine/Common/Annotations/Annotation/IgnoreAnnotation.php
830 /vendor/doctrine/annotations/lib/Doctrine/Common/Annotations/PhpParser.php
831 /src/PrestaShopBundle/Service/Database/DoctrineNamingStrategy.php
832 /vendor/doctrine/orm/src/Mapping/UnderscoreNamingStrategy.php
833 /vendor/doctrine/orm/src/Mapping/NamingStrategy.php
834 /vendor/doctrine/orm/src/Mapping/DefaultQuoteStrategy.php
835 /vendor/doctrine/orm/src/Internal/SQLResultCasing.php
836 /vendor/doctrine/orm/src/Mapping/QuoteStrategy.php
837 /vendor/doctrine/doctrine-bundle/Mapping/ContainerEntityListenerResolver.php
838 /vendor/doctrine/doctrine-bundle/Mapping/EntityListenerServiceResolver.php
839 /vendor/doctrine/orm/src/Mapping/EntityListenerResolver.php
840 /vendor/doctrine/doctrine-bundle/Repository/ContainerRepositoryFactory.php
841 /vendor/doctrine/orm/src/Repository/RepositoryFactory.php
842 /vendor/doctrine/orm/src/Mapping/ClassMetadataFactory.php
843 /vendor/doctrine/persistence/src/Persistence/Mapping/AbstractClassMetadataFactory.php
844 /vendor/doctrine/persistence/src/Persistence/Mapping/ClassMetadataFactory.php
845 /vendor/doctrine/orm/src/Mapping/ClassMetadata.php
846 /vendor/doctrine/orm/src/Mapping/ClassMetadataInfo.php
847 /vendor/doctrine/persistence/src/Persistence/Mapping/ClassMetadata.php
848 /vendor/doctrine/orm/src/Proxy/DefaultProxyClassNameResolver.php
849 /vendor/doctrine/persistence/src/Persistence/Mapping/ProxyClassNameResolver.php
850 /vendor/doctrine/orm/src/UnitOfWork.php
851 /vendor/doctrine/persistence/src/Persistence/PropertyChangedListener.php
852 /vendor/doctrine/orm/src/Event/ListenersInvoker.php
853 /vendor/doctrine/orm/src/Utility/IdentifierFlattener.php
854 /vendor/doctrine/orm/src/Internal/HydrationCompleteHandler.php
855 /vendor/doctrine/orm/src/Mapping/Reflection/ReflectionPropertiesGetter.php
856 /vendor/doctrine/persistence/src/Persistence/Mapping/RuntimeReflectionService.php
857 /vendor/doctrine/persistence/src/Persistence/Mapping/ReflectionService.php
858 /vendor/doctrine/orm/src/Proxy/ProxyFactory.php
859 /vendor/doctrine/common/src/Proxy/AbstractProxyFactory.php
860 /vendor/doctrine/common/src/Proxy/ProxyGenerator.php
861 /vendor/doctrine/doctrine-bundle/ManagerConfigurator.php
862 /vendor/doctrine/lexer/src/Token.php
863 /vendor/doctrine/annotations/lib/Doctrine/Common/Annotations/AnnotationRegistry.php
864 /vendor/doctrine/annotations/lib/Doctrine/Common/Annotations/TokenParser.php
865 /vendor/doctrine/orm/src/Mapping/Table.php
866 /vendor/doctrine/orm/src/Mapping/MappingAttribute.php
867 /vendor/doctrine/orm/src/Mapping/Annotation.php
868 /vendor/doctrine/annotations/lib/Doctrine/Common/Annotations/Annotation/Enum.php
869 /vendor/doctrine/annotations/lib/Doctrine/Common/Annotations/Annotation/Attribute.php
870 /vendor/doctrine/annotations/lib/Doctrine/Common/Annotations/Annotation/Attributes.php
871 /vendor/doctrine/annotations/lib/Doctrine/Common/Annotations/Annotation/NamedArgumentConstructor.php
872 /vendor/doctrine/annotations/lib/Doctrine/Common/Annotations/NamedArgumentConstructorAnnotation.php
873 /vendor/doctrine/orm/src/Mapping/Entity.php
874 /vendor/doctrine/instantiator/src/Doctrine/Instantiator/Instantiator.php
875 /vendor/doctrine/instantiator/src/Doctrine/Instantiator/InstantiatorInterface.php
876 /vendor/doctrine/orm/src/Mapping/DefaultTypedFieldMapper.php
877 /vendor/doctrine/orm/src/Mapping/TypedFieldMapper.php
878 /vendor/doctrine/orm/src/Mapping/Id.php
879 /vendor/doctrine/orm/src/Mapping/Column.php
880 /vendor/doctrine/orm/src/Mapping/GeneratedValue.php
881 /vendor/doctrine/orm/src/Id/IdentityGenerator.php
882 /vendor/doctrine/orm/src/Id/AbstractIdGenerator.php
883 /vendor/doctrine/orm/src/Events.php
884 /vendor/doctrine/persistence/src/Persistence/Reflection/RuntimeReflectionProperty.php
885 /vendor/doctrine/dbal/src/Query/QueryBuilder.php
886 /vendor/doctrine/dbal/src/Query/Expression/CompositeExpression.php
887 /vendor/doctrine/dbal/src/SQL/Builder/DefaultSelectSQLBuilder.php
888 /vendor/doctrine/dbal/src/SQL/Builder/SelectSQLBuilder.php
889 /vendor/doctrine/dbal/src/Query/SelectQuery.php
890 /vendor/doctrine/dbal/src/Query/Limit.php
891 /vendor/doctrine/dbal/src/SQL/Parser.php
892 /vendor/doctrine/dbal/src/ExpandArrayParameters.php
893 /vendor/doctrine/dbal/src/SQL/Parser/Visitor.php
894 /vendor/doctrine/dbal/src/Driver/PDO/Statement.php
895 /vendor/doctrine/dbal/src/Driver/Statement.php
896 /vendor/doctrine/dbal/src/Driver/PDO/ParameterTypeMap.php
897 /vendor/doctrine/dbal/src/Driver/PDO/Result.php
898 /vendor/doctrine/dbal/src/Driver/Result.php
899 /vendor/doctrine/dbal/src/Result.php
900 /vendor/doctrine/dbal/src/FetchMode.php
901 /classes/ProductAssembler.php
902 /src/Core/Product/Search/ProductSearchContext.php
903 /src/Adapter/Presenter/Product/ProductListingPresenter.php
904 /src/Adapter/Presenter/Cart/CartLazyArray.php
905 /modules/onepagecheckoutps/src/Hook/HookActionPresentCartService.php
906 /modules/onepagecheckoutps/src/Infrastructure/Configuration/Provider/PrestaShopConfigurationProvider.php
907 /modules/onepagecheckoutps/src/Domain/Configuration/ConfigurationProviderInterface.php
908 /modules/onepagecheckoutps/src/Application/Core/Addresses/AddressesService.php
909 /modules/onepagecheckoutps/src/Application/Core/AbstractStepCheckout.php
910 /modules/onepagecheckoutps/src/Application/Core/Cart/CartService.php
911 /modules/onepagecheckoutps/src/Application/Core/GeneralService.php
912 /modules/onepagecheckoutps/src/Infrastructure/Language/Provider/PrestaShopLanguageProvider.php
913 /modules/onepagecheckoutps/src/Domain/Language/LanguageProviderInterface.php
914 /classes/Gender.php
915 /src/Core/Domain/Title/ValueObject/Gender.php
916 /classes/Risk.php
917 /classes/Meta.php
918 /vendor/mobiledetect/mobiledetectlib/src/MobileDetect.php
919 /classes/State.php
920 /src/Core/Security/PasswordPolicyConfiguration.php
921 /src/Core/Configuration/DataConfigurationInterface.php
922 /src/Core/Security/Hashing.php
923 /src/Core/Filter/FrontEndObject/MainFilter.php
924 /src/Core/Filter/FilterInterface.php
925 /src/Core/Filter/FrontEndObject/CartFilter.php
926 /src/Core/Filter/HashMapWhitelistFilter.php
927 /src/Core/Filter/CollectionFilter.php
928 /src/Core/Filter/FrontEndObject/ProductFilter.php
929 /src/Core/Filter/FrontEndObject/EmbeddedAttributesFilter.php
930 /src/Core/Filter/FrontEndObject/CustomerFilter.php
931 /src/Core/Filter/FrontEndObject/ShopFilter.php
932 /src/Core/Filter/FrontEndObject/ConfigurationFilter.php
933 /modules/ps_shoppingcart/ps_shoppingcart.php
934 /modules/ps_searchbar/ps_searchbar.php
935 /modules/stsitebuilder/libs/elementor/core/breakpoints/breakpoint.php
936 /vendor/smarty/smarty/libs/sysplugins/smarty_template_cached.php
937 /vendor/smarty/smarty/libs/sysplugins/smarty_cacheresource.php
938 /vendor/smarty/smarty/libs/sysplugins/smarty_internal_cacheresource_file.php
939 /vendor/smarty/smarty/libs/sysplugins/smarty_internal_runtime_updatecache.php
940 /vendor/smarty/smarty/libs/sysplugins/smarty_template_compiled.php
941 /var/cache/prod/smarty/compile/ckcautosport/2f/35/47/2f3547e5fe4c9c4ae4d520a0e2b869f443c3565b_2.module.stsitebuilderviewstemplateshookcontent.tpl.cache.php
942 /vendor/smarty/smarty/libs/sysplugins/smarty_internal_runtime_codeframe.php
943 /vendor/smarty/smarty/libs/sysplugins/smarty_internal_runtime_writefile.php
944 /var/cache/prod/smarty/cache/stsitebuilder/header_product_46320_0_0_font_url/1/1/1/2/1/6/ckcautosport/2c/c1/85/2cc1853d59502575a6e4e3c181484f32874bc151.stsitebuilderviewstemplateshookcontent.tpl.php
945 /modules/stsitebuilder/libs/elementor/core/responsive/responsive.php
946 /modules/stsitebuilder/libs/elementor/core/settings/style-globals/model.php
947 /modules/stsitebuilder/libs/elementor/core/settings/base/model.php
948 /modules/stsitebuilder/libs/elementor/core/frontend/performance.php
949 /modules/stsitebuilder/libs/elementor/includes/controls/text.php
950 /modules/stsitebuilder/libs/elementor/includes/controls/number.php
951 /modules/stsitebuilder/libs/elementor/includes/controls/textarea.php
952 /modules/stsitebuilder/libs/elementor/includes/controls/select.php
953 /modules/stsitebuilder/libs/elementor/includes/controls/switcher.php
954 /modules/stsitebuilder/libs/elementor/includes/controls/button.php
955 /modules/stsitebuilder/libs/elementor/includes/controls/base-ui.php
956 /modules/stsitebuilder/libs/elementor/includes/controls/hidden.php
957 /modules/stsitebuilder/libs/elementor/includes/controls/heading.php
958 /modules/stsitebuilder/libs/elementor/includes/controls/raw-html.php
959 /modules/stsitebuilder/libs/elementor/includes/controls/popover-toggle.php
960 /modules/stsitebuilder/libs/elementor/includes/controls/section.php
961 /modules/stsitebuilder/libs/elementor/includes/controls/tab.php
962 /modules/stsitebuilder/libs/elementor/includes/controls/tabs.php
963 /modules/stsitebuilder/libs/elementor/includes/controls/divider.php
964 /modules/stsitebuilder/libs/elementor/includes/controls/deprecated-notice.php
965 /modules/stsitebuilder/libs/elementor/includes/controls/alert.php
966 /modules/stsitebuilder/libs/elementor/includes/controls/notice.php
967 /modules/stsitebuilder/libs/elementor/includes/controls/color.php
968 /modules/stsitebuilder/libs/elementor/includes/controls/media.php
969 /modules/stsitebuilder/libs/elementor/includes/controls/base-multiple.php
970 /modules/stsitebuilder/libs/elementor/includes/controls/slider.php
971 /modules/stsitebuilder/libs/elementor/includes/controls/base-units.php
972 /modules/stsitebuilder/libs/elementor/includes/controls/dimensions.php
973 /modules/stsitebuilder/libs/elementor/includes/controls/choose.php
974 /modules/stsitebuilder/libs/elementor/includes/controls/wysiwyg.php
975 /modules/stsitebuilder/libs/elementor/includes/controls/code.php
976 /modules/stsitebuilder/libs/elementor/includes/controls/font.php
977 /modules/stsitebuilder/libs/elementor/includes/fonts.php
978 /modules/stsitebuilder/libs/elementor/includes/controls/image-dimensions.php
979 /modules/stsitebuilder/libs/elementor/includes/controls/gaps.php
980 /modules/stsitebuilder/libs/elementor/includes/controls/wp-widget.php
981 /modules/stsitebuilder/libs/elementor/includes/controls/url.php
982 /modules/stsitebuilder/libs/elementor/includes/controls/repeater.php
983 /modules/stsitebuilder/libs/elementor/includes/interfaces/has-validation.php
984 /modules/stsitebuilder/libs/elementor/includes/controls/icon.php
985 /modules/stsitebuilder/libs/elementor/includes/controls/icons.php
986 /modules/stsitebuilder/libs/elementor/includes/controls/gallery.php
987 /modules/stsitebuilder/libs/elementor/includes/controls/structure.php
988 /modules/stsitebuilder/libs/elementor/includes/controls/select2.php
989 /modules/stsitebuilder/libs/elementor/includes/controls/date-time.php
990 /modules/stsitebuilder/libs/elementor/includes/controls/box-shadow.php
991 /modules/stsitebuilder/libs/elementor/includes/controls/text-shadow.php
992 /modules/stsitebuilder/libs/elementor/includes/controls/select2ac.php
993 /modules/stsitebuilder/libs/elementor/includes/controls/repeater-product.php
994 /modules/stsitebuilder/libs/elementor/includes/controls/groups/background.php
995 /modules/stsitebuilder/libs/elementor/includes/controls/groups/base.php
996 /modules/stsitebuilder/libs/elementor/includes/interfaces/group-control.php
997 /modules/stsitebuilder/libs/elementor/includes/controls/groups/border.php
998 /modules/stsitebuilder/libs/elementor/includes/controls/groups/typography.php
999 /modules/stsitebuilder/libs/elementor/includes/controls/groups/image-size.php
1000 /modules/stsitebuilder/libs/elementor/includes/controls/groups/box-shadow.php
1001 /modules/stsitebuilder/libs/elementor/includes/controls/groups/css-filter.php
1002 /modules/stsitebuilder/libs/elementor/includes/controls/groups/text-shadow.php
1003 /modules/stsitebuilder/libs/elementor/includes/controls/groups/flex-container.php
1004 /modules/stsitebuilder/libs/elementor/includes/controls/groups/grid-container.php
1005 /modules/stsitebuilder/libs/elementor/includes/controls/groups/flex-item.php
1006 /modules/stsitebuilder/libs/elementor/includes/controls/groups/text-stroke.php
1007 /modules/stsitebuilder/libs/elementor/includes/controls/groups/all-query.php
1008 /modules/stsitebuilder/libs/elementor/core/settings/controls/repeater.php
1009 /modules/stsitebuilder/libs/elementor/modules/nested-elements/controls/control-nested-repeater.php
1010 /modules/stsitebuilder/libs/elementor/core/document-types/post.php
1011 /modules/stsitebuilder/libs/elementor/core/document-types/page-base.php
1012 /modules/stsitebuilder/libs/elementor/core/document-types/page.php
1013 /modules/stsitebuilder/libs/elementor/core/settings/page/model.php
1014 /modules/stsitebuilder/libs/elementor/core/settings/base/css-model.php
1015 /modules/stsitebuilder/libs/elementor/core/settings/editor-preferences/model.php
1016 /modules/stsitebuilder/libs/elementor/core/settings/theme-editor-custom-code/model.php
1017 /modules/stsitebuilder/libs/elementor/core/settings/theme-editor-lightbox/model.php
1018 /modules/stsitebuilder/libs/elementor/core/settings/theme-editor-sidebar/model.php
1019 /modules/stsitebuilder/libs/elementor/core/settings/theme-editor-side-cart-panel/model.php
1020 /modules/stsitebuilder/libs/elementor/core/settings/theme-editor-typography/model.php
1021 /modules/stsitebuilder/libs/elementor/core/settings/theme-editor-general/model.php
1022 /modules/stsitebuilder/libs/elementor/includes/conditions.php
1023 /modules/stsitebuilder/libs/elementor/core/settings/theme-editor-buttons/model.php
1024 /modules/stsitebuilder/libs/elementor/core/settings/theme-editor-classic/model.php
1025 /modules/stsitebuilder/libs/elementor/core/settings/child-theme-my-account/model.php
1026 /modules/stsitebuilder/libs/elementor/core/kits/documents/tabs/global-colors.php
1027 /modules/stsitebuilder/libs/elementor/core/kits/documents/tabs/tab-base.php
1028 /modules/stsitebuilder/libs/elementor/core/settings/child-theme-checkout/model.php
1029 /var/cache/prod/smarty/cache/stsitebuilder/header_product_46320_0_0_eb_settings/1/1/1/2/1/6/ckcautosport/2c/c1/85/2cc1853d59502575a6e4e3c181484f32874bc151.stsitebuilderviewstemplateshookcontent.tpl.php
1030 /var/cache/prod/smarty/cache/stsitebuilder/1/1/1/2/1/6/ckcautosport/f2/50/df/f250df2e4b6cc8bddeb6c4090662a329da566f32.stsitebuilderviewstemplateshookheader.tpl.php
1031 /modules/freeshippingamountdisplay/freeshippingamountdisplay.php
1032 /modules/freeshippingamountdisplay/translations/en.php
1033 /classes/assets/PrestashopAssetsLibraries.php
1034 /modules/rcpgtagmanager/src/PSModule/Hook/DisplayHeader/DisplayHeaderPS9.php
1035 /modules/rcpgtagmanager/src/PSModule/Hook/DisplayHeader/AbstractDisplayHeader.php
1036 /modules/rcpgtagmanager/src/PSModule/Configurator/ConfiguratorFactory.php
1037 /modules/rcpgtagmanager/src/PSModule/Configurator/ConfiguratorFactoryInterface.php
1038 /modules/rcpgtagmanager/src/PSModule/Configurator/Components/BingConfigurator.php
1039 /modules/rcpgtagmanager/src/PSModule/Configurator/Components/AbstractConfigurator.php
1040 /modules/rcpgtagmanager/src/PSModule/Form/Section/FormBing.php
1041 /modules/rcpgtagmanager/src/PSModule/Form/Section/AbstractFormSection.php
1042 /modules/rcpgtagmanager/src/PSModule/Form/Section/FormSectionInterface.php
1043 /modules/rcpgtagmanager/src/PSModule/Form/Section/Traits/FeedOptions.php
1044 /modules/rcpgtagmanager/src/PSModule/Form/Validator/PregMatchValidator.php
1045 /modules/rcpgtagmanager/src/PSModule/Form/Validator/ValidatorInterface.php
1046 /modules/rcpgtagmanager/src/PSModule/Context/ContextPS9.php
1047 /modules/rcpgtagmanager/src/PSModule/Context/AbstractContext.php
1048 /modules/rcpgtagmanager/src/PSModule/Context/ContextInterface.php
1049 /modules/rcpgtagmanager/src/PSModule/DataModelHandler/ModelBuilder/ModelBuilderFactoryPS9.php
1050 /modules/rcpgtagmanager/src/PSModule/DataModelHandler/ModelBuilder/ModelBuilderFactoryInterface.php
1051 /modules/rcpgtagmanager/src/PSModule/Adapter/Product/ProductAdapterPS9.php
1052 /modules/rcpgtagmanager/src/PSModule/Adapter/Product/AbstractProductAdapter.php
1053 /modules/rcpgtagmanager/src/PSModule/Adapter/Product/ProductAdapterInterface.php
1054 /modules/rcpgtagmanager/src/PSModule/DataModelHandler/DataModelHandler.php
1055 /modules/rcpgtagmanager/src/PSModule/DataModelHandler/DataModelHandlerInterface.php
1056 /modules/rcpgtagmanager/src/PSModule/DataModelHandler/ModelBuilder/Search/SearchModelBuilderPS9.php
1057 /modules/rcpgtagmanager/src/PSModule/DataModelHandler/ModelBuilder/Search/AbstractSearchModelBuilder.php
1058 /modules/rcpgtagmanager/src/PSModule/DataModelHandler/ModelBuilder/Search/SearchModelBuilderInterface.php
1059 /modules/rcpgtagmanager/src/PSModule/DataModelHandler/ModelBuilder/AbstractModelBuilderInterface.php
1060 /modules/rcpgtagmanager/src/DataModel/Search/SearchModel.php
1061 /modules/rcpgtagmanager/src/PSModule/Token/TokenPS9.php
1062 /modules/rcpgtagmanager/src/PSModule/Token/AbstractToken.php
1063 /modules/rcpgtagmanager/src/PSModule/Token/TokenInterface.php
1064 /modules/rcpgtagmanager/src/PSModule/ModuleDetector/ModuleDetectorPS9.php
1065 /modules/rcpgtagmanager/src/PSModule/ModuleDetector/AbstractModuleDetector.php
1066 /modules/rcpgtagmanager/src/PSModule/ModuleDetector/ModuleDetectorInterface.php
1067 /modules/rcpgtagmanager/src/PSModule/ModuleDetector/OverrideDetector/OverrideDetectorPS9.php
1068 /modules/rcpgtagmanager/src/PSModule/ModuleDetector/OverrideDetector/AbstractOverrideDetector.php
1069 /modules/rcpgtagmanager/src/PSModule/ModuleDetector/OverrideDetector/OverrideDetectorInterface.php
1070 /modules/rcpgtagmanager/src/PSModule/ModuleDetector/OverrideDetector/ConcreteDetector/PresTeamShop/OnePageCheckoutPSPS9.php
1071 /modules/rcpgtagmanager/src/PSModule/ModuleDetector/OverrideDetector/ConcreteDetector/PresTeamShop/AbstractOnePageCheckoutPS.php
1072 /modules/rcpgtagmanager/src/PSModule/ModuleDetector/OverrideDetector/ConcreteDetector/AbstractConcreteDetector.php
1073 /modules/rcpgtagmanager/src/PSModule/ModuleDetector/OverrideDetector/ConcreteDetector/ConcreteDetectorInterface.php
1074 /modules/rcpgtagmanager/src/PSModule/DataModelHandler/ModelBuilder/User/UserModelBuilderPS9.php
1075 /modules/rcpgtagmanager/src/PSModule/DataModelHandler/ModelBuilder/User/AbstractUserModelBuilder.php
1076 /modules/rcpgtagmanager/src/PSModule/DataModelHandler/ModelBuilder/User/UserModelBuilderInterface.php
1077 /modules/rcpgtagmanager/src/DataModel/User/UserModel.php
1078 /modules/rcpgtagmanager/src/DataModel/User/GroupModelList.php
1079 /modules/rcpgtagmanager/src/DataModel/User/AddressModel.php
1080 /modules/rcpgtagmanager/src/DataModel/User/StatsModel.php
1081 /modules/rcpgtagmanager/src/DataModel/User/UserModelPresenter.php
1082 /modules/rcpgtagmanager/src/DataModel/ModelPresenterInterface.php
1083 /modules/rcpgtagmanager/src/PSModule/Configurator/Components/CriteoConfigurator.php
1084 /modules/rcpgtagmanager/src/PSModule/Form/Section/FormCriteo.php
1085 /modules/rcpgtagmanager/src/PSModule/Configurator/Components/FacebookConfigurator.php
1086 /modules/rcpgtagmanager/src/PSModule/Form/Section/FormFacebook.php
1087 /modules/rcpgtagmanager/src/PSModule/Configurator/Components/GA4Configurator.php
1088 /modules/rcpgtagmanager/src/PSModule/Form/Section/FormGA4.php
1089 /modules/rcpgtagmanager/src/PSModule/Configurator/Components/GAdsConfigurator.php
1090 /modules/rcpgtagmanager/src/PSModule/Form/Section/FormGAds.php
1091 /modules/rcpgtagmanager/src/PSModule/Configurator/Components/GTMConfigurator.php
1092 /modules/rcpgtagmanager/src/PSModule/Form/Section/FormGTM.php
1093 /modules/rcpgtagmanager/src/PSModule/Configurator/Components/GoogleFeedConfigurator.php
1094 /modules/rcpgtagmanager/src/PSModule/Form/Section/FormGoogleFeed.php
1095 /modules/rcpgtagmanager/src/PSModule/Configurator/Components/KelkooConfigurator.php
1096 /modules/rcpgtagmanager/src/PSModule/Form/Section/FormKelkoo.php
1097 /modules/rcpgtagmanager/src/PSModule/Form/Transformer/MultiInputArrayTransformer.php
1098 /modules/rcpgtagmanager/src/PSModule/Form/Transformer/AbstractTransformer.php
1099 /modules/rcpgtagmanager/src/PSModule/Form/Transformer/DataTransformerInterface.php
1100 /modules/rcpgtagmanager/src/PSModule/Configurator/Components/PinterestConfigurator.php
1101 /modules/rcpgtagmanager/src/PSModule/Form/Section/FormPinterest.php
1102 /modules/rcpgtagmanager/src/PSModule/Configurator/Components/TikTokConfigurator.php
1103 /modules/rcpgtagmanager/src/PSModule/Form/Section/FormTikTok.php
1104 /modules/rcpgtagmanager/src/PSModule/Configurator/Components/TwitterConfigurator.php
1105 /modules/rcpgtagmanager/src/PSModule/Form/Section/FormTwitter.php
1106 /var/cache/prod/smarty/compile/ckcautosport/57/19/bc/5719bcd20a3358c5d8c9ac72a27921b0af994492_2.module.rcpgtagmanagerviewstemplateshookheader.tpl.php
1107 /vendor/smarty/smarty/libs/sysplugins/smarty_internal_block.php
1108 /vendor/smarty/smarty/libs/sysplugins/smarty_internal_runtime_inheritance.php
1109 /modules/onepagecheckoutps/src/Hook/HookDisplayHeaderService.php
1110 /modules/redsys/redsys.php
1111 /modules/redsys/api/apiRedsys.php
1112 /modules/redsys/api/json.php
1113 /modules/redsys/api/hmac.php
1114 /modules/redsys/api/hash.php
1115 /modules/redsys/classes/RedsysTpv.php
1116 /classes/PaymentModule.php
1117 /modules/redsys/translations/en.php
1118 /modules/paypal/paypal.php
1119 /modules/paypal/config_prod.php
1120 /modules/paypal/classes/Shortcut/ShortcutConfiguration.php
1121 /modules/paypal/smarty/plugins/modifier.paypalreplace.php
1122 /modules/paypal/translations/en.php
1123 /modules/paypal/services/ToolKit.php
1124 /modules/paypal/classes/Constants/PaypalConfigurations.php
1125 /modules/paypal/classes/InstallmentBanner/ConfigurationMap.php
1126 /modules/paypal/classes/Constants/WebHookConf.php
1127 /modules/paypal/vendor/ppbtlib/src/Extensions/ProcessLogger/ProcessLoggerExtension.php
1128 /modules/paypal/vendor/ppbtlib/src/Extensions/AbstractModuleExtension.php
1129 /modules/paypal/vendor/ppbtlib/src/Extensions/Diagnostic/DiagnosticExtension.php
1130 /modules/paypal/vendor/ppbtlib/src/Extensions/Diagnostic/Stubs/Model/Constant/DiagnosticHook.php
1131 /modules/paypal/vendor/ppbtlib/src/Extensions/Diagnostic/Stubs/Storage/StubStorage.php
1132 /modules/paypal/vendor/ppbtlib/src/Extensions/Diagnostic/Stubs/Storage/DiagnosticRetriever.php
1133 /modules/paypal/diagnostic.php
1134 /modules/paypal/vendor/ppbtlib/src/Extensions/Diagnostic/Stubs/Model/ModuleConfigModel.php
1135 /modules/paypal/classes/AbstractMethodPaypal.php
1136 /modules/paypal/vendor/ppbtlib/src/AbstractMethod.php
1137 /modules/paypal/classes/MethodEC.php
1138 /modules/paypal/classes/WhiteList/WhiteListService.php
1139 /modules/paypal/classes/API/PaypalApiManager.php
1140 /modules/paypal/classes/API/PaypalApiManagerInterface.php
1141 /modules/paypal/classes/API/PaypalVaultApiManagerInterface.php
1142 /modules/paypal/classes/API/PaypalWebhookApiManagerInterface.php
1143 /modules/paypal/classes/API/PaypalClient.php
1144 /modules/paypal/classes/API/Client/HttpClient.php
1145 /modules/paypal/classes/API/ClientInterface.php
1146 /modules/paypal/classes/API/Environment/PaypalEnvironment.php
1147 /modules/paypal/classes/API/EnvironmentInterface.php
1148 /modules/paypal/classes/API/Injector/AuthorizationInjector.php
1149 /modules/paypal/classes/API/InjectorInterface.php
1150 /modules/paypal/classes/API/Injector/BnCodeInjector.php
1151 /modules/paypal/classes/API/Injector/UserAgentInjector.php
1152 /var/cache/prod/smarty/compile/1f/b5/b4/1fb5b414db934f3cbce1f81a5328eb449f2525ce_2.module.paypalviewstemplatesfrontprefetch.tpl.php
1153 /modules/sldquickorder/sldquickorder.php
1154 /modules/sldquickorder/translations/en.php
1155 /var/cache/prod/smarty/compile/ckcautosport/e2/bb/3b/e2bb3b220954f0e89762d563999328f37348c1c2_2.file.apichatgpt.tpl.php
1156 /var/cache/prod/smarty/compile/ckcautosport/57/31/21/5731214d0553a0a4b6a61168acda092e9900b9d0_2.file.head.tpl.php
1157 /vendor/smarty/smarty/libs/plugins/modifier.escape.php
1158 /modules/dusnicsyncocc/dusnicsyncocc.php
1159 /modules/dusnicsyncocc/classes/dusnicsyncoccsutils.php
1160 /modules/dusnicsyncocc/translations/en.php
1161 /modules/desoccfeatures/desoccfeatures.php
1162 /modules/desoccfeatures/classes/OccSupplierOrder.php
1163 /modules/desoccfeatures/classes/OccApiService.php
1164 /modules/desoccfeatures/classes/OccSyncProcessor.php
1165 /modules/desoccfeatures/translations/en.php
1166 /modules/descpdftoreference/descpdftoreference.php
1167 /modules/descpdftoreference/translations/en.php
1168 /modules/desoccstockerp/desoccstockerp.php
1169 /modules/desoccstockerp/translations/en.php
1170 /modules/dessoccerp/dessoccerp.php
1171 /modules/dessoccerp/translations/en.php
1172 /modules/stsitebuilder/classes/DB/StSiteBuilderPostmetaClass.php
1173 /var/cache/prod/smarty/compile/ckcautosport/5b/54/52/5b5452d6a94a6444d6452c4c16d7ff0ae4b5d320_2.module.stsitebuilderviewstemplatesfronttemplate12230.tpl.php
1174 /modules/ps_languageselector/ps_languageselector.php
1175 /var/cache/prod/smarty/compile/ckcautosport/1c/00/f7/1c00f78dace25d509ec3a1f54176b7ae2000accf_2.module.ps_languageselectorps_languageselector.tpl.php
1176 /modules/ps_languageselector/translations/en.php
1177 /vendor/smarty/smarty/libs/sysplugins/smarty_internal_runtime_foreach.php
1178 /var/cache/prod/smarty/compile/ckcautosport/81/5c/6a/815c6a45efc465b1f2609366fe379061991043c9_2.module.stsitebuilderviewstemplateshookcustomersignin.tpl.php
1179 /var/cache/prod/smarty/compile/ckcautosport/27/d1/58/27d158866aa66c11ea3cd8735b38049861aa3587_2.module.stsitebuilderviewstemplateshooksigninlabel.tpl.php
1180 /var/cache/prod/smarty/compile/ckcautosport/9f/3d/0e/9f3d0ea5586f0ed98b8409b25763a8fffbc700f1_2.module.stsitebuilderviewstemplateshookshoppingcart.tpl.php
1181 /var/cache/prod/smarty/compile/ckcautosport/2a/dd/3d/2add3d7a9544fcad0aa249a0a570542673e38322_2.module.stsitebuilderviewstemplateshookcartlabel.tpl.php
1182 /var/cache/prod/smarty/compile/ckcautosport/63/da/0f/63da0f35786beeed0be052bfdf21711b4bfc5a13_2.module.stsitebuilderviewstemplateshooksearch.tpl.php
1183 /modules/stsitebuilder/src/Repository/GeneralRepository.php
1184 /modules/stsitebuilder/classes/data/provider/Search.php
1185 /src/Adapter/Presenter/Category/CategoryPresenter.php
1186 /src/Adapter/Presenter/Category/CategoryLazyArray.php
1187 /var/cache/prod/smarty/compile/ckcautosport/1e/c4/77/1ec47782dc7b153aabb08033b3ece796eca384b7_2.module.stsitebuilderviewstemplatesfronttemplate240961.tpl.php
1188 /modules/ps_currencyselector/ps_currencyselector.php
1189 /var/cache/prod/smarty/compile/ckcautosport/b9/77/56/b97756c07f8c7dd53da6530f78f67ddd242f77c9_2.module.ps_currencyselectorps_currencyselector.tpl.php
1190 /modules/ps_currencyselector/translations/en.php
1191 /var/cache/prod/smarty/compile/ckcautosport/30/5b/df/305bdfc3e67daac6124d12c98e3737b59bd1046d_2.module.stsitebuilderviewstemplatesfronttemplate12740.tpl.php
1192 /var/cache/prod/smarty/compile/ckcautosportmodule_stsitebuilder_views_templates_front_layouts_layout_full_width_tpl/66/bb/e2/66bbe227a8cbe362ce3bba249376f7027f93db54_2.file.product.tpl.php
1193 /var/cache/prod/smarty/compile/ckcautosportmodule_stsitebuilder_views_templates_front_layouts_layout_full_width_tpl/4b/2e/80/4b2e80ce1edaa710689e03fb87223c206a747d46_2.module.stsitebuilderviewstemplatesfrontlayoutslayoutfullwidth.tpl.php
1194 /var/cache/prod/smarty/compile/ckcautosportmodule_stsitebuilder_views_templates_front_layouts_layout_full_width_tpl/5a/e7/13/5ae713b7bb2e80d3bf590bb939dfc3709208ac23_2.file.layout-full-width.tpl.php
1195 /var/cache/prod/smarty/compile/ckcautosportmodule_stsitebuilder_views_templates_front_layouts_layout_full_width_tpl/8a/1e/db/8a1edbb927a318a81eb4e2192cdb8e81fb6faff2_2.file.layout-both-columns.tpl.php
1196 /var/cache/prod/smarty/compile/ckcautosportmodule_stsitebuilder_views_templates_front_layouts_layout_full_width_tpl/ff/4f/f2/ff4ff28a872b01055c79c2571c3ec782810cff81_2.file.helpers.tpl.php
1197 /vendor/smarty/smarty/libs/sysplugins/smarty_internal_runtime_tplfunction.php
1198 /var/cache/prod/smarty/compile/ckcautosportmodule_stsitebuilder_views_templates_front_layouts_layout_full_width_tpl/ec/1c/0d/ec1c0dac57edbe64d3bb3e24a853902ebec2af56_2.file.head.tpl.php
1199 /var/cache/prod/smarty/compile/ckcautosportmodule_stsitebuilder_views_templates_front_layouts_layout_full_width_tpl/ae/37/4a/ae374abd4925856735f754b18ee0ab8d7250c5a2_2.file.head-jsonld.tpl.php
1200 /var/cache/prod/smarty/compile/ckcautosportmodule_stsitebuilder_views_templates_front_layouts_layout_full_width_tpl/ea/df/4f/eadf4f070a71e38038aa70810584351f27f152af_2.file.product-jsonld.tpl.php
1201 /vendor/smarty/smarty/libs/plugins/modifier.regex_replace.php
1202 /vendor/smarty/smarty/libs/plugins/modifier.date_format.php
1203 /vendor/smarty/smarty/libs/plugins/modifier.count.php
1204 /vendor/smarty/smarty/libs/plugins/shared.make_timestamp.php
1205 /var/cache/prod/smarty/compile/ckcautosportmodule_stsitebuilder_views_templates_front_layouts_layout_full_width_tpl/54/f5/1d/54f51d92ff0a4ed65d07247ba481a16d84ac77d3_2.file.pagination-seo.tpl.php
1206 /vendor/smarty/smarty/libs/plugins/modifier.replace.php
1207 /var/cache/prod/smarty/compile/ckcautosportmodule_stsitebuilder_views_templates_front_layouts_layout_full_width_tpl/72/f0/3e/72f03ec83d9b40c889818cfb3a76ee4c51d3d83c_2.file.stylesheets.tpl.php
1208 /var/cache/prod/smarty/compile/ckcautosportmodule_stsitebuilder_views_templates_front_layouts_layout_full_width_tpl/6b/13/91/6b13913cbab0023dcb3cb73cc3d1d16ac6554d21_2.file.javascript.tpl.php
1209 /classes/ProductDownload.php
1210 /src/Core/Cart/Calculator.php
1211 /src/Core/Cart/CartRowCollection.php
1212 /src/Core/Cart/Fees.php
1213 /src/Core/Cart/AmountImmutable.php
1214 /src/Core/Cart/CartRuleCollection.php
1215 /src/Core/Cart/CartRuleCalculator.php
1216 /src/Adapter/Product/PriceCalculator.php
1217 /src/Core/Cart/CartRow.php
1218 /var/cache/prod/smarty/compile/ckcautosportmodule_stsitebuilder_views_templates_front_layouts_layout_full_width_tpl/90/56/b7/9056b74a040fb6cdd854ccfa3914233f5381dcdc_2.file.product-activation.tpl.php
1219 /var/cache/prod/smarty/compile/ckcautosportmodule_stsitebuilder_views_templates_front_layouts_layout_full_width_tpl/2e/e1/b4/2ee1b452c31d66e92e46000e2b89867e07ac4f77_2.file.notifications.tpl.php
1220 /var/cache/prod/smarty/compile/ckcautosport/39/b3/11/39b3116e51d06acd4e8a062eabab1aa9cc57096e_2.module.stsitebuilderviewstemplatesfronttemplate12950.tpl.php
1221 /var/cache/prod/smarty/compile/ckcautosport/1c/55/01/1c55015906203bc714ee23efaa9d9361d24651a7_2.module.stsitebuilderviewstemplateshookbreadcrumbnav.tpl.php
1222 /var/cache/prod/smarty/compile/ckcautosport/7c/78/19/7c7819651312587068ab48e1dbeae46da07f768c_2.file.category_search.tpl.php
1223 /var/cache/prod/smarty/compile/ckcautosport/a5/d7/03/a5d703654a856ecb10ede2e9656be14e015c3676_2.file.category_search.tpl.php
1224 /modules/des_categorytree/des_categorytree.php
1225 /var/cache/prod/smarty/compile/ckcautosport/cf/f2/c9/cff2c951ce67550ad4fe7563a77d13c3633792ea_2.module.des_categorytreeviewstemplateshookps_categorytree.tpl.php
1226 /var/cache/prod/smarty/compile/ckcautosport/4d/ed/f9/4dedf9ff4eced7eaca924529e006ba458cd857c3_2.file.displayProductShippingTag.tpl.php
1227 /src/Core/Domain/Product/ProductCustomizabilitySettings.php
1228 /var/cache/prod/smarty/compile/ckcautosport/eb/6e/40/eb6e404185a0d839102b77814fc8b22a68df2ce2_2.module.stsitebuilderviewstemplateshook_partialsquantity_box.tpl.php
1229 /var/cache/prod/smarty/compile/ckcautosport/42/c6/19/42c619e855ea6b17960a404d6f5d8711c51ac735_2.file.displayProductAdditionalInfo.tpl.php
1230 /classes/Feature.php
1231 /modules/stsitebuilder/src/Repository/ProductRepository.php
1232 /src/Core/Product/Search/ProductSearchQuery.php
1233 /src/Core/Product/Search/SortOrder.php
1234 /src/Adapter/Category/CategoryProductSearchProvider.php
1235 /src/Core/Product/Search/SortOrdersCollection.php
1236 /src/Core/Product/Search/ProductSearchResult.php
1237 /src/Adapter/Presenter/Product/ProductListingLazyArray.php
1238 /vendor/smarty/smarty/libs/sysplugins/smarty_internal_runtime_capture.php
1239 /var/cache/prod/smarty/compile/ckcautosport/10/97/df/1097df4a147d5b67304869c3fa52511b66530aa5_2.module.stsitebuilderviewstemplatesfronttemplate2860.tpl.php
1240 /var/cache/prod/smarty/compile/ckcautosport/e3/1b/eb/e31beb541832f60247e83f559cdf768dfe97d7cf_2.file.footer.tpl.php
1241 /var/cache/prod/smarty/compile/ckcautosportmodule_stsitebuilder_views_templates_front_layouts_layout_full_width_tpl/d4/32/a3/d432a3ef15a767dd5fbb30857ae5211497a87f71_2.file.password-policy-template.tpl.php
1242 /modules/statsdata/statsdata.php
1243 /classes/Connection.php
1244 /classes/ConnectionsSource.php
1245 /var/cache/prod/smarty/cache/stsitebuilder/before_body_closing_tag/1/1/1/2/1/6/ckcautosport/a5/35/eb/a535eb00190c02a685bde33931fcc4e1e4ddf2a4.stsitebuilderviewstemplateshookbefore_body_closing_tag.tpl.php
1246 /var/cache/prod/smarty/compile/ckcautosport/dc/33/31/dc3331f7c3611229d06953eff882343b62b5fae2_2.module.stsitebuilderviewstemplatesfronttemplate12841120.tpl.php
1247 /var/cache/prod/smarty/compile/ckcautosport/35/3b/fa/353bfaef757200861cad6667c145d4f9d7e6ec33_2.module.stsitebuilderviewstemplatesfronttemplate125120.tpl.php
1248 /var/cache/prod/smarty/compile/ckcautosport/88/be/f0/88bef079f6c418ad57b6e736ce5cd05960572a8d_2.module.stsitebuilderviewstemplatesfronttemplate124120.tpl.php
1249 /var/cache/prod/smarty/compile/ckcautosport/17/6c/22/176c221a786db812cac15eb1622ea9fa660a2052_2.module.stsitebuilderviewstemplateshooksidebarcustomersignin.tpl.php
1250 /var/cache/prod/smarty/compile/ckcautosport/61/4a/96/614a965c02da661e2bc5a0d2154045b1df951581_2.module.stsitebuilderviewstemplatesfronttemplate123120.tpl.php
1251 /var/cache/prod/smarty/compile/ckcautosport/02/39/91/0239914916c11f1863783394b5fe72a1a151e072_2.module.stsitebuilderviewstemplateshooksidebarside_panel.tpl.php
1252 /modules/stsitebuilder/classes/data/element/Location.php
1253 /var/cache/prod/smarty/compile/ckcautosport/5e/eb/ef/5eebef83845f1b29b75fc106bc46d53f5370584c_2.module.stsitebuilderviewstemplateshookbackgroundlazyload.tpl.php
1254 /modules/rcpgtagmanager/src/PSModule/Hook/DisplayBeforeBodyClosingTag/DisplayBeforeBodyClosingTagPS9.php
1255 /modules/rcpgtagmanager/src/PSModule/Hook/DisplayBeforeBodyClosingTag/AbstractDisplayBeforeBodyClosingTag.php
1256 /modules/rcpgtagmanager/src/DataModel/Product/ProductModelList.php
1257 /modules/rcpgtagmanager/src/DataModel/Product/ProductModelListInterface.php
1258 /modules/rcpgtagmanager/src/PSModule/DataModelHandler/ModelBuilder/Product/ProductModelBuilderPS9.php
1259 /modules/rcpgtagmanager/src/PSModule/DataModelHandler/ModelBuilder/Product/AbstractProductModelBuilder.php
1260 /modules/rcpgtagmanager/src/PSModule/DataModelHandler/ModelBuilder/Product/ProductModelBuilderInterface.php
1261 /modules/rcpgtagmanager/src/DataModel/Product/ProductModel.php
1262 /modules/rcpgtagmanager/src/DataModel/Category/CategoryModel.php
1263 /modules/rcpgtagmanager/src/PSModule/DataModelHandler/ModelBuilder/Category/CategoryModelBuilderPS9.php
1264 /modules/rcpgtagmanager/src/PSModule/DataModelHandler/ModelBuilder/Category/AbstractCategoryModelBuilder.php
1265 /modules/rcpgtagmanager/src/PSModule/DataModelHandler/ModelBuilder/Category/CategoryModelBuilderInterface.php
1266 /modules/rcpgtagmanager/src/DataModel/Product/ProductModelPresenter.php
1267 /var/cache/prod/smarty/compile/ckcautosport/44/76/fc/4476fcbbdf2fbe779dcf11308a601efed38bf44d_2.module.rcpgtagmanagerviewstemplateshookfooter.tpl.php